Union Internationale des Télécommunications   UIT
English  Español
 
Plan du site Contactez-nous Copie Imprimable
  Page d'accueil : UIT-R : WP4B : Contributions  Ajoutés récemment -  Recherche de documents de réunion
   
UIT-R WP4B  C 

UIT-R WP4B

Systèmes, qualité de fonctionnement, disponibilité et maintenance

Resultats:135 documents
Résultats :  Précédent -  1 - 2 - 3  - Suivant Next
Contributions  Documents / Contributions
 
Numéro 
Titre Source AI/Question
Date
[ 85 ]  
(Rev.1) 
Performance and availability objectives for an FSS network operating in the 20/30 GHz band     USA     2001-10-01
[ 84 ]  
(Rev.1) 
Fade duration statistics     Ch. WP 4B     2001-10-01
[ 83 ]  
(Rev.1) 
Draft modification of Recommendation ITU-R S.1522 - Impact of loss of synchronization and timing recovery on availability in hypothetical reference digital paths     India     2001-10-01
[ 82 ]  
(Rev.1) 
Activities within Q.13/SG 13 - Hypothetical reference model of satellite IP network interconnected to terrestrial IP network     Japan     2001-10-01
[ 81 ]  
(Rev.1) 
Report of the ITU-T SG 13 meeting in Geneva, 22 January to 1 February 2002     EUTELSAT     2001-10-01
[ 80 ]  
(Rev.1) 
Time and date signals     EUTELSAT     2001-10-01
[ 79 ]  
(Rev.1) 
Liaison statement - Draft new Question Q.[ets/16] on Emergency Telecommunications Service (ETS)     ITU-T SG 16     2001-10-01
[ 78 ]  
(Rev.1) 
Timestamps in satellite transport systems     EUTELSAT     2001-10-01
[ 77 ]  
(Rev.1) 
Liaison statement from ITU-T SG 13 on draft Recommendation Y.1541     ITU-T SG 13     2001-10-01
[ 76 ]  
(Rev.1) 
Liaison statement - Liaison statement on Interim Q. 13/13 Rapporteur Meeting - "Interoperability of Satellite and Terrestrial Networks     ITU-T SG 13     2001-10-01
[ 75 ]  
(Rev.1) 
Preparation for the development of a new Recommendation to complement G.optperf     EUTELSAT     2001-10-01
[ 74 ]  
(Rev.1) 
Liaison statement from WP 8D - Basic reference models and performance parameters of IP packet network transmission in the mobile-satellite service     WP 8D     2001-10-01
[ 73 ]  
(Rev.1) 
Liaison statement to WPs 3J, 4A, 4B, 6E, 6S, 7B, 7D, 8A, 8B and 9D - Compatibility between Ultra Wideband (UWB) emissions and Radiocommunication Services     WP 1A & 1B     2001-10-01
[ 72 ]  
(Rev.1) 
Liaison statement to SG 8, WP 4B, JRG 8A-9B and WP 9B     ITU-T SG 15 WP 5/15     2001-10-01
[ 71 ]  
(Rev.1) 
Liaison statement to ITU-R WP 4B - Reply to LS on G.IPCME     ITU-T SG 15     2001-10-01
[ 70 ]  
(Rev.1) 
Part 1 - Report of the fourteenth meeting of Working Party 4B (Geneva, 1-8 October 2001)     Ch. WP 4B     2001-10-01
[ 69 ]  
(Rev.1) 
Liaison statement to ITU-R WP 9A, 4B, JRG 8A-9B, ITU-T SG 17 and SG 12 - Revisions for draft new Recommendation Y.1541 - Network performance objectives for IP-based services     ITU-T SG 13     2001-10-01
[ 68 ]  
(Rev.1) 
List of documents issued     BRSGD     2001-10-01
[ 67 ]  
(Rev.1) 
Working document towards a draft new Recommendation - Influence of BER over QoS for TCP and UDP traffic over satellite networks with differentiated services     USA     2001-10-01
[ 66 ]  
(Rev.1) 
Quality of Service - Support in the Internet - Elaboration of the concept and the influence of the operation of TCP on the end-to-end performance     EUTELSAT     2001-10-01
[ 65 ]  
(Rev.1) 
Report of the 1st meeting of the ICG on satellite matters (Ankara, Turkey, 26-28 June 2001)     Ch. ICG-SAT     2001-10-01
[ 64 ]  
(Rev.1) 
A performance comparison of Ku band versus frequencies above 17 GHz in the fixed satellite service for the use of telemetry, tracking and command (TT&C) above 17 GHz     Canada     2001-10-01
[ 63 ]  
(Rev.1) 
Report on ITU-T SG 15 activities     EUTELSAT     2001-10-01
[ 62 ]  
(Rev.1) 
Discussion on Satellite IP network system and relation between physical layer and IP parameters (Question ITU-R 263/4)     Japan     2001-10-01
[ 61 ]  
(Rev.1) 
Working Document towards a draft new Recommendation on TCP/IP performance over satellite links - A possible method to enhance TCP/IP performance over satellite links     Japan     2001-10-01
[ 60 ]  
(Rev.1) 
Report on the activities of ITU-T Study Group 13     EUTELSAT     2001-10-01
[ 59 ]  
(Rev.1) 
Responses to Circular letter CA/99     BR Secretariat     2001-10-01
[ 58 ]  
(Rev.1) 
Background briefing on secure timestamps     EUTELSAT     2001-10-01
[ 57 ]  
(Rev.1) 
Progress on the revision of Recommendation ITU-R S.579 on availability     EUTELSAT     2001-10-01
[ 56 ]  
(Rev.1) 
Comments in responses to Circular Letter CAR/109     BR Secretariat     2001-10-01
[ 55 ]  
(Rev.1) 
Updating of certain maintained S-series and SNG-series Recommendations     BR Secretariat     2001-10-01
[ 54 ]  
(Rev.1) 
Liaison statement - Reply to concerns relating to the E-model     ITU-T SG 12 (Rapporteur Q.8/12)     2001-10-01
[ 53 ]  
(Rev.1) 
Response to ITU-R WP 9A on their liaison supporting development of new ITU-T Recommendation G.821.1     ITU-T SG 13     2001-10-01
[ 52 ]  
(Rev.1) 
IP packet transfer delay in ITU-T Recommendation Y.1541     ITU-T SG 13     2001-10-01
[ 51 ]  
(Rev.1) 
Draft revised Recomendation I.358 - Call processing performance for switched virtual channel connections (VCCs) in a B-ISDN     ITU-T SG 13     2001-10-01
[ 50 ]  
(Rev.1) 
Response to ITU-R WP 9A on their liaison on the relation between physical layer, IP and ATM parameters     ITU-T SG 13     2001-10-01
[ 49 ]  
(Rev.1) 
Rapport du Président sur la réunion du Groupe de travail 4SNG     Ch. WP 4SNG     2001-10-01
[ 48 ]  
(Rev.1) 
Liaison statement to ITU-R Working Parties 4A and 4B - Duration of fades and mean time between fades on satellite paths     Wp 3J & 3M     2001-10-01
[ 47 ]  
(Rev.1) 
Liaison statement to Workin Party 4B - Activities within Q.13/SG 13     ITU-T SG 13     2001-10-01
[ 46 ]  
(Rev.1) 
Liaison statement to ITU-R Working Party 4B - Interoperability of satellite and terrestrial networks     WP 8D     2001-10-01
[ 45 ]  
(Rev.1) 
Report of the thirteenth meeting of Working Party 4B (Seattle, Washington, USA, 18-24 April 2001)     Ch. WP 4B     2001-10-01
[ 44 ]  
(Rev.1) 
Liaison statement to ITU-T Study Group 13 - Discussion on relation between physical layer, IP, ATM parameters     WP 9A     2001-10-01
[ 43 ]  
(Rev.1) 
List of documents issued     BRSGD     2001-10-01
[ 42 ]  
(Rev.1) 
Working document towards a draft new Recommendation onTCP performance over ATM based satellite network     Korea     2001-10-01
[ 41 ]  
(Rev.1) 
Working document towards a draft new Recommendation on TT&C performance characteristics     USA     2001-10-01
[ 40 ]  
(Rev.1) 
An analysis of the impact of implementing dynamic channel assignment (DCA) in FSS systems in response to a liaison statement from Working Party 4-9S     USA     2001-10-01
[ 39 ]  
(Rev.1) 
Report on ITU-T SG 15 activities     EUTELSAT     2001-10-01
[ 38 ]  
(Rev.1) 
Working document towards a preliminary draft new recommendation - Impact of FSS performance objectives and delay on the transmission of TCP/IP over satellites     INTELSAT     2001-10-01
[ 37 ]  
(Rev.1) 
Working document towards a preliminary draft new Recommendation - Spectrum requirements below 17 GHz for telemetry, tracking and command of FSS satellites operating with service links above 17GHz     INTELSAT     2001-10-01
[ 36 ]  
(Rev.1) 
Report of last ITU-T SG 13 meeting in November 2000     EUTELSAT     2001-10-01
Resultats:135 documents
Résultats :  Précédent -  1 - 2 - 3  - Suivant Next
 
Téléchargement de multiples documents: Cocher les cases correspondant aux documents sélectionnés, puis appuyer sur "Télécharger"
   
 
Préférences utilisateur: 
Téléchargement de multiples documents: Formats et langues à prendre en compte (si disponibles):
Pages de navigation HTML  
Formats  + Autres formats
Langues (maximum 2)  + Multilingue 
(E: Anglais - F: Français - S: Espagnol - A: Arabe - C: Chinois - R: Russe)

Début de page -  Commentaires -  Contactez-nous -  Droits d'auteur © UIT 2008 Tous droits réservés
Contact pour cette page :  Coordinateur du Web UIT-R
Mis à jour le : 2020-12-18