Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG13 : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG13  C 

UIT-T SG13

Gestion et coordination de projets; Architecture et principes de l?intégration des réseaux; Réseaux et mécanismes multiprotocoles; Qualité de fonctionnement des réseaux et gestion des ressources

Période d'études 2005

Resultats:86 documents
Résultats :  1 - 2  - Suivant Next
Contributions  [ AI/Question: Q4/13 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 551 ]  
 
Proposal on adding study item and task in Q13/SG12 for IPTV performance monitoring     China Telecom   Q4/13, IPTV-GSI   2008-01-11
[ 545 ]  
 
Proposed General Architecture in Y.ngn-account-R2     ETRI   Q4/13, Q2/13   2008-01-09
[ 543 ]  
 
Proposed Modification of the Clause 9 Procedures in Y.mpm     ETRI   Q4/13   2008-01-08
[ 542 ]  
(Rev.1) 
Additional description on Rn and Rc reference point for y.racf-mpls centralized architecture     ETRI   Q4/13   2008-01-08
[ 541 ]  
 
Proposed Modification of the Clause 7. Reference Measurement Network Model in Y.mpm     ETRI   Q4/13   2008-01-08
[ 537 ]  
 
Proposed Modification of the Clause 8.3. Reference Points in Y.mpm     ETRI   Q4/13   2008-01-08
[ 536 ]  
 
Proposed Modification of the Clause 8.2. Functional Architecture in Y.mpm     ETRI   Q4/13   2008-01-08
[ 535 ]  
 
Proposed Modification of the Clause 8.1. General Architecture in Y.mpm     ETRI   Q4/13   2008-01-08
[ 515 ]  
 
Proposed modifications to section 6.2 in Y.enet     ETRI   Q4/13   2008-01-08
[ 503 ]  
 
Supplement to Appendix V in Y.RACF R2     ZTE Corporation   Q4/13   2008-01-08
[ 502 ]  
 
Proposal to add the PD-FE selection function of TRC-FE and PE-FE     ZTE Corporation   Q4/13   2008-01-08
[ 501 ]  
 
Proposal to add the function of processing the resource control granularity     ZTE Corporation   Q4/13   2008-01-08
[ 500 ]  
 
Proposal to add new resource control scenarios for nomadism     ZTE Corporation   Q4/13   2008-01-08
[ 499 ]  
 
Modification to the hand-over procedure     ZTE Corporation   Q4/13   2008-01-08
[ 498 ]  
 
CPE-requested QoS resource reservation procedure triggered by TRE-FE     ZTE Corporation   Q4/13   2008-01-08
[ 490 ]  
 
Proposed changes to resource control procedure consideration for Y.racf-mpls     ZTE Corporation   Q4/13   2008-01-08
[ 485 ]  
 
Proposal on modification of Rn and TRE-FE of Y.RACF     ZTE Corporation   Q4/13   2008-01-08
[ 484 ]  
 
Proposal on modification of function overview of Y.MPLS-RACF     ZTE Corporation   Q4/13   2008-01-08
[ 480 ]  
 
Proposal for Resource Control Scenarios for Mobility in RACF     ZTE Corporation   Q4/13   2008-01-08
[ 478 ]  
 
Modification to the procedure for pull mode in Y.RACF R2     ZTE Corporation   Q4/13   2008-01-08
[ 477 ]  
 
Add a information component to Rs in Y.RACF R2     ZTE Corporation   Q4/13   2008-01-08
[ 454 ]  
 
Initial Draft on Requirements for Flow Aggregate Parameter Exchange in NGN     ETRI   Q4/13   2008-01-07
[ 453 ]  
 
Proposed initial document for RACF-MPLS for centralized architecture     ETRI   Q4/13   2008-01-07
[ 452 ]  
(Rev.1) 
Considerations on mobility aspects of clause 9.3 in Y.RACF(Y.2111)     ETRI   Q4/13   2008-01-07
[ 446 ]  
 
Proposed changes to Appendix IV     Huawei Technologies Co., Ltd.   Q4/13   2008-01-07
[ 432 ]  
 
Proposed to section 7 of RACF R2     Huawei Technologies Co., Ltd.   Q4/13   2008-01-07
[ 431 ]  
 
Proposal for additional text on Resource Admission Control with mobility support     Huawei Technologies Co., Ltd.   Q4/13   2008-01-07
[ 429 ]  
 
Proposal for additional scenario of resource control for multicast     Huawei Technologies Co., Ltd.   Q4/13   2008-01-07
[ 417 ]  
 
Proposed texts to Rh interface     China Telecom, Huawei Technologies Co., Ltd   Q4/13, Q5/11   2008-01-07
[ 404 ]  
 
Mechanism for authenticating flow of bearer traffic in NGN (contribution to the draft Recommendation Y.NGN Security Mechanisms)     Lucent Technologies, USA   Q4/13, Q15/13   2008-01-06
[ 403 ]  
 
Enhance RACF procedures (Y.RACF R2) for Multicast Admission Control     Lucent Technologies   Q4/13   2008-01-06
[ 402 ]  
 
Complement Information Components of Rp reference point in Y.RACF R2     Lucent Technologies   Q4/13   2008-01-06
[ 401 ]  
 
Complement functional requirements of Rp reference point in Y.RACF R2     Lucent Technologies   Q4/13   2008-01-06
[ 400 ]  
 
Modification of Multicast Admission Control Examples in Y.RACF R2     Lucent Technologies   Q4/13   2008-01-06
[ 399 ]  
 
Proposed Revisions in Clause 1 (Scope), 5 (Conventions), 6 (Distributed RACF Architecture and Requirements), and Supporting Appendices for Y.RACF-DistribMPLS     AT&T   Q4/13   2008-01-06
[ 398 ]  
 
Proposed Initial Text for Draft Recommendation Y.RACF-DistribMPLS     AT&T   Q4/13   2008-01-06
[ 397 ]  
 
Proposal to Split Y.RACF-MPLS into Two Documents - Centralized Architecture & Distributed Architecture     AT&T & ETRI   Q4/13   2008-01-06
[ 381 ]  
 
Proposals for requirements on inter-domain reference point (Ri) in RACF     KDDI Corporation   Q4/13   2008-01-06
[ 380 ]  
 
Proposals of creating new appendix describing RACF distribution and reliable transaction handling     KDDI Corporation   Q4/13   2008-01-06
[ 379 ]  
 
Proposal for multi-MPM communications based on RTP/RTCP in Y.mpm     KDDI Corporation   Q4/13   2008-01-06
[ 373 ]  
 
Revised draft Recommendation Y.enet "Ethernet QoS control Next Generation Networks"     Korea (Republic of)   Q4/13   2008-01-07
[ 368 ]  
 
Proposed modifications to Sections 7.3 and 7.4 of Y.enet     Korea (Republic of)   Q4/13   2008-01-07
[ 305 ]  
 
Proposal Regarding Topology and Resource Information Retrieval in RACF-R2     Hitachi, Ltd.   Q4/13   2008-01-03
[ 273 ]  
 
Updated draft for Y.mpls-racf     ETRI   Q4/13   2007-04-11
[ 272 ]  
 
Improve self completeness of Y.flowreq     ETRI   Q4/13   2007-04-11
[ 271 ]  
 
Proposal for initiating a work on Requirement for flow aggregation in Next generation networks     ETRI   Q4/13   2007-04-11
[ 258 ]  
 
Proposed changes to security consideration for Y.123.qos     Huawei   Q4/13   2007-04-10
[ 257 ]  
 
Multicasting Extension of NACF     Huawei   Q4/13   2007-04-10
[ 254 ]  
 
Multicast Dynamic Scenario     Huawei   Q4/13   2007-04-10
[ 243 ]  
 
Requirement of QoS Control in Metro network     ZTE   Q4/13   2007-04-10
Resultats:86 documents
Résultats :  1 - 2  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-4-16