International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 5 : Meeting 2018-05-21 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 5  C (2018-05-21) 

ITU-T SG 5

Environment, climate change and circular economy

Study Period 2017

Meeting  from 2018-05-21 to 2018-05-25

held in Switzerland [Geneva]

Other Meetings : 2021-11-30  2021-05-11  2020-10-19  2020-05-11  2019-09-16  2019-05-13  2018-09-11  2018-03-05  2017-11-13  2017-05-15 

Results:3 total items.
Contributions  [ Source: Huawei Technologies Co., Ltd. ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 242 ]  
 
Second Draft new Recommendation ITU-T K.wire-line_emc     Huawei Technologies Co., Ltd.   Q4/5   2018-05-03
[ 241 ]  
(Rev.1-2) 
The proposal of Mains power contact test for outdoor UTP/STP Ethernet in ITU-T K.20/K.21/K.45     Huawei Technologies Co., Ltd.   Q2/5   2018-05-03
[ 240 ]  
 
Proposal to add a new Appendix to give some examples for protection GPS system against lightning in ITU-T K.112     Huawei Technologies Co., Ltd.   Q1/5   2018-05-03
Results:3 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25