Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG05 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG05  C 

UIT-T SG05

ICT and climate change

Periodo de estudios 2009

Resultados :520 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 370 ]  
 
Summary of comments and discussion issues for ORG     Telefon AB - LM Ericsson   Q18/5   2011-09-09
[ 369 ]  
 
Proposal of new text in chapter 8.5 in ORG     France Telecom Orange   Q18/5   2011-09-09
[ 368 ]  
 
Proposal of revised text in Part II.1 of GNS     France Telecom Orange   Q18/5   2011-09-09
[ 367 ]  
 
Contribution to Draft Recommendation ITU-T L.methodology_ICT goods, networks     European Union   Q18/5   2011-09-09
[ 366 ]  
 
Draft Recommendation ITU-T L.methodology_ICT goods, networks and services     European Union   Q18/5   2011-09-09
[ 365 ]  
 
Proposal for adding third-order effects evaluation to Clause 7 of ITU-T L.ORG     ETRI   Q18/5   2011-09-09
[ 364 ]  
 
Proposal for clarification of terminologies of ITU-T L.metrics     ETRI   Q17/5   2011-09-09
[ 363 ]  
 
Editorial improvements for draft Recommendation ITU-T L.methodology_ICT_projects, "Methodology for environmental impacts assessment of ICT projects"     ETRI   Q18/5   2011-09-09
[ 362 ]  
 
Suggested additions to Appendix Z of the GNS document     GSM Association   Q18/5   2011-09-09
[ 361 ]  
 
Suggested appendices to ORG document     GSM Association   Q18/5   2011-09-09
[ 360 ]  
 
Proposals on the practical management of exposure to RF electromagnetic fields     GSM Association , Vodafone   Q3/5   2011-09-09
[ 359 ]  
 
Texts moved in ORG to increase consistency     Alcatel Lucent   Q18/5   2011-09-09
[ 358 ]  
 
Reporting Requirements for scopes 1 and 2 in ORG     Alacatel Lucent , France Telecom Orange   Q18/5   2011-09-09
[ 357 ]  
 
Proposed new work item: Tool to assess environmental & sustainability features of mobile phones     Telefónica SA , RIM , Verizon   Q18/5   2011-09-09
[ 356 ]  
 
Proposed modification to the text of Q22/5     Japan   Q22/5   2011-09-09
[ 355 ]  
 
Proposal of ground method for HVDC for recommendation of L.spec DC     Japan   Q6/5, Q4/5, Q19/5, Q11/5   2011-09-09
[ 354 ]  
 
Proposal on the detailed explanation about the checklist item for work processes and the editorial policy of the draft Recommendation for GNS     Japan   Q18/5   2011-09-09
[ 353 ]  
 
Proposed metrics for OLT equipment     Japan   Q17/5   2011-09-09
[ 352 ]  
 
Proposed minimum data set for evaluating power efficiency and for controlling data center equipment for power saving in data centers     Japan   Q17/5   2011-09-09
[ 351 ]  
 
Proposal for way of selecting cooling systems which takes into consideration outdoor air condition and power density of data centers     Japan   Q17/5   2011-09-09
[ 350 ]  
 
Proposal for clarification and focus of K Guide     Telefon AB - LM Ericsson   Q3/5   2011-09-09
[ 349 ]  
 
Proposal on Uncertainty calculation for K.guide     China Mobile Comms Corp   Q3/5   2011-09-09
[ 348 ]  
 
Watt guard - Proposal for a new sub clause in Recommendation K.guide     Germany   Q3/5   2011-09-09
[ 347 ]  
 
Proposed Metric for network domain     Korea (Rep. of)   Q17/5   2011-09-09
[ 346 ]  
 
Proposal on considerations for measuring power consumption in L.measure     Korea (Rep. of)   Q17/5   2011-09-09
[ 345 ]  
 
Comparison of terms introduced in IEC 62368-1 standard     Korea (Rep. of)   Q11/5   2011-09-09
[ 344 ]  
 
Proposal of study items for architecture of DC power feeding systems     Korea (Rep. of)   Q19/5   2011-09-09
[ 343 ]  
 
Proposal for Clause 11 of L.methodology_ICT_projects, "ICT project quantifying"     Korea (Rep. of)   Q18/5   2011-09-09
[ 342 ]  
 
A Method to provide recycling information of rare metals in ICT products     Korea (Rep. of)   Q21/5   2011-09-09
[ 341 ]  
 
Necessity of considering a phase difference between induced voltages by several inducing plants for their superposition     Korea (Rep. of)   Q9/5   2011-09-09
[ 340 ]  
 
Proposal for text deletions, modifications and additions to improve ITU-T L.GNS     Korea (Rep. of)   Q18/5   2011-09-09
[ 339 ]  
 
Proposal for development of an ITU-T Handbook on an assessment framework for energy/greenhouse gas and environmental impacts of ICT products, organizations, projects, and utilization activities     Korea (Rep. of )   Q18/5   2011-09-09
[ 338 ]  
 
Energy Efficiency Metrics for Base Stations     Korea (Rep. of)   Q17/5   2011-09-09
[ 337 ]  
 
Requirement of EMC and Safety study for L.adapterPhase2 draft     Korea (Rep. of)   Q21/5   2011-09-09
[ 336 ]  
 
Organizational Activities to Reduce GHG Emissions and Energy Consumption or increase GHG Removals     Korea (Rep. of)   Q18/5   2011-09-09
[ 335 ]  
 
Proposal for preparing a new recommendation: Human exposure measurement method when a base station is put into service     Korea (Rep. of)   Q3/5   2011-09-09
[ 334 ]  
 
Considerations of universal battery solution     China   Q21/5   2011-09-09
[ 333 ]  
 
Survey and Proposal on L.adapter Phase2 draft     China   Q21/5   2011-09-09
[ 332 ]  
 
Contribution for the drafting of K.henv     CATR of MIIT   Q8/5   2011-09-09
[ 331 ]  
 
Radiation Immunity Test Method for Telecommunication Equipment when Radio Frequencies are Emitted from Wireless Communication Terminals     NTT   Q12/5   2011-09-09
[ 330 ]  
 
Transmission Characteristics of Conducted Disturbances from an AC Power Supply Port to Ethernet Ports of IP-based Communication Devices     NTT   Q8/5   2011-09-09
[ 329 ]  
 
Proposed method for processing Ethernet port and USB port in overvoltage test     NTT   Q4/5   2011-09-09
[ 328 ]  
 
Comments on K.guide: microcell installation     NICT , NTT DoCoMo Inc.   Q3/5   2011-09-09
[ 327 ]  
 
Additional information for K.guide about the measurement time of the electromagnetic fields from mobile phone base stations     NICT   Q3/5   2011-09-09
[ 326 ]  
 
Comments on K.guide: time averaging     NICT   Q3/5   2011-09-09
[ 325 ]  
 
Characterization of Base Stations RF Exposure - Examples of Measurements     ANATEL   Q3/5   2011-09-09
[ 324 ]  
 
Proposal of DC interface requirements for recommendation of L.spec DC     NTT   Q19/5   2011-09-06
[ 323 ]  
 
Proposal of management functions of DC power feeding systems     Korea Telecom   Q19/5   2011-09-06
[ 322 ]  
 
Proposal of configuration of DC power feeding systems with system redundancy     Korea Telecom   Q19/5   2011-09-06
[ 321 ]  
 
Proposal of battery configuration and operation in DC power feeding systems     Korea Telecom   Q19/5   2011-09-06
Resultados :520 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2021-02-04