Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP5C : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP5C  C 

UIT-R WP5C

Systèmes hertziens fixes, systèmes en ondes décamétriques et autres systèmes, au dessous de 30 MHz, du service fixe et du service mobile terrestre

Resultats:437 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 137 ]  
 
Reply liaison statement to Working Party 5C - Characteristics of and protection criteria for stations operating in the fixed service in the frequency bands 8 700-8 750 MHz and 10 000-10 500 MHz     WP 7C     2013-04-16
[ 136 ]  
 
Liaison statement to Working Parties 5A, 5B and 5C - Preliminary draft revision of Recommendation ITU-R SA.1626 - Feasibility of sharing between the space research service (space-to Earth) and the fixed and mobile services in the band 14.8-15.35 GHz     WP 7B     2013-04-16
[ 135 ]  
 
Liaison statement to Working Party 5C - Sharing between the EESS (Earth-to-space) and the fixed service in the 7-8 GHz range under WRC-15 Agenda item 1.11     WP 7B     2013-04-15
[ 134 ]  
 
Distribution of antenna elevation in the fixed service     France     2013-04-08
[ 133 ]  
 
Reply to liaison statement on draft Recommendation Y.energyMRM     ITU-T SG 13     2013-03-19
[ 132 ]  
 
Assignment of a document submitted to Study Group 5 - ITU-R Study Groups Vocabulary work     Chairman, SG 5     2013-02-22
[ 131 ]  
 
Reply LS to ITU-R Working Party 1A and Working Parties 5A, 5B and 5C on impact from wired telecommunication (including PLT) on radiocommunication systems     ITU-T SG 9     2013-02-19
[ 130 ]  
 
Liaison statement to ITU-D Study Group 2, ITU-T Study Group 13 Question 15/13, ITU-R Working Parties 5C and 4B - Work progress on development of Handbook on "Global trends in IMT"     WP 5D     2013-02-18
[ 129 ]  
 
Liaison statement to JTG 4-5-6-7 (copy to Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5B, Working Party 5C, Working Party 6A, Working Party 7B, Working Party 7C, Working Party 7D, Working Party 1A, Working Party 3K, Working Party 3M)     WP 5D     2013-02-18
[ 128 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to WPs 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, (WPs 1A, 3K, 3M)) - Suitable frequency ranges above 6 GHz     WP 5D     2013-02-18
[ 127 ]  
 
Study Group 5 activities related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks     ITU-T SG 5     2013-02-15
[ 126 ]  
 
Reply liaison statement on draft revision of Recommendation ITU-R M.1076     ITU-T SG 16     2013-02-13
[ 125 ]  
 
Liaison statement to Working Parties 5A and 5C on further studies on cognitive radio systems (CRS)     WP 5D     2013-02-07
[ 124 ]  
 
Liaison statement to Working Party 6A on further studies on cognitive radio systems (CRS) (copy to Working Parties 1B, 5A and 5C)     WP 5D     2013-02-07
[ 123 ]  
 
Liaison statement to ITU-R Working Party 7B (copied for information to Working Party 5C) - Sharing the 7-8 GHz band between proposed EESS (Earth-to-space) under WRC-15 Agenda item 1.11 and existing terrestrial services     WP 5A     2012-11-28
[ 122 ]  
 
Liaison statement to Working Parties 4A, 7B, 7C and 7D (copy to Working Parties 5B, 5C and 5D) - WRC-15 Agenda item 1.6 - Characteristics of and protection criteria for mobile systems operating in the frequency range 14.5-15.35 GHz     WP 5A     2012-11-21
[ 121 ]  
 
Liaison statement to Working Party 5C - Technical characteristics and protection criteria of the systems in the land mobile service     WP 5A     2012-11-20
[ 120 ]  
 
Liaison statement to Working Parties 5B and 5C (copy for information to Working Party 3L) - WRC-15 Agenda item 1.4 - Status of studies and draft CPM text for WRC-15 Agenda item 1.4     WP 5A     2012-11-20
[ 119 ]  
 
Liaison statement to working Party 4A, 5C and 5D - WRC-15 Agenda item 1.6 - Technical characteristics of and protection criteria for aeronautical mobile systems operating in the frequency range 14.5-15.38     WP 5B     2012-11-19
[ 118 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 and Study Group 4, 5, 6 and 7 - WRC-15 Agenda item 1.1 - Modelling considerations and other considerations for 5-6 GHz frequency range     WP 5B     2012-11-16
[ 117 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C, 5B, 5C 5D, 6A, 7B, 7C, 7D 1A, 3K 3M) for information) - WRC-15 Agenda item 1.1 - Working Party 5A initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     WP 5A     2012-11-16
[ 116 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Workin Parties (4A, 4B, 4C 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) for information) - WRC-15 Agenda item 1.1 - Sharing considerations for the 5-6 GHz frequency range for WRC-15 Agenda item 1.1     WP 5A     2012-11-16
[ 115 ]  
 
Liaison statement to Study Groups 4, 5, 6 and 7 and Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D as concerned Groups for WRC-15 Agenda item 1.1 - Preparations for WRC-15 Agenda item 1.1 - Technical and operational characteristics     JTG 4-5-6-7     2012-12-06
[ 114 ]  
 
Liaison statement to Working Parties 1A, 1B, 5B, 5C and 6A (copy to ITU-T FG-AVA, ITU-T Study Group 2, ITU-D Study Group 2, ITU-D Study Group 1, ETSI ERM TG 17, JCA-AHF) - Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons wiht impaired hearing     WP 5A     2012-11-15
[ 113 ]  
 
Liaison statement to Working Party 5A, 1A, 1B, 5C and 6A, ITU-T FG-AVA, ITU-T Study Group 2, ITU-D Study Group 2, ITU-D Study Group 1, ETSI ERM TG 17, JCA-AHF - Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing     WP 5B     2012-11-14
[ 112 ]  
+Ann.1-8 
Report on the tenth meeting of Working Party 5C (Geneva, 5 - 14 November 2012)     Chairman, WP 5C     2012-11-14
[ 111 ]  
 
Final List of Participants, ITU-R Working Party 5C, Geneva, 5 - 14 November 2012     Director, BR     2012-11-14
[ 110 ]  
 
Assignment of a document submitted to Study Group 5 - Activities of Correspondence Group 3K3 concerning Recommendation ITU-R P.528-3 and propagation model IF-77     Chairman, SG 5     2012-11-12
[ 109 ]  
 
Liaison statement to Working Party 5B (copy for information to Working Parties 1B, 3M, 5C, 7B, 7D) - Information on amateur service systems at 77.5-78 GHz for use in sharing studies for WRC-15 Agenda item 1.18     WP 5A     2012-11-12
[ 108 ]  
(Rev.1) 
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to the relevant Working Parties of Study Groups 1, 3, 4, 5, 6 and 7) - WRC-15 Agenda item 1.1 operating characteristics of AMT systems     WP 5B     2012-11-09
[ 107 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 WRC-15 Agenda item 1.1 (copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)     WP 5B     2012-11-09
[ 106 ]  
 
List of documents issued (Documents 5C/47 - 5C/106)     BR Study Groups Department     2012-11-02
[ 105 ]  
 
Liaison statement to Working Party 5A with copy to Working Parties 5C, 5D and 1B on further studies on cognitive radio systems (CRS)     WP 6A     2012-11-02
[ 104 ]  
 
Liaison statement to Working Party 3K (copy to JTG 4-5-6-7, Working Parties 5A, 5C and 5D for information) on the correlation of short-term interfering signals     WP 6A     2012-11-02
[ 103 ]  
 
Proposed working document towards a preliminary draft new Report ITU-R F.[FS/RADAR COEXISTENCE IN 71-86 GHZ] and proposed draft liaison statement to Working Party 5A and Working Party 5B - Coexistence between fixed service operating in 71-76 GHz and 81-86 GHz and vehicular collision avoidance radar operating in the bands 76-77 GHz and 77-81 GHz     Canada     2012-10-29
[ 102 ]  
 
Proposed liaison statement to Working Parties 4A and 4C - Fixed service characteristics, protection criteria for WRC-15 Agenda item 1.9.1, 1.9.2 and 1.10     France , Germany (Federal Republic of) , Ireland , Luxembourg , Netherlands (Kingdom of the) , Norway     2012-10-29
[ 101 ]  
 
Draft revisions of Recommendations ITU-R F.1247-2, ITU-R F.1249-2 and ITU-R F.1509-1     Japan     2012-10-29
[ 100 ]  
 
Working document towards a preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends     Japan     2012-10-29
[ 99 ]  
 
Applicability of the sectoral antenna reference patterns in Recommendation ITU-R F.1336-3 to the frequency range below 1 GHz     Japan   242-1/5   2012-10-29
[ 98 ]  
 
Proposals for draft revision of Recommendations ITU-R F.383-8, ITU-R F.635-6 and ITU-R F.1099-4 and consequential updating of Recommendation ITU-R F.746-10     Japan   247-1/5   2012-10-29
[ 97 ]  
 
Review of certain SF-series Recommendations     Japan     2012-10-29
[ 96 ]  
 
Proposed revision of Recommendation ITU-R F.557-4 and editorial updates of certain F-Series Recommendations     Japan     2012-10-29
[ 95 ]  
 
Working document towards a preliminary draft new Report ITU-R SA.[EESS-FS-7GHz] - Sharing between the EESS (Earth to-space) and the fixed service in the 7-8 GHz range     France , European Space Agency     2012-10-28
[ 94 ]  
 
Working document towards a preliminary draft new Report ITU-R F.[FS USE-TRENDS] - Fixed service use and future trends     Canada     2012-10-18
[ 93 ]  
 
Preliminary draft new Report ITU-R F.[HF-NETWORK RELIABILITY] - Reliability calculations for adaptive HF fixed service network     Canada     2012-10-18
[ 92 ]  
 
Preliminary draft revision of Recommendation ITU-R F.339-7 - Bandwidths, signal-to-noise ratios and fading allowances in HF fixed and land mobile radiocommunication systems     Canada     2012-10-18
[ 91 ]  
 
Liaison statement to ITU-D Study Group 2, ITU-T Study Group 13 Question 15/13 and ITU-R Working Parties 4B and 5C - Appointment of Sub-Working Group Handbook Chairman and work progress     WP 5D     2012-10-16
[ 90 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 - Initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     WP 5D     2012-10-16
[ 89 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1     WP 5D     2012-10-16
[ 88 ]  
 
Liaison statement to Working Parties 5A and 5C - Applicability of the sectoral antenna pattern approximations in Recommendation ITU-R F.1336-3 to the frequency range below 1 GHz     WP 5D     2012-10-16
Resultats:437 documents
Résultats :  Précédent -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2015-10-06