International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2017-06-19 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2017-06-19) 

ITU-T SG 15

Transport, access and home

Study Period 2017

Meeting  from 2017-06-19 to 2017-06-30

held in Switzerland [Geneva]

Other Meetings : 2021-12-06  2021-04-12  2020-09-07  2020-01-27  2019-07-01  2018-10-08  2018-01-29 

Results:94 total items.
Result page:  1 - 2  - Next Next
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 398 ]  
 
Comparison of PTP Monitoring Options of Annex G [G.8275.1]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 388 ]  
 
PLL Convergence of Unmonitored Connection: Start-Up or Switching [G.8275.1, G.8273.2]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 366 ]  
 
Impact of Timestamp Processing Delay [G.8275.1]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 354 ]  
 
G.8273.1 T-GM interfaces     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 353 ]  
 
G.8272 amendment number     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 352 ]  
 
ePRC phase discontinuity requirement     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 348 ]  
(Rev.1) 
GNSS document introduction     Nokia Corporation   Q13/15   2017-06-06
[ 339 ]  
 
Misc Profile Clean-Up [G.8275.1]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 335 ]  
 
Alternate Master Time Information: Use Description [G.8275.1]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 333 ]  
 
Alternate Master Time Information: Splitting PASSIVE & MASTER/SLAVE [G.8275.1]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 331 ]  
 
Network Limits & Usefulness of Alignment [G.8271.2]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 329 ]  
 
Enhanced Holdover Reporting T-TSC-P &T-TSC-A [G.8275.2]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 328 ]  
 
Mapping clockClass to QL [G.8275.1, G.8275.2]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 327 ]  
 
PTP states [G.810, G.syncOAM]     Microsemi Corporation (United States)   Q13/15   2017-06-06
[ 324 ]  
 
G.8271: Time-of-Day Checksum Field     Calnex Solutions Limited   Q13/15   2017-06-06
[ 309 ]  
 
T-TC residence time measurement     Huawei Technologies Co., Ltd. (China) , CAICT , MITT   Q13/15   2017-06-06
[ 307 ]  
 
Resolving GNSS Errors- WD_GNSS     Orange (France)   Q13/15   2017-06-06
[ 306 ]  
 
Revision of structure/format of "Appendix for GNSS receiver usage"document     Nokia USA , Orange (France)   Q13/15   2017-06-06
[ 305 ]  
 
Text clarifications on the clause "Short-term interruption" in G.8262/G.8262.1     Calnex Solutions Limited , Orange (France)   Q13/15   2017-06-06
[ 304 ]  
 
Study of PTP transients in congruent/non-congruent scenario     Orange (France)   Q13/15   2017-06-06
[ 303 ]  
 
Fronthaul network reference model     Orange (France)   Q13/15   2017-06-06
[ 302 ]  
 
Fronthaul synchronization requirements     Orange (France)   Q13/15   2017-06-06
[ 301 ]  
 
Impact of functional splits on synchronization requirements     Orange (France)   Q13/15   2017-06-06
[ 300 ]  
 
APTS scenarios in 8271.2 and 8273.4     Nokia Corporation   Q13/15   2017-06-06
[ 294 ]  
(Rev.1-2) 
Frequency Amplitude Estimation Method for G.8273.2 Appendix VI     Calnex Solutions Limited , RAD Data Communications, Ltd.   Q13/15   2017-06-06
[ 289 ]  
+Corr.1 
Comments and Proposals for G.8273.2 Appendix VI Choice of Frequencies for Measuring Noise Transfer     RAD Data Communications, Ltd.   Q13/15   2017-06-06
[ 271 ]  
+Corr.1 
Editorial Comments on G.8275.1     RAD Data Communications, Ltd.   Q13/15   2017-06-06
[ 270 ]  
+Corr.1 
Editorial Comments on G.8275.2     RAD Data Communications, Ltd.   Q13/15   2017-06-06
[ 269 ]  
 
Consideration on frequency selection and frequency recovery for the G.8273.2 noise transfer test     China Unicom   Q13/15   2017-06-06
[ 268 ]  
 
Clarification on WD39 of Shanghai meeting     China Unicom , ZTE Corporation (China)   Q13/15   2017-06-06
[ 264 ]  
 
Monitoring Time Offset in PTP Connections [G.8275.1, G.Suppl.SyncOAM]     Huawei Technologies Co., Ltd. (China) , ZTE Corporation (China)   Q13/15   2017-06-06
[ 263 ]  
 
PDV noise tolerance test of G.8263     China Unicom , Huawei Technologies Co., Ltd. (China) , Orange (France)   Q13/15   2017-06-06
[ 262 ]  
 
Title revision of Q13 recommendation     Orange (France) , CAICT , China Mobile Communications Corporation , China Unicom , Huawei Technologies Co., Ltd. (China)   Q13/15   2017-06-06
[ 261 ]  
 
Network limit of G.8271.2     Huawei Technologies Co., Ltd. (China)   Q13/15   2017-06-06
[ 260 ]  
 
Cable delay effects and correction in a GNSS receiver     Nokia Corporation   Q13/15   2017-06-06
[ 259 ]  
 
Initial PTP simulation Results for HRMs containing eEECs, ePRTCs, and Class C T-BCs     Huawei Technologies Co., Ltd. (China)   Q13/15   2017-06-06
[ 258 ]  
(Rev.1) 
5G Sync Requirement [G.8271]     Orange (France) , CAICT , China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China) , MITT   Q13/15   2017-06-06
[ 257 ]  
 
Proposals for G.781 to address remaining items prior to planned consent [G.781]     China Mobile Communications Corporation , Huawei Technologies Co., Ltd. (China)   Q13/15   2017-06-06
[ 256 ]  
 
Clarification of T-TSC specification     Huawei Technologies Co., Ltd. (China)   Q13/15   2017-06-06
[ 255 ]  
 
T-TC residence time proposal     Huawei Technologies Co., Ltd. (China) , CAICT , MITT   Q13/15   2017-06-06
[ 243 ]  
(Rev.1) 
Effect of thermal ramps on phase accuracy for APTS and PTS implementations     Nokia Corporation   Q13/15   2017-06-06
[ 235 ]  
 
Considerations on Mobile Fronthaul and 5G Transport     Telefon AB - LM Ericsson (Sweden)   Q13/15, Q11/15   2017-06-06
[ 234 ]  
 
Editorial proposals for G.8271.1 Appendix VIII     Telefon AB - LM Ericsson (Sweden)   Q13/15   2017-06-06
[ 226 ]  
 
Simulation results on the influence of atomic clock group change on combinatorial clock output performance.     Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2017-06-06
[ 224 ]  
 
An implementation of ePRC based on optical clock     Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2017-06-06
[ 223 ]  
 
Some consideration for TDEV tolerance noise in G.812     Huawei Technologies Co., Ltd. (China) , Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2017-06-06
[ 221 ]  
 
Some suggestions for the definition of phase discontinuity in G.811.1     Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2017-06-06
[ 220 ]  
 
A potential solution for combinatorial clock optimization in G.811.1     Ministry of Industry and Information Technology (MIIT) (China)   Q13/15   2017-06-06
[ 204 ]  
 
Noise generation requirement in G.8262.1     Qulsar, Inc.   Q13/15   2017-06-05
[ 202 ]  
 
Packet selection implication in G.8273.2     Qulsar, Inc.   Q13/15   2017-06-05
Results:94 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-3-29