International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2017-06-19 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  TD-WP1 (2017-06-19) 

ITU-T SG 15

Transport, access and home

Study Period 2017

Meeting  from 2017-06-19 to 2017-06-30

held in Switzerland [Geneva]

Other Meetings : 2021-12-06  2021-04-12  2020-09-07  2020-01-27  2019-07-01  2018-10-08  2018-01-29  [ 2017-06-19 ] 

Results:118 total items.
Result page:  Previous -  1 - 2 - 3
Temporary Documents  (WP1)   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 18-WP1 ]  
 
LS/o -Reply to Liaison "Low Power Modes for Fibre backhaul for FTTdp" (reply to TD1-WP1)     Rapporteur Q2/15   Q2/15   2017-01-06
[ 17-WP1 ]  
 
LS/i/r -Preliminary Draft New Recommendation ITU-R SM.[G.WNB-FREQ] (reply to SG15-LS355)     ITU-R Working Party 1B   Q15/15   2017-01-06
[ 16-WP1 ]  
 
LS/i - Visible light for broadband communication     ITU-R Working Party 1A   Q18/15   2017-01-06
[ 15-WP1 ]  
 
LS/i/r on the determination of Amendment 1 to Recommendation ITU-T G.9700 (2014) (reply to SG15-LS361)     ITU-R Working Party 1A   Q4/15   2017-01-06
[ 14-WP1 ]  
 
LS/i/r to Low Power Modes for Fibre backhaul for FTTdp October 3, 2016 Communication (reply to TD1-WP1)     IEEE 802.3 Working Group   Q4/15, Q2/15   2017-01-06
[ 13-WP1 ]  
 
LS/i/r on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014) (reply to SG15-LS361)     ITU-R Working Party 5A   Q4/15   2017-01-06
[ 12-WP1 ]  
 
LS/o/r to ETSI TC ATTM TM6 concerning the definition of PE-PEB for RPF. (reply to TD7 (WP1/15))     Study Group 15   Q4/15   2017-01-06
[ 11-WP1 ]  
 
LS/o/r regarding use of G.9701 Annex S to facilitate field upgrades to PSE equipment in the one box RPF scenario.(reply to TD6/WP1 )     Study Group 15   Q4/15   2017-01-06
[ 10-WP1 ]  
 
LS/i on access/home network transport     ITU-R Working Party 6B   Q1/15   2017-01-06
[ 9-WP1 ]  
 
LS/i on availability of downstream ATP information to G.fast CPE     Broadband Forum   Q4/15   2017-01-06
[ 8-WP1 ]  
 
LS/i/r on Change to the valid range of G.997.1 managed object LSYMB (reply to SG15-LS365)     Broadband Forum   Q4/15   2017-01-06
[ 7-WP1 ]  
 
LS/i concerning definition of PE-PEB for RPF     ETSI TC ATTM TM6   Q4/15   2017-01-06
[ 6-WP1 ]  
 
LS/i/r on determined and consented Recommendations related to DSL and G.fast (reply to SG15 - LS 395)     ETSI TC ATTM TM6   Q4/15   2017-01-06
[ 5-WP1 ]  
 
LS/i from ISO/IEC JTC 1/SC 6/WG1 to IEEE 1901 WG and ITU-T Q18/15     JTC 1/SC 6/WG1 Convener   Q18/15   2017-01-06
[ 4-WP1 ]  
 
LS/o - Requirements for mobile backhaul/fronthaul in a G.fast Deployment Environment     Rapporteur Q4/15   Q4/15   2017-01-06
[ 3-WP1 ]  
 
LS/i/r on New version of the Home Network Transport (HNT) Standards Overview and Work Plan (reply to SG15 - LS 387 -E and SG15 - LS 392 -E)     ITU-T Study Group 5   Q1/15   2017-01-06
[ 2-WP1 ]  
 
LS/i/r - Reply on the latest version of the Home Network Transport (HNT) Standards Overview and Work Plan (reply to SG15 - LS280)     MoCA   Q1/15   2017-01-06
[ 1-WP1 ]  
 
LS/i on low power modes for fibre backhaul for FTTdp     Broadband Forum   Q2/15   2017-01-06
Results:118 total items.
Result page:  Previous -  1 - 2 - 3  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-24