Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP5D : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP5D  C 

UIT-R WP5D

Sistemas IMT

Resultados :1185 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 485 ]  
 
Further updates for answers to Question on Spectrum Needs for IMT under WRC-19 agenda item 1.13     Korea (Republic of)     2017-02-07
[ 484 ]  
 
Working document towards a preliminary draft new [RECOMMENDATION OR REPORT] - ITU-R M.[MSS&IMT-ADVANCED SHARING]     Korea (Republic of)     2017-02-07
[ 483 ]  
 
Proposal of deployment-related parameters for terrestrial IMT systems in dense areas     Korea (Republic of)     2017-02-07
[ 482 ]  
 
Proposal for Report ITU-R M.[IMT-2020.EVAL]     Korea (Republic of)     2017-02-07
[ 481 ]  
 
Proposal for Report ITU-R M.[IMT-2020.TECH PERF REQ]     Korea (Republic of)     2017-02-07
[ 480 ]  
 
WRC-19 agenda item 1.13: IMT Spectrum Needs     Luxembourg     2017-02-07
[ 479 ]  
 
WRC-19 agenda item 1.13: IMT parameters for sharing studies     Luxembourg     2017-02-07
[ 478 ]  
 
Draft revision of Recommendation ITU-R M.1036     Luxembourg     2017-02-07
[ 477 ]  
 
Responses to questions on Spectrum Needs for IMT under WRC-19 agenda item 1.13     Japan     2017-02-07
[ 476 ]  
 
Proposed modifications to the summary section of the working document on spectrum needs     Japan , China (People's Republic of) , Korea (Republic of)     2017-02-07
[ 475 ]  
 
Proposal on operational characteristics of IMT-2020 systems for sharing and compatibility studies under WRC-19 agenda item 1.13     Japan     2017-02-07
[ 474 ]  
 
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (issue 9.1.2)     Japan     2017-02-07
[ 473 ]  
 
Proposed modification to the working document towards a preliminary draft revision of Recommendation ITU-R M.1036-5     Japan     2017-02-07
[ 472 ]  
 
Proposal for draft liaison statement and program for the IMT-2020 Workshop     Japan , Korea (Republic of)     2017-02-07
[ 471 ]  
 
Proposal for revision on IMT-2020/2 "IMT-2020 Process" document     Japan , China (People's Republic of)     2017-02-07
[ 470 ]  
 
Proposed modifications to working document towards a preliminary draft new Report ITU-R M. [IMT-2020.SUBMISSION]     Japan , Korea (Republic of)     2017-02-07
[ 469 ]  
 
Extension module below 6 GHz (alternative method of generating the channel parameters) for channel model in Report ITU-R M.[IMT-2020.EVAL]     Japan     2017-02-07
[ 468 ]  
 
Evaluation methodology and evaluation configuration for Report ITU-R M.[IMT-2020.EVAL]     Japan     2017-02-07
[ 467 ]  
 
Proposal on target values of technical performance requirements for Draft New Report ITU-R M.[IMT-2020.TECH PERF REQ]     Japan     2017-02-07
[ 466 ]  
 
Proposal of additional texts to working document towards a preliminary draft new Report ITU-R M.[IMT.BY.INDUSTRIES] - The use of terrestrial component of International Mobile Telecommunications (IMT) by industry sectors     Japan     2017-02-07
[ 465 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R M.[IMT.EXPERIENCES] - National experiences on the use of terrestrial International Mobile Telecommunication (IMT) Systems in UHF frequency bands around an below 1 GHz identified for IMT     Japan     2017-02-07
[ 464 ]  
 
Proposed modifications to working document towards Addendum 2 to Circular Letter 5/LCCE/59     Japan , China (People's Republic of) , Korea (Republic of)     2017-02-07
[ 463 ]  
 
Proposal for IMT-2020 channel modelling principles     Spark NZ Limited, , Beijing University of Posts and Telecommunications     2017-02-07
[ 462 ]  
 
Proposal for IMT-2020 channel model     Spark NZ Limited , Beijing University of Posts and Telecommunications     2017-02-07
[ 461 ]  
 
Proposed response to Working Party 5A - Use of Recommendation ITU-R M.1390 for estimating PPDR spectrum requirements     Telstra Corporation Ltd.     2017-02-07
[ 460 ]  
 
Report on the recent activities of Wireless World Research Forum (WWRF)     WWRF Liaison Rapporteur     2017-02-07
[ 459 ]  
 
Proposal on IMT-2020 channel model     Beijing University of Posts and Telecommunications , China Mobile Communications Corporation , DaTang Telecommunication Technology & Industry Holding Co. Ltd , Electronics and Telecommunications Research Institute (ETRI) , Huawei Technologies Co. Ltd. , NTT DOCOMO, Inc. , Samsung Electronics Co., Ltd. , SoftBank Corporation , Spark NZ Limited, , ZTE Corporation     2017-02-07
[ 458 ]  
 
Example implementation of the methodology in draft new Recommendation ITU-R M.[IMT.MODEL]     Intel Corporation , Nokia Corporation , Telefon AB - LM Ericsson     2017-02-07
[ 457 ]  
 
Response to Questionnaire     Bahrain (Kingdom of)     2017-02-06
[ 456 ]  
 
Proposed modifications to working document toward preliminary draft new Report ITU-R M.[IMT-2020.EVAL]     Canada     2017-02-06
[ 455 ]  
 
Proposed channel parameters based on results of propagation measurements for the development of channel model for IMT-2020 technology evaluation     Canada   Q229/5   2017-02-07
[ 454 ]  
 
View on parameters related to the sharing studies between BSS(S) and IMT systems in 1 452-1 492 MHz under agenda item 9.1.2     France     2017-02-06
[ 453 ]  
 
Proposals on modification of Recommendation ITU-R M.1036 with regard to the frequency arrangements     France     2017-02-06
[ 452 ]  
 
Liaison statement to Working Party 7B (copied for information to Working Party 5A) - Technical characteristics for WRC-19 agenda item 1.3     France     2017-02-06
[ 451 ]  
 
Working document towards a preliminary draft new Report ITU-R M.[IMT.EXPERIENCES]     France     2017-02-06
[ 450 ]  
 
Discussion on IMT-2020 transmitter parameters to be used in the adjacent band sharing studies     France     2017-02-06
[ 449 ]  
 
New Annex for the new Report ITU-R M.[IMT.EXPERIENCES]     Germany (Federal Republic of)     2017-02-06
[ 448 ]  
 
Coexistence between IMT in 3 300-300 MHz and radar systems in 3 100-3 300 MHz     Cameroon (Republic of) , Egypt (Arab Republic of) , Kenya (Republic of) , Rwanda (Republic of) , South Africa (Republic of) , Zimbabwe (Republic of)     2017-02-06
[ 447 ]  
 
Protection of systems in the radionavigation-satellite service     United Kingdom of Great Britain and Northern Ireland     2017-02-06
[ 446 ]  
 
Coexistence between IMT and radar systems in the 3 300-3 400 MHz     Cameroon (Republic of) , Egypt (Arab Republic of) , Kenya (Republic of) , Rwanda (Republic of) , South Africa (Republic of) , Zimbabwe (Republic of)     2017-02-06
[ 445 ]  
 
A national approach to terrestrial IMT deployment (LTE EMBMS) in the 1 800 MHz band, Iran experience     Iran (Islamic Republic of)     2017-02-06
[ 444 ]  
 
Narrowband and broadband - Machine type communication by IMT     United States of America     2017-02-06
[ 443 ]  
 
Proposed reply liaison statement from Working Party 5D to Working Party 4C and proposed updates to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING]     United States of America     2017-02-06
[ 442 ]  
 
Proposed modifications to the working document towards - Preliminary draft new Report ITU-R M.[IMT-2020.TECH PERF REQ] - Minimum requirements related to technical performance for IMT-2020 radio interface(s)     India (Republic of)     2017-02-06
[ 441 ]  
(Rev.1) 
Proposed modifications to the working document towards preliminary draft new Report ITU-R M.[IMT2020.EVAL] for the EMBB-Rural LMLC configuration     India (Republic of)     2017-02-06
[ 440 ]  
(Rev.1) 
Spectrum needs for IMT under WRC-19 agenda item 1.13     India (Republic of)     2017-02-06
[ 439 ]  
 
Usage of the 3 300-3 400 and 3 400-3 600 MHz band in Africa     Cameroon (Republic of) , Egypt (Arab Republic of) , Kenya (Republic of) , Rwanda (Republic of) , South Africa (Republic of) , Zimbabwe (Republic of)     2017-02-06
[ 438 ]  
 
Remaining issues on ground reflection modelling for IMT-2020 channel model     Samsung Electronics Co., Ltd.     2017-02-06
[ 437 ]  
 
Progression of the working document towards a preliminary draft new Report ITU-R M.[IMT.EXPERIENCES] - National experiences with terrestrial International Mobile Telecommunication (IMT) Systems in UHF frequency bands around and below 1 GHz identified for IMT     Canada   Q229/5   2017-02-03
[ 436 ]  
 
Progression of the working document towards a preliminary draft new Report ITU-R M.[IMT.BY.INDUSTRIES] - The use of the terrestrial component of International Mobile Telecommunication (IMT) by industry sectors     Canada   Q229/5   2017-02-03
Resultados :1185 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2019-03-18