Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP5D-AR : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP5D-AR  C 

UIT-R WP5D-AR

Sistemas IMT

Resultados :694 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 295 ]  
 
Contribution to the preliminary draft new Report addressing coexistence between different IMT systems in the UHF band     Nigeria (Federal Republic of)     2013-07-03
[ 294 ]  
 
Work on Agenda item 1.2     ECOWAS , Cameroon (Republic of)     2013-07-03
[ 293 ]  
 
Revision of the working document towards a preliminary draft revision of Report ITU-R M.2039-2     Telefon AB - LM Ericsson     2013-07-03
[ 292 ]  
 
Revision of the working document towards a preliminary draft new Report ITU-R M.[IMT.ANTENNA]     Telefon AB - LM Ericsson     2013-07-03
[ 291 ]  
 
Proposed parameters for IMT networks in the 5-6 GHz range to be used in sharing studies for Agenda item 1.1     Telefon AB - LM Ericsson     2013-07-03
[ 290 ]  
 
Parameters for sectoral antenna pattern approximations in Recomendation ITU-R F.1336-3     Telefon AB - LM Ericsson     2013-07-03
[ 289 ]  
 
Reducing the number of proposed channelling options for the 700 MHz frequency band in Region 1     Angola (Republic of) , Botswana (Republic of) , Democratic Republic of the Congo , Lesotho (Kingdom of) , Malawi , Mozambique (Republic of) , Namibia (Republic of) , South Africa (Republic of) , Swaziland (Kingdom of)     2013-07-03
[ 288 ]  
 
Preferred frequency arrangement for the 700 MHz band     Orange     2013-07-03
[ 287 ]  
 
Technical suitability of bands above 6 GHz for IMT under Agenda item 1.1     GSM Association     2013-07-03
[ 286 ]  
 
Proposed deployment parameters for IMT networks to be used in compatibility/sharing studies for Agenda item 1.1     GSM Association     2013-07-03
[ 285 ]  
 
Scope of the compatibility study for the coexistence between different IMT systems in the UHF band     Orange     2013-07-03
[ 284 ]  
 
LTE & LTE-A system parameters for sharing study     Orange     2013-07-03
[ 283 ]  
 
The use of frequencies inbands in ranges above 10 GHz for future mobile broadband communications systems - Study on IMT vision for 2020 and beyond     Nokia Siemens Networks Oy , Nokia Corporation     2013-07-03
[ 282 ]  
 
Proposal to extend the terrestrial channelling arrangements for IMT in the 2.1 GHs band     Egypt (Arab Republic of)     2013-07-03
[ 281 ]  
 
Proposals on the channelling arrangements of the 700 MHz band in Region 1, under Agenda item 1.2 of WRC-15     United Arab Emirates     2013-07-03
[ 280 ]  
 
Proposals for answers to questions regarding IMT spectrum requirement and frequency arrangement     United Arab Emirates     2013-07-03
[ 279 ]  
 
Proposed changes to working document on compiled elements to be included in a reply liaison statement to liaise information to Joint Task Group 4-5-6-7 on spectrum requirements (Document 5D/300 Attachment 4.3): Aspects of coverage, capacity, performance, asymmetry and spectrum efficiency     United Kingdom of Great Britain and Northern Ireland     2013-07-03
[ 278 ]  
 
Proposed changes to working document to liaise information to Joint Task Group 4-5-6-7 on spectrum requirements as set out in Resolution 233 (Document 5D/300 Attachment 4.2)     United Kingdom of Great Britain and Northern Ireland     2013-07-03
[ 277 ]  
 
Mobile spectrum requirementss in the UK     United Kingdom of Great Britain and Northern Ireland     2013-07-03
[ 276 ]  
 
IMT base station antenna height for sharing study     France     2013-07-03
[ 275 ]  
 
WRC-15 Agenda item 1.2 : Proposals for frequency arrangements     France     2013-07-03
[ 274 ]  
 
Base station antenna heights for IMT-Advanced systems for use in studies in bands below 1 GHz under WRC-15 Agenda item 1.1     United Kingdom of Great Britain and Northern Ireland     2013-07-03
[ 273 ]  
 
Comments on the working document towards a preliminary draft new Report[IMT.BROAD.PPDR]     United Kingdom of Great Britain and Northern Ireland     2013-07-03
[ 272 ]  
 
Proposed revisions to the working document towards a preliminary draft new Report ITU-R M.[IMT.VISION] - "Framework and overall objectives of the future development of IMT for 2020 and beyond"     Alcatel-Lucent France , Alcatel-Lucent USA Inc.     2013-07-03
[ 271 ]  
 
Proposed revisions to the working document towards a preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS] - "Future technology trends of terrestrial IMT systems"     Alcatel-Lucent France , Alcatel-Lucent USA Inc.     2013-07-03
[ 270 ]  
 
Proposed liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1     Korea (Republic of)     2013-07-03
[ 269 ]  
 
Proposed liaison statement to Joint Task Group 4-5-6-7 on spectrum requirement for performance     Korea (Republic of)     2013-07-03
[ 268 ]  
 
Further information on technical feasibility of IMT in the bands above 6 GHz     Korea (Republic of)     2013-07-03
[ 267 ]  
 
Initial sharing studies between fixed service and mobile service in the band 27-29.5 GHz     Korea (Republic of)     2013-07-03
[ 266 ]  
 
Proposal on future IMT vision     Korea (Republic of) , Japan     2013-07-03
[ 265 ]  
 
Proposed text for the working document towards future technology trends of IMT systems     Korea (Republic of)     2013-07-03
[ 264 ]  
 
Proposal on a working document towards a Handbook on "Global trends in IMT" - [IMT.HANDBOOK]     Korea (Republic of) , Japan     2013-07-03
[ 263 ]  
 
Reply liaison statement - Parameters for LTE-Advanced and WirelessMAN-Advanced for use in sharing studies     WiMAX Forum     2013-07-03
[ 262 ]  
 
Working document towards a preliminary draft revision of Report ITU-R M.2039-2     WiMAX Forum     2013-07-03
[ 261 ]  
 
Answer to liaison statement to external organizations engaged in Recommendation ITU-R M.1457 related to revision of Recommendations ITU-R M.1580-4 AND ITU-R M.1581-4     Alcatel-Lucent France , Alcatel-Lucent Shanghai Bell , Alcatel-Lucent USA Inc. , AT&T, Inc. , Hitachi Ltd , Huawei Technologies Co. Ltd. , Motorola Mobility LLC , NTT DoCoMo, Inc. , Telecom Italia S.p.A.     2013-07-03
[ 260 ]  
 
Technical and operational aspects of passive and activer base station antennas for IMT systems     Alcatel-Lucent France , Alcatel-Lucent Shanghai Bell , Alcatel-Lucent USA Inc. , AT&T, Inc. , Hitachi, Ltd. , Huawei Technologies Co. Ltd. , NTT DoCoMo, Inc. , Telecom Italia S.p.A. , Telefon AB - LM Ericsson     2013-07-03
[ 259 ]  
 
System design information and dynamic data measurements of operating characteristics for a commercial IMT mobile broadband system in consideration of sharing study parameters     AT&T, Inc.     2013-07-03
[ 258 ]  
 
Proposed texts and modification to working document towards a Handbook on "Global trends in IMT", [IMT.HANDBOOK]     Japan     2013-07-03
[ 257 ]  
 
Proposals on further work for future IMT vision     Japan     2013-07-03
[ 256 ]  
 
Proposal on deployment-related parameters for sharing studies to be conducted by Joint Task Group 4-5-6-7 under WRC-15 Agenda item 1.1     Japan     2013-07-03
[ 255 ]  
 
Proposed liaison statement to JTG 4-5-6-7 on spectrum requirements for WRC-15 Agenda item 1.1     Japan     2013-07-03
[ 254 ]  
 
Proposal on the revision of Recommendation ITU-R M.1579-1     Japan     2013-07-03
[ 253 ]  
 
Reconsideration on developing a new Recommendation for IMT-Advanced OOBE characteristics     Japan     2013-07-03
[ 252 ]  
 
Input towards further development of preliminary draft new Recommendation ITU-R M.[IMT.VISION]     Intel Corporation , Samsung Electronics Co., Ltd.     2013-07-02
[ 251 ]  
 
Proposals on text for the preliminary draft new Recommendation ITU-R M.[IMT.VISION]     China (People's Republic of)     2013-07-02
[ 250 ]  
 
Proposals on Annex for the preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS]     Huawei Technologies Co. Ltd.     2013-07-02
[ 249 ]  
 
Proposals on text for the preliminary draft new Report ITU-R M.[IMT.FUTURE TECHNOLOGY TRENDS]     China (People's Republic of)     2013-07-02
[ 248 ]  
 
Proposal on PDNReport ITU-R M.[IMT.SMALL CELL]     China (People's Republic of)     2013-07-02
[ 247 ]  
 
Further clarification on small cell     Huawei Technologies Co. Ltd. , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom     2013-07-02
[ 246 ]  
 
Consideration on handling of national spectrum requirements towards the liaison statement for JTG 4-5-6-7 on WRC-15 Agenda item 1.1     China (People's Republic of)     2013-07-02
Resultados :694 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2021-01-11