Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG 15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG 15  C 

UIT-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Periodo de estudios 2013

Resultados :213 documentos
Resultados :  1 - 2 - 3 - 4 - 5  - Siguiente Next
Contribuciones  [ AI/Cuestión: Q6/15 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 2188 ]  
 
100G interoperability measurements up to 1600 km as in input to G.698.2     Deutsche Telekom AG   Q6/15   2016-09-06
[ 2156 ]  
+Corr.1 
Proposal to modify procedural agreement between Q11 and Q6 regarding strong HD-FEC     Deutsche Telekom AG , Acacia , Alcatel-Lucent USA , China Unicom , Cisco , Comcast , Coriant , Fujitsu , Inphi , Juniper , LM Ericsson , NTT , Orange , Telecom Italia , Telefon AB , Telefonica   Q6/15, Q11/15   2016-09-06
[ 2148 ]  
(Rev.1-2) 
Staircase FEC as a candidate for Standard OTU4 MV IaDI Metro application     Deutsche Telekom AG , Acacia , China Unicom , Cisco , Comcast , Coriant , Fujitsu , Inphi , Juniper , LM Ericsson , NTT , Orange , Telecom Italia , Telefon AB , Telefonica   Q6/15, Q11/15   2016-09-06
[ 2144 ]  
 
Test of EVM scripts for draft revised G.698.2     Huawei Technologies Co., Ltd.   Q6/15   2016-09-06
[ 2143 ]  
 
Considerations on optical transceiver module for G.metro     China Unicom , Huawei Technologies Co., Ltd.   Q6/15   2016-09-06
[ 2126 ]  
 
Proposal to enhance the description of the NOSM in G.872     ZTE Corporation   Q6/15, Q12/15   2016-09-06
[ 2052 ]  
 
Requirement of clarify optical layer parameter for some new use cases     China Unicom   Q9/15, Q6/15   2016-09-05
[ 2047 ]  
 
Wavelength plan consideration of G.metro     China Unicom , ZTE Corporation   Q6/15   2016-09-05
[ 2045 ]  
 
Proposal to study OSNR related issues of beyond 100G physical interface     China Unicom , ZTE Corporation   Q6/15   2016-09-05
[ 2044 ]  
 
Proposal of communication channel from TEE to HEE in G.metro     China Unicom   Q6/15   2016-09-05
[ 2043 ]  
 
EVM related test results     China Unicom   Q6/15   2016-09-05
[ 2041 ]  
 
Request for information about the SG15/Q6 working process and time schedule to address the application codes and use cases of operators, as well as their interoperability needs at 100G.     China Telecommunications Corporation , Orange   Q6/15   2016-09-05
[ 2016 ]  
 
Proposal of reference point specification clarification for optical line interfaces of G.692     FiberHome Technologies Group   Q6/15, Q12/15   2016-09-05
[ 2000 ]  
 
Wavelength Plan Proposal for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , Telefon AB - LM Ericsson   Q6/15   2016-09-05
[ 1983 ]  
 
EVM test of commercial transponders and impairment simulation setup     Ministry of Industry and Information Technology (MIIT)   Q6/15   2016-09-05
[ 1979 ]  
 
Band Gap and Wavelength Plan Proposal for G.metro     Finisar Corporation   Q6/15   2016-09-04
[ 1945 ]  
 
Proposed modification to Clause 8 of G.872     ZTE Corporation   Q6/15, Q12/15   2016-09-02
[ 1943 ]  
 
Parameters for pilot tones and message channel for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , China Unicom , Telefon AB - LM Ericsson   Q6/15   2016-09-02
[ 1942 ]  
 
Appendix on Principles of Operation for G.metro     ADVA Optical Networking , British Telecommunications Public Ltd. Co. (BT Plc) , China Unicom , Telefon AB - LM Ericsson   Q6/15   2016-09-02
[ 1933 ]  
 
considerations about the wavelength plan of G.metro     ZTE Corporation   Q6/15   2016-09-02
[ 1932 ]  
 
Considerations on the EVM in the G.698.2     ZTE Corporation , CAICT , Ministry of Industry and Information Technology (MIIT)   Q6/15   2016-09-02
[ 1921 ]  
 
Physical Layer Implementation Guidance for "Open Line Systems"     Xtera Communications, Inc.   Q6/15   2016-09-01
[ 1919 ]  
 
Impact of pilot tone and message channel on the payload in G.metro     ADVA Optical Networking   Q6/15   2016-09-01
[ 1869 ]  
 
Proposed application parameters for G.698.3  
This Contribution was originally posted as TD252/WP2
 
Korea Advanced Institute of Science and Technology (KAIST)   Q6/15   2016-02-18
[ 1868 ]  
 
A 10 Gb/s signal transmission with a F-P LD based seed light source     Korea Advanced Institute of Science and Technology (KAIST)   Q6/15   2016-02-03
[ 1844 ]  
 
EVM-related 100G measurements and analysis for Black Link applications     Deutsche Telekom AG   Q6/15   2016-02-02
[ 1839 ]  
 
Injection seeded DWDM system for 2.5 Gb/s transmission     Korea Advanced Institute of Science and Technology (KAIST)   Q6/15   2016-02-02
[ 1811 ]  
 
Proposal for G.654.E fibre     OFS Fitel, LLC   Q6/15, Q5/15   2016-02-02
[ 1776 ]  
 
Proposal for revising Appendix I of ITU-T Recommendation G.652 revision     Corning Incorporated , OFS Fitel, LLC   Q6/15, Q5/15   2016-02-02
[ 1769 ]  
 
Considerations about G.metro system capacity for mobile front-hauling.     Telecom Italia S.p.A.   Q6/15   2016-02-02
[ 1768 ]  
 
Architecture discussion of G.metro     China Unicom   Q6/15   2016-02-02
[ 1720 ]  
 
Example of a Link Design Value (LDV) for Chromatic Dispersion     Corning Incorporated , OFS Fitel, LLC   Q6/15, Q5/15   2016-02-01
[ 1714 ]  
 
Proposal of the description of cross-polarisation modulation     China Unicom , Huawei Technologies Co., Ltd.   Q7/15, Q6/15   2016-02-01
[ 1713 ]  
 
Preliminary measurements related to pilot tone for G.metro     Huawei Technologies Co., Ltd.   Q6/15   2016-02-01
[ 1712 ]  
 
EVM measurements for draft revised G.698.2     Huawei Technologies Co., Ltd.   Q6/15   2016-02-01
[ 1703 ]  
(Rev.1) 
Further analysis of measurements on EVM and OSNR     China Unicom , Coriant GmbH & Co. KG , Keysight Technologies Deutschland GmbH   Q6/15   2016-02-01
[ 1700 ]  
 
Proposal of new application code 4L1-9D1F and additional measurement data in G.959.1 (Updated)     Fujitsu Limited   Q6/15   2016-02-01
[ 1659 ]  
 
Statistical approach for chromatic link dispersion using G.652.D fibres     Prysmian SpA   Q6/15, Q5/15   2016-02-01
[ 1617 ]  
 
Revised proposal of multi-dimensional modulation format in G.Sup.39     China Unicom , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q6/15   2016-02-01
[ 1616 ]  
 
Revised Proposals about the Super-Nyquist DWDM in G.sup39     China Unicom , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q6/15   2016-02-01
[ 1613 ]  
 
Proposals about the scope of the G.metro     China Unicom , ZTE Corporation   Q6/15   2016-02-01
[ 1610 ]  
 
EVM related results and proposal of G.698.2     China Unicom , ZTE Corporation   Q6/15   2016-02-01
[ 1608 ]  
 
Application code proposal in G.metro     ADVA Optical Networking , China Unicom , Ericsson Canada, Inc. , Finisar Corporation , Huawei Technologies Co., Ltd. , ZTE Corporation   Q6/15   2016-02-01
[ 1607 ]  
 
Consideration of information between HEE and TEE in G.metro     China Unicom   Q6/15, Q14/15   2016-02-01
[ 1606 ]  
 
Proposal of parameters for G.654.E fibre category     Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT)   Q6/15, Q5/15   2016-02-01
[ 1605 ]  
 
Short reach application codes and AWG requirement in G.metro     China Unicom , Ericsson Canada, Inc. , Finisar Corporation , ZTE Corporation   Q7/15, Q6/15   2016-02-01
[ 1604 ]  
 
Field trials and proposal of G.654 for terrestrial application     China Unicom , FiberHome Technologies Group , Ministry of Industry and Information Technology (MIIT) , OFS Fitel, LLC   Q6/15, Q5/15   2016-02-01
[ 1600 ]  
(Rev.1) 
The suggestion about multichannel parallel interfaces in B100G  
C-1600 Rev.1 adds Q6/15 as a destination Question. There is no change to the content of the Contribution.
 
FiberHome Technologies Group   Q6/15, Q11/15   2016-02-01
[ 1595 ]  
 
Test results and discussion of the EVM metrics     CAICT, P.R.China , ZTE Corporation   Q6/15   2016-02-01
[ 1593 ]  
 
100G system in-service OSNR monitoring and embedded OTDR test     AICT, P.R.China , China Mobile Communications Corporation , ZTE Corporation   Q6/15   2016-02-01
Resultados :213 documentos
Resultados :  1 - 2 - 3 - 4 - 5  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-4-25