Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-R : WP1B : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-R WP1B  C 

UIT-R WP1B

Metodologías para la Gestión Eficaz del Espectro y Estrategias Económicas

Resultados :250 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5  - Siguiente Next
Contribuciones  Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 100 ]  
 
Liaison statement to Working Party 1B on development of a draft new Report ITU-R SM.[WHITE-SPACE] - (Copy to Working Party 5A for information) - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities     WP 5D     2013-10-18
[ 99 ]  
 
Liaison statement to ITU-R Working Party 1B - Studies towards review of the definitions of fixed service, fixed station and mobile station - WRC-15 agenda item 9.1, issue 9.1.6 - Resolution 957 (WRC-12)     WP 5D     2013-10-18
[ 98 ]  
 
Liaison statement on draft revision of Recommendation ITU-R M.1076 "Wireless communication systems for persons with impaired hearing" (reply to Document 5B/110)     ITU-T JCA-AHF     2013-10-03
[ 97 ]  
 
Liaison statement on draft revision of Recommendation ITU-R M.1076     ITU-T JCA-AHF     2013-10-03
[ 96 ]  
 
Liaison statement to Working Party 1B - WRC-15 agenda item 9.1, issue 9.1.6     WP 4C     2013-09-30
[ 95 ]  
 
Liaison statement to Working Party 1B - Working Document towards a preliminary draft new Report ITU-R SM. [WHITE-SPACE] - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities     WP 4C     2013-09-30
[ 94 ]  
 
Information on the preparation of texts for the draft CPM Report to WRC-15     Chairman, CPM-15     2013-09-10
[ 93 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 1A, 1B, 4A and 5A for information) - Status of compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     WP 5D     2013-07-17
[ 92 ]  
+Ann.1-14 
Report on the meeting of Working Party 1B (Geneva, 4-11 June 2013)     Chairman, WP 1B     2013-06-11
[ 91 ]  
 
Final list of participants - Working Party 1B (Geneva, 4-11 June 2013)     Director, BR     2013-06-11
[ 90 ]  
(Rev.1) 
Note from the Chairman of Working Party 1A to the Chairman of Working Party 1B on Correspondence Group (CG-WPT) on developing content for possible preliminary draft new Report and Recommendation on WPT     Chairman, WP 1A     2013-06-10
[ 89 ]  
(Rev.1) 
Note from the Chairman of Working Party 1A to the Chairman of Working Party 1C - On Cognitive Radio Systems - Scope of spectrum engineering aspects to be included in a future ITU-R Report     Chairman, WP 1A     2013-06-06
[ 88 ]  
 
Conclusions from the Joint meeting of Working Parties 1A, 1B AND 1C (Tuesday, 4 June 2013)     Chairman, SG 1     2013-06-04
[ 87 ]  
 
List of documents issued (Documents 1B/42 - 1B/87)     BR Study Groups Department     2013-06-03
[ 86 ]  
 
Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing     WP 5A     2013-06-03
[ 85 ]  
 
Results of the 20th RAG meeting (Geneva, 22 to 24 May 2013)     Chairman, SG 1     2013-05-30
[ 84 ]  
 
Working document towards a preliminary draft revision of the ITU Handbook on "National Spectrum Management"     Canada     2013-05-28
[ 83 ]  
 
WRC-15 Agenda item 9.2 - Working document on issues for consideration under the Director's Report     Canada     2013-05-28
[ 82 ]  
 
Proposed working document towards a preliminary draft new Report ITU-R SM.[WHITE SPACE] - Spectrum management principles and techniques for the use of white spaces by radio systems employing cognitive capabilities     Canada     2013-05-28
[ 81 ]  
 
Preliminary draft revision of Report ITU-R SM.2257 - Spectrum management and monitoring during major events     Ukraine     2013-05-28
[ 80 ]  
 
EFIS presentation     European Communications Office     2013-05-28
[ 79 ]  
 
Preliminary draft revision of Recommendation ITU-R SM.1413-2 - Radiocommunication Data Dictionary (RDD)     United Kingdom of Great Britain and Northern Ireland     2013-05-28
[ 78 ]  
 
Draft revision to the content of the preliminary draft new Report ITU-R SM.[RES. 957] on enhancing the international regulatory framework in relation to Resolution 951 (Rev.WRC-07) which may be relevant to studies on WRC-15 Agenda item 9.1.6 - Studies towards review of the definitions of fixed service, fixed station and mobile station     China (People's Republic of)     2013-05-28
[ 77 ]  
 
Preliminary draft revision of Report ITU-R SM.2012-3 (2010) 'Economic aspects of spectrum management'     China (People's Republic of)     2013-05-28
[ 76 ]  
 
Working document towards a preliminary draft revision of the ITU Handbook on "National Spectrum Management - Chapter 1 (Spectrum Management Fundamentals) and Annex 1 (Spectrum Management Training)"     Korea (Republic of)     2013-05-28
[ 75 ]  
 
Working document towards a preliminary draft revision of the ITU Handbook on "National Spectrum Management - Chapter 6 (Spectrum Economics)"     Korea (Republic of)     2013-05-28
[ 74 ]  
 
Working document towards a preliminary draft revision of the ITU Handbook on "National Spectrum Management - Chapter 5 (Spectrum Engineering Practices)"     Korea (Republic of)     2013-05-28
[ 73 ]  
 
Report of the activities of the Rapporteur Group     Rapp. RG WP 1B rev. ITU H'book on "N.S.M."     2013-05-28
[ 72 ]  
 
Presentation of the Spectrum Management Handbook developed by the Administration of Colombia     Colombia (Republic of)     2013-05-27
[ 71 ]  
 
Liaison statement to Working Party 1B - WRC-15 Agenda item 9.1, Issue 9.1.6     WP 4A     2013-05-27
[ 70 ]  
 
Liaison statement to the JCA-AHF (copy for information to ITU-R WPs 1A, 1B, 5A, 5C and 6A, ITU-T FG-AVA, SGs 2 and 16, ITU-D SGs 1 and 2 and ETSI ERM TG 17) - Reply liaison statement on draft revision of Recommendation ITU-R M.1076     WP 5B     2013-05-24
[ 69 ]  
 
Working materials towards planned new Report on the implementation of the digital dividend - National experience of Russian Federation towards implementation of the Digital Dividend     Russian Federation     2013-05-23
[ 68 ]  
 
Proposal for working document towards a preliminary draft new Report ITU-R SM.[RES.67] - Studies on the updating and rearrangement of the Radio Regulations in relation to Resolution 67 (WRC-12)     Russian Federation     2013-05-23
[ 67 ]  
 
Liaison statement on technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHF frequency range (COM 16-LS 14) [to ITU-R WP 5A and ITU-T SG 16]     JCA-AHF     2013-05-23
[ 66 ]  
 
Revision of the Recommendation ITU-R SM.1603 - Spectrum redeployment as a method of national spectrum management     Benin (Republic of)     2013-05-22
[ 65 ]  
 
Results of the 19th RAG meeting (Geneva, 25 to 27 June 2012)     Chairman, SG 1     2013-05-16
[ 64 ]  
 
Liaison statement on nomination of JCA-AHF representatives     ITU-T JCA-AHF     2013-05-14
[ 63 ]  
 
Liaison statement to Working Part 1B - WRC-15 Agenda item 9.1, Issue 9.1.6     WP 4C     2013-05-06
[ 62 ]  
 
Proposal regarding the update of Report SM. 2153-3 - Technical and operating parameters and spectrum requirements for short-range devices     Netherlands (Kingdom of the)     2013-05-03
[ 61 ]  
 
Update to Recommendation ITU-R SM.1370 - Design guidelines for developing automated spectrum management systems     Israel (State of)     2013-04-25
[ 60 ]  
 
Status report of the Focus Group on Disaster Relief Systems, Network Resilience and Recovery (FG-DR&NRR)     ITU-T FG-DR&NRR     2013-04-17
[ 59 ]  
 
Preliminary draft revision of Recommendation ITU-R SM.1370-1 - Design guidelines for developing automated spectrum management systems     United States of America     2013-04-08
[ 58 ]  
+Corr.1 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5B, 7B, 7C, JTG 4-5-6-7 and the Special Committee as responsible Groups for WRC-15 Agenda items 1.1, 1.3, 1.5, 1.6, 1.9, 1.10, 1.11, 1.12, 1.17, 1.18, 7, 9.1.1, 9.1.2, 9.1.5, 9.1.6, 9.1.8, 10 (copy to Working Party 5D)     World Meteorological Organization     2013-03-06
[ 57 ]  
 
Reply liaison statement on draft revision of Recommendation ITU-R M.1076     ITU-T JCA-AHF     2013-02-13
[ 56 ]  
 
Liaison statement to Working Party 1B on further studies on cognitive radio systems (CRS)     WP 5D     2013-02-07
[ 55 ]  
 
Liaison statement to Working Party 6A on further studies on cognitive radio systems (CRS) (copy to Working Parties 1B, 5A and 5C)     WP 5D     2013-02-07
[ 54 ]  
 
Reply liaison statement to ITU-R Working Party 5A on technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHG frequency range     ITU-T SG 16     2013-02-06
[ 53 ]  
 
Studies on cognitive radio systems (white space devices) in Europe     Germany (Federal Republic of)     2013-02-04
[ 52 ]  
 
Liaison statement to Working Parties 1A, 1B, 5B, 5C and 6A (copy to ITU-T FG-AVA, ITU-T Study Group 2, ITU-D Study Group 2, ITU-D Study Group 1, ETSI ERM TG 17, JCA-AHF) - Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing     WP 5A     2012-11-15
[ 51 ]  
 
Liaison statement to Working Party 5A, 1A, 1B, 5C and 6A, ITU-T FG-AVA, ITU-T Study Group 2, ITU-D Study Group 2, ITU-D Study Group 1, ETSI ERM TG 17, JCA-AHF - Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing     WP 5B     2012-11-14
Resultados :250 documentos
Resultados :  Anterior -  1 - 2 - 3 - 4 - 5  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  Coordenador de Web UIT-R
Actualizado el : 2020-12-16