Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Reunión 2012-09-10 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C (2012-09-10) 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Reunión  del 2012-09-10 al 2012-09-21

Lugar : Suiza [Ginebra]

Otras reuniones : 2012-05-11  2011-12-05  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Resultados :452 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 2240 ]  
 
Analysis of Protection Scenario 1 for Phase/Time Synchronization, for the Case of a Shorter SyncE Reference Chain     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2239 ]  
 
Further Discussion of BMCA Requirements for the Phase/Time PTP Telecom Profile, and Example Alternate BMCAs     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2238 ]  
 
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths, with SyncE Transients Slowed Down by T-BCs and T-TSC, and Conclusions on Mitigation of Effect of the Rearrangement     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2237 ]  
 
Analysis of HRM2b SyncE Rearrangement with SyncE Transients Slowed Down by T-BCs     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd.   Q13/15   2012-08-28
[ 2236 ]  
 
G.fast: Performance of channel estimation methods     Lantiq Beteiligungs-GmbH & Co. KG   Q4A/15   2012-08-28
[ 2235 ]  
 
Analysis of HRM2b SyncE Rearrangement for Various T-TSC Bandwidths     China Mobile Communications Corporation , France Télécom Orange , Huawei Technologies Co. Ltd. , Iometrix   Q13/15   2012-08-28
[ 2234 ]  
 
Clarification on Ethernet transport network architecture in G.8010     Hitachi, Ltd.   Q12/15   2012-08-28
[ 2233 ]  
 
Comments on the latest draft G.8011.4     Hitachi, Ltd.   Q10/15   2012-08-28
[ 2232 ]  
 
Consideration of G.mecp protection architecture     Hitachi, Ltd.   Q9/15   2012-08-28
[ 2231 ]  
 
Proposal on the structure of G.8060 (G.ptneq)     Hitachi, Ltd.   Q9/15   2012-08-28
[ 2230 ]  
 
Proposal for equipment type definition in G.8060 (G.ptneq)     Hitachi, Ltd.   Q9/15   2012-08-28
[ 2229 ]  
 
Proposal for update of G.8101     Hitachi, Ltd.   Q3/15   2012-08-28
[ 2228 ]  
 
Comment on the structure of G.8101     Hitachi, Ltd.   Q3/15   2012-08-28
[ 2227 ]  
 
General discussion on wavelength tuning for G.multi     ZTE Corporation   Q2/15   2012-08-28
[ 2226 ]  
 
General discussion on registration for G.multi     ZTE Corporation   Q2/15   2012-08-28
[ 2225 ]  
 
Proposed text for ODU SMP Protocol     China Unicom , ZTE Corporation   Q9/15   2012-08-28
[ 2224 ]  
 
Proposed text of Commands for G.odusmp     China Unicom , FiberHome Technologies Group , ZTE Corporation   Q9/15   2012-08-28
[ 2223 ]  
 
Proposal for NG-PON2 TC layer standardization     ZTE Corporation   Q2/15   2012-08-28
[ 2222 ]  
 
Editorial proposal for G.smp     China Unicom , FiberHome Technologies Group , ZTE Corporation   Q9/15   2012-08-28
[ 2221 ]  
 
TC layer framing in TWDM PON     ZTE Corporation   Q2/15   2012-08-28
[ 2220 ]  
 
Example scenarios for protection interworking     China Unicom , ZTE Corporation   Q9/15   2012-08-28
[ 2219 ]  
 
Proposal of bi-directional failure in G.873.1     FiberHome Technologies Group , ZTE Corporation   Q9/15   2012-08-28
[ 2218 ]  
 
Unified Power Management for PON systems     ZTE Corporation   Q2/15   2012-08-28
[ 2217 ]  
 
Proposal for FEC overhead of OTU5     ZTE Corporation; China   Q6/15, Q11/15   2012-08-28
[ 2216 ]  
 
Proposal to add OTU0 frame in G.709/Y.1331     Altera Corporation , Electronics and Telecommunications Research Institute (ETRI) , LG-Ericsson , SK Telecom   Q11/15   2012-08-28
[ 2215 ]  
 
OTN Architecture Extensions     Infinera Corporation   Q6/15, Q12/15, Q11/15   2012-08-28
[ 2214 ]  
 
Comparison of ODU SMP Activation protocols     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2012-08-28
[ 2213 ]  
 
G.ODUSMP Protocol Proposal     Infinera Corporation   Q9/15   2012-08-28
[ 2212 ]  
 
Transparent Clocks and Issues Around Perceived Layer Violations [G.8275.1]     Aviat Networks , Calnex Solutions Limited , Juniper Networks , Sprint , Vitesse Semiconductor Corporation   Q13/15   2012-08-28
[ 2211 ]  
 
G.fast: On the channel estimation method     Lantiq Beteiligungs-GmbH & Co. KG   Q4A/15   2012-08-28
[ 2210 ]  
 
The effect of noise on channel estimation accuracy for multiple simultaneous estimations     Sckipio Technologies S.I. Ltd.   Q4A/15   2012-08-27
[ 2209 ]  
 
Fast channel estimation scheme - overview     Sckipio Technologies S.I. Ltd.   Q4A/15   2012-08-27
[ 2208 ]  
 
FEC blocks mapping to TDD-Frames     Sckipio Technologies S.I. Ltd.   Q4A/15   2012-08-27
[ 2207 ]  
 
The need for additional pilots for the first symbol in a TDD-Frame     Sckipio Technologies S.I. Ltd.   Q4A/15   2012-08-27
[ 2206 ]  
 
Proposal for determined Amendment 1 of G.9955 Annex A : LFSR usage for pilot tones     Yitran Communications Ltd.   Q4C/15   2012-08-27
[ 2205 ]  
 
G.fast: Proposal to define pilot tones in G.fast     Lantiq Beteiligungs-GmbH & Co. KG   Q4A/15   2012-08-27
[ 2204 ]  
 
G.fast: On the number of latency paths in G.fast     Lantiq Beteiligungs-GmbH & Co. KG   Q4A/15   2012-08-27
[ 2203 ]  
 
G.vector: Comments on 2012-06-4A-048 and upstream FDPS definition     Lantiq Beteiligungs-GmbH & Co. KG   Q4A/15   2012-08-27
[ 2202 ]  
 
G.vector: Proposal on FDPS format     Lantiq Beteiligungs-GmbH & Co. KG   Q4A/15   2012-08-27
[ 2201 ]  
 
G.vector: Proposal to allow pilot sequence length modification     Lantiq Beteiligungs-GmbH & Co. KG   Q4A/15   2012-08-27
[ 2200 ]  
 
G.vector: Proposed FDPS-related text corrections for G.993.5     Lantiq Beteiligungs-GmbH & Co. KG   Q4A/15   2012-08-27
[ 2199 ]  
 
G.ploam: Proposal for a corrigendum to G.997.1 Recommendation     Lantiq Beteiligungs-GmbH & Co. KG   Q4A/15   2012-08-27
[ 2198 ]  
 
G.vector: Proposed text change for G.993.5 Recommendation     Lantiq Beteiligungs-GmbH & Co. KG   Q4A/15   2012-08-27
[ 2197 ]  
 
G.fast: Power Optimized G.fast Transmission     ADTRAN   Q4A/15   2012-08-27
[ 2196 ]  
 
Proposal for adaptive bandwidth in Ethernet ring     Huawei Technologies Co. Ltd.   Q9/15   2012-08-27
[ 2195 ]  
 
Variable temperature test regime     Rakon Limited   Q13/15   2012-08-27
[ 2194 ]  
 
G.8263 Clarification     Rakon Limited   Q13/15   2012-08-27
[ 2193 ]  
 
Clarification on adaptive bandwidth for G.808.1     Huawei Technologies Co. Ltd.   Q9/15   2012-08-27
[ 2192 ]  
 
Proposal on protection switching interworking architecture for ring-to-ring and linear-to-ring schemes     China Unicom , Huawei Technologies Co. Ltd.   Q9/15   2012-08-27
[ 2191 ]  
 
Proposal for new Appendix II to G.798.1     Huawei Technologies Co. Ltd.   Q9/15   2012-08-27
Resultados :452 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-4-16