International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2018-10-08 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2018-10-08) 

ITU-T SG 15

Transport, access and home

Study Period 2017

Meeting  from 2018-10-08 to 2018-10-19

held in Switzerland [Geneva]

Other Meetings : 2021-12-06  2021-04-12  2020-09-07  2020-01-27  2019-07-01  2018-01-29  2017-06-19 

Results:40 total items.
Contributions  [ AI/Question: Q2/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1145 ]  
 
Additional PSD relaxations based on September 2018 PSD Calculator     Calix Networks, Inc. (United States) , ADTRAN (United States) , Nokia Corporation (Finland)   Q2/15   2018-09-25
[ 1144 ]  
 
OOB/OOC Calculator for NG-PON2 - Update     Calix Networks, Inc. (United States) , ADTRAN (United States) , Nokia Corporation (Finland)   Q2/15   2018-09-25
[ 1143 ]  
 
Channel Spacing, MSE and Tuning Range Considerations for HSP.TWDM     Calix Networks, Inc. (United States) , ADTRAN (United States) , Verizon Communication Corporation (United States)   Q2/15   2018-09-25
[ 1141 ]  
(Rev.1) 
Four-Wave Mixing impact on 50Gbps/? TWDM in the O-band     ADTRAN (United States)   Q2/15   2018-09-25
[ 1140 ]  
(Rev.1) 
FEC Selection for ITU 50Gbps/? PON (Single- and Multi-Channel)     ADTRAN (United States) , Calix Networks, Inc. (United States)   Q2/15   2018-09-25
[ 1138 ]  
 
Proposed scope for G.hsp.TWDMpmd     ADTRAN (United States) , Calix Networks, Inc. (United States) , Verizon Communication Corporation (United States)   Q2/15   2018-09-25
[ 1136 ]  
 
Proposed Skeleton for G.hsp.TWDMpmd     ADTRAN (United States) , Calix Networks, Inc. (United States) , Verizon Communication Corporation (United States)   Q2/15   2018-09-25
[ 1105 ]  
 
Combining OLT CTs with multiple ODN classes in a NG-PON2 system     Verizon Communication Corporation (United States)   Q2/15   2018-09-25
[ 1103 ]  
 
A WDM-PON de-multiplexer for 5G fronthaul     FiberHome Technologies Group (China)   Q2/15   2018-09-25
[ 1102 ]  
 
Bonded ONU activation     Verizon Communication Corporation (United States)   Q2/15   2018-09-25
[ 1101 ]  
 
Unified DBA framework     Verizon Communication Corporation (United States)   Q2/15   2018-09-25
[ 1100 ]  
 
NG-PON2: Revisiting Class 2 tuning time definition     ADTRAN (United States) , Calix Networks, Inc. (United States) , Nokia Corporation (Finland) , Verizon Communication Corporation (United States)   Q2/15   2018-09-25
[ 1099 ]  
 
G.989.3: Timing parameters of T-CONT descriptor     ADTRAN (United States) , Calix Networks, Inc. (United States) , Verizon Communication Corporation (United States)   Q2/15   2018-09-25
[ 1098 ]  
 
G.sup.5G: Note on quiet window elimination in TWDM PON     ADTRAN (United States) , Calix Networks, Inc. (United States) , Verizon Communication Corporation (United States)   Q2/15   2018-09-25
[ 1096 ]  
 
Accuracy of ToD distribution in NG-PON2     ADTRAN (United States) , Calix Networks, Inc. (United States) , Verizon Communication Corporation (United States)   Q2/15   2018-09-25
[ 969 ]  
 
Proposal for G.hsp.req on 50G TDM-PON co-existence and migration     China Telecommunications Corporation , China Unicom   Q2/15   2018-09-25
[ 924 ]  
 
Description of CO DBA signaling interface for G.989.3 Amd 2     Nokia Corporation (Finland)   Q2/15   2018-09-24
[ 923 ]  
 
Revision of Figure 6-4 of G.sup.5GP     Nokia Corporation (Finland)   Q2/15   2018-09-24
[ 921 ]  
 
Description of CO DBA for G.989.3 Amd 2     Nokia Corporation (Finland)   Q2/15   2018-09-24
[ 911 ]  
 
A study on SOA for 50G-PON based on 25G optics     FiberHome Technologies Group (China)   Q2/15   2018-09-24
[ 910 ]  
 
Study of WDM-PON application in 5G Fronthaul and Propose to include key system requirement into G.sup.5GP     China Telecommunications Corporation   Q2/15   2018-09-24
[ 909 ]  
 
Proposal for G.hsp.req on service requirement of 50G TDM-PON     China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q2/15   2018-09-24
[ 908 ]  
 
Proposal for G.hsp.req on 50G TDM-PON architecture     China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q2/15   2018-09-24
[ 907 ]  
 
Improved dispersion tolerance for 50G-PON downstream transmission via receiver-side equalization     Futurewei Technologies US R&D Center (United States)   Q2/15   2018-09-24
[ 882 ]  
 
Protocol-based channel bonding in G.HSP.ComTC     Futurewei Technologies US R&D Center (United States)   Q2/15   2018-09-21
[ 881 ]  
 
Discussion on rate related TC layer spec in G.HSP.ComTC     Futurewei Technologies US R&D Center (United States)   Q2/15   2018-09-21
[ 880 ]  
 
FEC Code in IEEE P802.3ca and ITU 50GPON FEC Discussion     Futurewei Technologies US R&D Center (United States)   Q2/15   2018-09-21
[ 879 ]  
 
Real-Time Measurements on Soft-Decision LDPC for 50G-PON     Futurewei Technologies US R&D Center (United States)   Q2/15   2018-09-21
[ 878 ]  
 
Proposed appendix material on the Sharpness of OOC     Futurewei Technologies US R&D Center (United States)   Q2/15   2018-09-21
[ 864 ]  
 
Co-existence options for 50Gbit/s upstream     ZTE Corporation (China)   Q2/15   2018-09-21
[ 862 ]  
 
Line rate options for 50G-PON     ZTE Corporation (China)   Q2/15   2018-09-21
[ 857 ]  
(Rev.1-2) 
Comments on G.9806     Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q2/15   2018-09-21
[ 851 ]  
 
Attribute of RE reporting related ONU in G.988     ZTE Corporation (China)   Q2/15   2018-09-21
[ 849 ]  
 
Proposal of link pass through function in G.9806     KDDI Corporation (Japan)   Q2/15   2018-09-21
[ 831 ]  
 
Proposal for revision of Appendix VII in G.RoF recommendation     Korea (Rep. of)   Q2/15   2018-09-21
[ 817 ]  
 
Proposal for updating clause 1 scope and Figure A-1 in G.RoF     Electronics and Telecommunications Research Institute (ETRI) (Korea (Rep. of)) , Futurewei Technologies US R&D Center (United States)   Q2/15   2018-09-21
[ 816 ]  
 
Low Latency Requirements for G.hsp series Recommendation     ZTE Corporation (China)   Q2/15   2018-09-20
[ 811 ]  
 
Revision for Section 10.1.1 of G.sup.5GP     Nokia Corporation (Finland) , ZTE Corporation (China)   Q2/15   2018-09-20
[ 788 ]  
 
5G synchronization requirements in G.8271     Telefon AB - LM Ericsson (Sweden)   Q2/15, Q13/15, Q11/15   2018-09-19
[ 771 ]  
(Rev.1) 
OAM functions for 5G wireless fronthaul     Futurewei Technologies US R&D Center (United States) , ZTE Corporation (China)   Q2/15   2018-09-17
Results:40 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-3-28