Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG15 : Réunion 2011-02-14 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG15  C (2011-02-14) 

UIT-T SG15

Transport network structures

Période d'études 2009

Réunion  du 2011-02-14 au 2011-02-25

Lieu : Suisse [Genève]

Autres réunions : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Resultats:66 documents
Résultats :  1 - 2  - Suivant Next
Contributions  [ AI/Question: Q10/15 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 1518 ]  
 
Structuring of MPLS-TP Recommendations     Telefónica Investigación y Desarrollo   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-11
[ 1508 ]  
 
Proposal on adding bandwidth degradation message in Y.1731     Huawei   Q10/15   2011-02-02
[ 1499 ]  
 
Requirement summary for adaptive bandwidth in packet network     Huawei   Q9/15, Q10/15   2011-02-02
[ 1467 ]  
(Rev.1) 
Allocation and assignment of experimental and non-standard code points     United States of America   Q10/15   2011-02-02
[ 1465 ]  
(Rev.1) 
USA on Consent of Draft Recommendation G.tpoam     United States of America   Q10/15   2011-02-02
[ 1461 ]  
 
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications"     NSN   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1449 ]  
 
Further consideration of requirements for on-demand segment monitoring in MPLS-TP     NTT , Telecom Italia   Q12/15, Q10/15   2011-02-02
[ 1448 ]  
 
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP     NTT   Q12/15, Q10/15   2011-02-02
[ 1447 ]  
 
Proposal for additional delay measurement functions in MPLS-TP OAM     NTT   Q9/15, Q14/15, Q10/15   2011-02-02
[ 1445 ]  
 
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions     ISOC   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1441 ]  
 
Withdrawn: MPLS-TP Standards     BT   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1439 ]  
 
Comments on differentiation of MPLS-TP environments     NSN   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1385 ]  
 
Support for the consent of G.8110.1 and G.tpoam     Italy   Q12/15, Q10/15   2011-02-01
[ 1384 ]  
 
Structure and content of the MPLS-TP Recommendations     Telecom Italia   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1383 ]  
 
Supporting consent of G.tpoam and choice of Associated Channel Type     Telecom Italia   Q10/15   2011-02-01
[ 1377 ]  
 
Proposed text for inclusion in G.8021 for Frame Loss Measurement     Huawei , China Mobile Communication Corporation   Q9/15, Q10/15   2011-02-01
[ 1376 ]  
 
Proposed text for defining "in-profile" frames in Y.1731     NTT , NEC   Q10/15   2011-02-01
[ 1372 ]  
 
Withdrawn: Continued cooperation with IETF on MPLS for Transport Networks     Israel   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1370 ]  
 
Comments on working assumption at Berlin meeting and TD377 (wd31r1)     NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon   Q9/15, Q12/15, Q10/15   2011-02-01
[ 1365 ]  
 
Status of IETF OAM tools for MPLS-TP     NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon   Q10/15   2011-02-01
[ 1362 ]  
 
Support for the consent of G.8110.1 and G.tpoam     SK Telecom , ETRI   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1361 ]  
 
Structure of the MPLS-TP Recommendations     SK Telecom , ETRI   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1360 ]  
 
Proposed text for channel type value in G.tpoam     SK Telecom , ETRI   Q10/15   2011-02-01
[ 1339 ]  
 
Fulfilling the OAM Requirements for MPLS-TP     NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon   Q10/15   2011-02-01
[ 1329 ]  
 
Rationale for support of 1SL in Y.1731 and G.8021     AT&T , Verizon   Q9/15, Q10/15   2011-02-01
[ 1327 ]  
 
Proposal to define MI for G-Ach packets     Fujitsu , Hitachi , NEC   Q9/15, Q14/15, Q10/15   2011-02-01
[ 1326 ]  
 
Proposal to update the clause 9.3.2 in Y.1731     Fujitsu   Q10/15   2011-02-01
[ 1325 ]  
 
Proposal to define Generic Notification message for ETH-OAM and Consideration on its application     Fujitsu   Q9/15, Q10/15   2011-02-01
[ 1313 ]  
 
Comments on GAL/G-Ach code points for MPLS-TP OAM operation     Hitachi   Q10/15   2011-02-01
[ 1311 ]  
 
Consideration of implementing both PTN-AOM and BFD-OAM     Hitachi   Q10/15   2011-02-01
[ 1310 ]  
 
Withdrawn by TSB (duplicate): See C-1292, "Validation and Versioning of Y.1731 PDUs"     Cisco   Q10/15   2011-02-01
[ 1309 ]  
 
Withdrawn by TSB (duplicate): See C-1291, "Opcodes for SLM"     Cisco   Q10/15   2011-02-01
[ 1306 ]  
 
Support for the consent of G.8110.1 and G.tpoam     Portugal Telecom   Q12/15, Q10/15   2011-02-01
[ 1305 ]  
 
Procedural issues on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-02-01
[ 1304 ]  
 
Proposed text for G.tpoam     Cisco , BT , Ericsson , Juniper , NSN , Qwest , Telenor , Verizon   Q10/15   2011-02-01
[ 1303 ]  
 
Inter SDO Cooperation on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5   2011-02-01
[ 1302 ]  
 
Technical issues with an OAM protocol based on draft-bhh-mpls-tp-oam-y1731     Cisco , BT , Juniper , NSN , Qwest , Telenor , Telstra , Verizon   Q10/15   2011-02-01
[ 1301 ]  
 
Operator Requirements for MPLS-TP OAM     Verizon , BT , France Telecom Orange , Qwest , Telenor , Telstra   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1300 ]  
 
Rationale to support Test ID in Delay Measurement in Y.1731 and G.8021     Verizon , AT&T   Q9/15, Q10/15   2011-02-01
[ 1299 ]  
 
Comments on content of clauses 8 and 9 of G.tpoam     Cisco , Juniper , Verizon   Q9/15, Q10/15   2011-02-01
[ 1298 ]  
 
MPLS-TP OAM - issues with the proposed Y.1731 based OAM solution     Juniper Networks , Cisco , NSN , Verizon   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1292 ]  
 
Validation and Versioning of Y.1731 PDUs     Cisco   Q10/15   2011-02-01
[ 1291 ]  
 
Opcodes for SLM     Cisco   Q10/15   2011-02-01
[ 1269 ]  
 
Proposed text for inclusion in Y.1731 for Frame Loss Measurement     Huawei   Q9/15, Q10/15   2011-01-31
[ 1249 ]  
 
PTN OAM upgrade from G.8114 to G-Ach+Y.1731 in China Mobile     CATR , China Mobile   Q10/15   2011-01-31
[ 1248 ]  
 
PTN GACh+Y.1731 OAM interoperability test activities and result     CATR , China Mobile   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1247 ]  
 
Support for the consent of G.8110.1 and G.tpoam     China MIIT   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1243 ]  
 
Comments on the extension of proactive loss measurement in Y.1731/G.8021     NEC , Hitatchi   Q9/15, Q10/15   2011-01-31
[ 1239 ]  
 
Proposed clarification of ETH-CSF specification in Y.1731     NEC   Q9/15, Q10/15   2011-01-31
[ 1207 ]  
 
Support for consent of G.tpoam     ZTE , Alcatel-Lucent Shanghai Bell , Fiberhome , Huawei   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
Resultats:66 documents
Résultats :  1 - 2  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-4-19