Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Reunión 2006-10-30 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C (2006-10-30) 

UIT-T SG15

Infraestructuras de las redes ópticas y de otras redes de transporte

Periodo de estudios 2005

Reunión  del 2006-10-30 al 2006-11-10

Lugar : Suiza [Ginebra]

Otras reuniones : 2008-12-01  2008-02-11  2007-06-04  2006-02-06  2005-05-16  2004-11-29 

Resultados :32 documentos
Contribuciones  [ AI/Cuestión: Q11/15 ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 283 ]  
 
10 Gbit/s Interface for Packet Transport Networks     Deutsche Telekom   Q11/15   2006-10-20
[ 282 ]  
 
Proposal for a new Recommendation Packet Transport NNIs and their applications     Deutsche Telekom   Q11/15   2006-10-20
[ 280 ]  
 
High Speed Interface for Packet Transport Networks     Deutsche Telekom   Q6/15, Q11/15   2006-10-20
[ 275 ]  
 
Serial 100 Gigabit Ethernet PHY proposal in 802.3     Lucent Technologies Germany   Q11/15, Q6/15, Q3/15   2006-10-20
[ 273 ]  
 
Proposed mechanism for T-MPLS TCM using label stacking     Alcatel   Q12/15, Q11/15, Q9/15   2006-10-20
[ 243 ]  
 
Proposal to continue work on 10GbE bit rates     Cisco Systems   Q14/15, Q12/15, Q11/15   2006-10-20
[ 242 ]  
 
Impact of T-MPLS on a carrier operations group     Cisco Systems   Q14/15, Q12/15, Q11/15, Q9/15   2006-10-20
[ 241 ]  
 
Two customer needs of 10GbE LAN PHY transport: one can be fulfilled by using existing standards and the other needs new standards     Japan   Q11/15   2006-10-20
[ 240 ]  
 
Engagement of ITU-T SG15 with IEEE 802.3 Higher Speed Study Group (802.3 HSSG) in consideration of current 802.3 HSSG efforts to define objectives for Higher Speed Ethernet     AT&T , Sprint Nextel , Verizon   Q12/15, Q11/15, Q9/15, Q6/15   2006-10-20
[ 234 ]  
(Rev.1) 
All-Japan interoperability trial of full-transparent 10GbE LAN PHY transport  
Rev1: Correction of a template issue causing the seventh contact not to appear
 
Japan   Q11/15   2006-10-20
[ 232 ]  
 
100 Gbit/s interface     Alcatel   Q11/15, Q9/15   2006-10-20
[ 231 ]  
 
Multi-layer T-MPLS network architecture and layer network signal formats     Alcatel   Q12/15, Q11/15   2006-10-20
[ 212 ]  
 
Proposal of the modifications of description on the usage of SDH overhead for automatic discovery in G.707     NTT   Q11/15   2006-10-20
[ 181 ]  
 
Proposal to specify a T-MPLS Transport Module (TTM) interface in G.8112 and G.8121     Alcatel   Q11/15, Q9/15   2006-10-19
[ 180 ]  
 
Proposal to start the development of a MPLS service specification     Alcatel   Q12/15, Q11/15   2006-10-19
[ 179 ]  
 
Ethernet SSM encoding description in Appendix VIII/G.8261     Alcatel   Q13/15, Q11/15, Q9/15   2006-10-19
[ 178 ]  
 
Initiation of > 10 Gb/s Ethernet transport discussions at ITU-T: IEEE is already discussing higher speed Ethernet     NTT   Q11/15   2006-10-19
[ 167 ]  
 
CM, CF definition in G.8011 and Traffic conditioning algorithm in G.8021     Alcatel Shanghai Bell   Q11/15   2006-10-19
[ 166 ]  
 
Support point to multi-point in Ethernet over Transport and T-MPLS     Alcatel Shangai Bell   Q11/15   2006-10-19
[ 154 ]  
 
Proposed modification to ODTU23 frame format and mapping of ODU2 in G.709     ETRI   Q11/15   2006-10-19
[ 142 ]  
 
Proposal for E-Tree service in G.8011     Huawei Technologies   Q11/15   2006-10-19
[ 140 ]  
 
Proposal for TCM in G.798     Huawei Technologies   Q11/15, Q9/15   2006-10-19
[ 139 ]  
 
Corrigendum to G.7043/Y.1343     Huawei Technologies   Q11/15   2006-10-19
[ 137 ]  
 
Proposal for TCM in G.709     Huawei Technologies   Q9/15, Q11/15   2006-10-19
[ 136 ]  
 
Proposal for sequencing TCM levels in G.798     Huawei Technologies   Q11/15, Q9/15   2006-10-19
[ 80 ]  
 
Ethernet priorities     Nortel Networks (Canada)   Q14/15, Q11/15, Q9/15, Q12/15   2006-10-18
[ 72 ]  
 
Proposed Amendment 2 to G.7043/Y.1343     PMC Sierra   Q11/15   2006-10-18
[ 71 ]  
 
Proposed Corrigendum to ITU-T Rec. G.7041 (GFP)     PMC Sierra   Q11/15   2006-10-18
[ 55 ]  
 
10GbE LAN PHY within OTN optical hierarchy     Sprint Nextel   Q14/15, Q13/15, Q12/15, Q9/15, Q6/15, Q11/15   2006-10-17
[ 54 ]  
 
Proposal for management communications methodology between systems connected by virtual concatenation of PDH signals     Ceterus Networks , Sprint Nextel   Q14/15, Q12/15, Q9/15, Q11/15   2006-10-17
[ 53 ]  
 
Questions to consider on Ultra-High Rate Services with OTN Virtual Concatenation     Ceterus Networks , Sprint Nextel   Q14/15, Q12/15, Q9/15, Q11/15   2006-10-17
[ 44 ]  
 
Proposed Supplement on Network Architecture for transport of Ethernet Services     Lucent Technologies , Sprint Nextel , AT&T , Verizon , AMCC , Alcatel   Q6/15, Q13/15, Q12/15, Q9/15, Q11/15   2006-10-17
Resultados :32 documentos
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-4-25