Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-T : SG13 : Réunion 2008-09-12 : Documents Temporaires  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-T SG13  TD-GEN (2008-09-12) 

UIT-T SG13

Gestion et coordination de projets; Architecture et principes de l?intégration des réseaux; Réseaux et mécanismes multiprotocoles; Qualité de fonctionnement des réseaux et gestion des ressources

Période d'études 2005

Réunion  du 2008-09-12 au 2008-09-12

Lieu : Suisse [Genève]

Autres réunions : 2009-09-01  2009-01-12  [ 2008-09-12 ]  2008-05-22  2008-01-14  2007-09-21  2007-04-16  2006-11-03  2006-07-17  2006-01-16  2005-08-29  2005-04-25  2004-12-07 

Resultats:25 documents
Documents Temporaires  (GEN)  [ AI/Question: QALL/13 ]   Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 346-GEN ]  
 
About draft Recommendation Y.NGN-UbiNet     TSB   QALL/13   2008-09-01
[ 345-GEN ]  
 
NGNs and energy efficiency report     TSB   QALL/13   2008-08-29
[ 342-GEN ]  
 
JCA-AHF report on activities and follow-up proposal (to ITU-T SG2, cc to all ITU-T SGs and TSAG)     JCA-AHF Convener   QALL/13   2008-07-01
[ 341-GEN ]  
 
Considerations of interoperability (NGN-GSI, Geneva, 12-22 May 2008)     Rapporteur Q.3/13   QALL/13   2008-07-01
[ 340-GEN ]  
 
SG Restructuring: Results and proposals from Study Group 12     ITU-T Study Group 12   QALL/13   2008-07-01
[ 337-GEN ]  
 
Revised restructuring input and proposed new/revised Questions     ITU-T Study Group 4   QALL/13   2008-07-01
[ 336-GEN ]  
 
SG 4 Report and request in its role as lead SG on telecommunication management     ITU-T SG 4   QALL/13   2008-07-01
[ 335-GEN ]  
 
Joint Coordination Activity on Management (JCA-Mgt)     ITU-T Study Group 4   QALL/13   2008-07-01
[ 334-GEN ]  
 
LS - SG 6 discussions on ITU-T restructuring     SG 6 Chairman   QALL/13   2008-07-01
[ 327-GEN ]  
 
LS to study groups in ITU and other groups on LS on initiation of a new Question on vehicle gateway platform     ITU-T SG 16   QALL/13   2008-05-19
[ 325-GEN ]  
 
SG 2, Lead Study Group on Service Definition, Numbering, and Routing; Lead Study Group for Telecommunication for Disaster Relief/Early Warning     ITU-T SG2   QALL/13   2008-05-19
[ 322-GEN ]  
 
Liaison Statement from ISO/IEC JTC1/SC6/WG7 to ITU-T SG17 and ITU-T SG13 on launching a New Work Item Proposal on Future Network in SC6 (6N 13598; 6N 13367; 6N 13618)     ISO/IEC JTC 1/SC 6   QALL/13   2008-05-19
[ 318-GEN ]  
 
Liaison to SG 13 and TSAG on proposed merger of Question G/17 and Question P/13 for the next study period     ITU-T SG 17   QALL/13   2008-05-01
[ 316-GEN ]  
 
(1) Report on 4th Fully Networked Car 4-6 March 2008; (2) Announcement of 5th Fully Networked Car 4-5 March 2009     TSB   QALL/13   2008-04-21
[ 315-GEN ]  
 
Question ITU-R 223-2/8: Internet protocol applications over mobile systems     ITU-R Study Group 5 (formerly SG 8)   QALL/13   2008-04-17
[ 313-GEN ]  
 
ITU-T Technology Watch Briefing Report Series (No. 4) - Ubiquitous Sensor Networks (USN)     TSB   QALL/13   2008-03-14
[ 312-GEN ]  
 
Liaison Statement from IETF MMUSIC WG: on-going work on RTSP 2.0 and request for information on RTSP extensions     IETF   QALL/13   2008-03-14
[ 311-GEN ]  
 
Draft SG 15 proposal of New Questions for the next study period of 2009-2012     ITU-T SG 15   QALL/13   2008-03-13
[ 310-GEN ]  
 
Reply to LS entitled "Termination of FG IPTV mandate and beginning of the IPTV-GSI" (ref: FG IPTV-OL-0102)     DSL Forum   QALL/13   2008-03-07
[ 308-GEN ]  
 
Liaison on a proposed breakdown of the ITU-T Focus Group on IdM Use Case Gap Analysis     JCA-IdM Co-convenors   QALL/13   2008-03-04
[ 307-GEN ]  
 
Liaison statement on IEEE OUI assignment for ITU-T     ITU-T SG 15   QALL/13   2008-03-04
[ 306-GEN ]  
 
Liaison statement on SG 15 OTNT Standardization Work Plan     ITU-T SG 15   QALL/13   2008-03-04
[ 305-GEN ]  
 
Liaison statement on new versions of the Access Network Transport (ANT) Standardization Plan and Work Plan.     ITU-T SG 15   QALL/13   2008-03-04
[ 303-GEN ]  
 
Liaison statement on work plan for trusted service provider identity (SPID) Recommendations     Q.6/17 Rapp Group (IdM-GSI event)   QALL/13, Q6/17, IDM-GSI   2008-03-04
[ 301-GEN ]  
 
LS on 3GPP Schedule for Common IMS     3GPP SA WG1   QALL/13   2008-02-07
Resultats:25 documents
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Testez ITU Translate pour la traduction automatique de documents
Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  TSB EDH
Mis à jour le : 2024-4-20