International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Results:2210 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1538 ]  
 
G.8272.1 Clause 6.1     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1537 ]  
 
G.8272.1 Clause 6     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1536 ]  
 
G.8272.1 scope     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1535 ]  
 
G.8275.2 Support interoperability with equipment deployed per ITU-T G.8265.1     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1534 ]  
 
G.8275.2 Table 1     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1533 ]  
 
G.8275.2 data set members     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1532 ]  
 
G.8275.1 twoStepFlag range for a Telecom Time Slave Clock     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1531 ]  
 
G.8265.1 twoStepFlag range for a Slave only clock     Integrated Device Technology (IDT)   Q13/15   2016-01-28
[ 1530 ]  
 
Considerations on new Ethernet signals over OTN     KDDI Corporation   Q11/15   2016-01-28
[ 1529 ]  
 
Process for contributing     Telecom Italia S.p.A.   Q9/15   2016-01-28
[ 1528 ]  
 
Analysis of cross gain modulation caused by pilot tones     ADVA Optical Networking   Q6/15   2016-01-27
[ 1527 ]  
 
Method for Carrier Phase Recovery     Coriant GmbH & Co. KG , Keysight Technologies Deutschland GmbH   Q6/15   2016-01-27
[ 1526 ]  
 
G.fast - Need for improved reporting of EFTR     Swisscom SA   Q4/15   2016-01-27
[ 1525 ]  
 
Proposal of Cooperation Interface enabling Low-latency Services     Nippon Telegraph and Telephone Corporation (NTT)   Q2/15   2016-01-27
[ 1524 ]  
 
G.fast - Need for seamless reconfiguration of TARSNRM     Swisscom SA   Q4/15   2016-01-22
[ 1523 ]  
 
Follow-up on G.8275.2: Requirement for an Accurate T3 Value     Orange   Q13/15   2016-01-22
[ 1522 ]  
 
Summary on G.8266 for finalization.     Orange   Q13/15   2016-01-22
[ 1521 ]  
 
Clarification on the timing accuracy specification for the 1PPS measurement interface     Huawei Technologies Co., Ltd. , Orange , Telefon AB - LM Ericsson   Q13/15, Q11/15   2016-01-22
[ 1520 ]  
 
Editorial on ToD from the contribution WDPisa32     Orange   Q13/15   2016-01-22
[ 1519 ]  
 
Phase/time synchronization over Microwave networks     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-01-22
[ 1518 ]  
 
Additional information on frequencyTraceable Flag of G.8275.1     Orange   Q13/15   2016-01-22
[ 1517 ]  
 
Text modification under section 6.4 of G.8275.1     China Unicom , Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-01-22
[ 1516 ]  
 
PTP interfaces requirements for G.8266     Orange   Q13/15   2016-01-22
[ 1515 ]  
 
Proposal to study Synchronization over Ethernet in the Fronthaul (G.8271)     Orange   Q13/15   2016-01-22
[ 1514 ]  
 
Functional Block diagram for ePRTC     Orange   Q13/15   2016-01-22
[ 1513 ]  
 
Withdrawn by submitter     N/A     2016-01-21
[ 1512 ]  
 
Withdrawn by submitter     N/A     2016-01-21
[ 1511 ]  
 
Withdrawn by submitter     N/A     2016-01-21
[ 1510 ]  
 
Withdrawn by submitter     N/A     2016-01-21
[ 1509 ]  
 
Withdrawn by submitter     N/A     2016-01-21
[ 1508 ]  
 
Withdrawn by submitter     N/A     2016-01-21
[ 1507 ]  
 
Withdrawn by submitter     N/A     2016-01-21
[ 1506 ]  
(Rev.1-2) 
Metro 100G WDM interface for optical transport networks     Acacia Communications, Inc , China Telecommunications Corporation , Orange , Telecom Italia S.p.A.   Q6/15   2016-01-20
[ 1505 ]  
 
Comments of DoT on revision of Recommendation G.652 and G.657     India , Ministry of Communications and Information Technology   Q5/15   2016-01-20
[ 1504 ]  
 
Additional DML Measurements for the 4L1-9D1F code     Finisar Corporation   Q6/15   2016-01-16
[ 1503 ]  
 
4L1-9D1F code - Maximum Channel Power Difference Proposal     Finisar Corporation   Q6/15   2016-01-16
[ 1502 ]  
 
EML Measurements supporting the 4L1-9D1F application code     Finisar Corporation   Q6/15   2016-01-16
[ 1501 ]  
(Rev.1) 
Standardization of optical switching (photonic sub-lambda switching): what for?  
C-1501 Rev.1 corrects the Source information. There is no change to the content of the Contribution.
 
Huawei Technologies Co., Ltd. , Orange , Portugal Telecom , Telefónica S.A. , Verizon Communication Corporation   Q12/15   2016-01-15
[ 1500 ]  
(Rev.1) 
Technical Report of Optical Fibres, Cables and Systems (TR-OFCS)     Ministère de la Communication et des Technologies de l'Information, Benin   Q12/15   2016-01-13
[ 1499 ]  
 
Release of BT cable (20 pair) NEXT measurements for use in simulations     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2015-12-10
[ 1498 ]  
 
Holdover Performance of T-BC with Physical Layer Assistance [G.8273.2]     Microsemi   Q13/15   2015-06-09
[ 1497 ]  
 
Rewording Holdover section [G.8273.2]     Microsemi   Q13/15   2015-06-09
[ 1496 ]  
 
G.dpm: Proposal for text modifications in G.dpm draft Recommendation     Lantiq Beteiligungs-GmbH & Co. KG   Q4/15   2015-06-09
[ 1495 ]  
 
Noise Generation T-TC [G.8273.3]     Microsemi   Q13/15   2015-06-09
[ 1494 ]  
 
Use of SyncE to backup GNSS [G.8275, G.8262.1]     Microsemi   Q13/15   2015-06-09
[ 1493 ]  
 
Backup PTP Connections in Partial On-Path Support Networks [G.8275, G.8275.2]     Microsemi   Q13/15   2015-06-09
[ 1492 ]  
 
TLV to carry timestamp interface information [G.8275.2]     Microsemi   Q13/15   2015-06-09
[ 1491 ]  
 
Definition of 2x1Way FPP for Partial On-Path Support [G.8260, G.8271.2]     Microsemi   Q13/15   2015-06-09
[ 1490 ]  
 
Annex C in 989.2 Amd1     British Telecommunications Public Ltd. Co. (BT Plc)   Q2/15   2015-06-09
[ 1489 ]  
 
Comments to G.989.3 Draft 20150601     Electronics and Telecommunications Research Institute (ETRI)   Q2/15   2015-06-09
Results:2210 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2016-09-28