International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2017-06-19 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2017-06-19) 

ITU-T SG 15

Transport, access and home

Study Period 2017

Meeting  from 2017-06-19 to 2017-06-30

held in Switzerland [Geneva]

Other Meetings : 2021-12-06  2021-04-12  2020-09-07  2020-01-27  2019-07-01  2018-10-08  2018-01-29 

Results:23 total items.
Contributions  [ Source: Microsemi Corporation (United States) ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 398 ]  
 
Comparison of PTP Monitoring Options of Annex G [G.8275.1]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 397 ]  
(Rev.1) 
Network Slicing as a Service Considerations     Microsemi Corporation (United States)   Q11/15   2017-06-06
[ 396 ]  
 
Study of OTUCn and FlexE Device Latency for 5G Front Haul Applications     Microsemi Corporation (United States)   Q11/15   2017-06-06
[ 395 ]  
 
Study of OTUCn and FlexE Device Complexity for 5G Front Haul Applications     Microsemi Corporation (United States)   Q11/15   2017-06-06
[ 389 ]  
 
OAM Considerations for 5G Front Haul Applications     Microsemi Corporation (United States)   Q11/15   2017-06-06
[ 388 ]  
 
PLL Convergence of Unmonitored Connection: Start-Up or Switching [G.8275.1, G.8273.2]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 383 ]  
 
Towards Developing an Optimized Transport Network for 5G Front Haul Applications     Microsemi Corporation (United States)   Q11/15   2017-06-06
[ 369 ]  
 
Comments and recommended corrections to the FEC specification in draft G.709otu4lr     Microsemi Corporation (United States)   Q11/15   2017-06-06
[ 366 ]  
 
Impact of Timestamp Processing Delay [G.8275.1]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 354 ]  
 
G.8273.1 T-GM interfaces     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 353 ]  
 
G.8272 amendment number     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 352 ]  
 
ePRC phase discontinuity requirement     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 339 ]  
 
Misc Profile Clean-Up [G.8275.1]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 335 ]  
 
Alternate Master Time Information: Use Description [G.8275.1]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 333 ]  
 
Alternate Master Time Information: Splitting PASSIVE & MASTER/SLAVE [G.8275.1]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 331 ]  
 
Network Limits & Usefulness of Alignment [G.8271.2]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 329 ]  
 
Enhanced Holdover Reporting T-TSC-P &T-TSC-A [G.8275.2]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 328 ]  
 
Mapping clockClass to QL [G.8275.1, G.8275.2]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 327 ]  
 
PTP states [G.810, G.syncOAM]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 206 ]  
(Rev.1) 
Network Slicing Considerations     Microsemi Corporation (United States) , Nokia USA   Q12/15, Q11/15, Q10/15   2017-06-05
[ 154 ]  
 
Proposal to start new projects to specify 5G transport over OTN     China Mobile Communications Corporation , FiberHome Technologies Group (China) , Huawei Technologies Co., Ltd. (China) , Microsemi Corporation (United States) , Ministry of Industry and Information Technology (MIIT) (China) , ZTE Corporation (China)   Q11/15   2017-06-05
[ 94 ]  
+Corr.1 
Proposal of methods and parameters of oscillator monitoring (G.Suppl. Sync OAM)     Microsemi Corporation (United States) , Nippon Telegraph and Telephone Corporation (NTT) (Japan)   Q13/15   2017-06-04
[ 13 ]  
(Rev.1) 
PRTC-B addition to G.8272 including TE, MTIE, TDEV requirements     A1 Telekom Austria AG , ADVA Optical Networking (United Kingdom) , China Mobile Communications Corporation , Deutsche Telekom AG (Germany) , Microsemi Corporation (United States) , Orange (France) , Swisscom SA   Q13/15   2017-05-23
Results:23 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-19