International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2016-02-15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2016-02-15) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2016-02-15 to 2016-02-26

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-07-01  2013-02-01 

Results:371 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1519 ]  
 
Phase/time synchronization over Microwave networks     Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-01-22
[ 1518 ]  
 
Additional information on frequencyTraceable Flag of G.8275.1     Orange   Q13/15   2016-01-22
[ 1517 ]  
 
Text modification under section 6.4 of G.8275.1     China Unicom , Huawei Technologies Co., Ltd. , Orange   Q13/15   2016-01-22
[ 1516 ]  
 
PTP interfaces requirements for G.8266     Orange   Q13/15   2016-01-22
[ 1515 ]  
 
Proposal to study Synchronization over Ethernet in the Fronthaul (G.8271)     Orange   Q13/15   2016-01-22
[ 1514 ]  
 
Functional Block diagram for ePRTC     Orange   Q13/15   2016-01-22
[ 1513 ]  
 
Withdrawn by submitter     N/A     2016-01-21
[ 1512 ]  
 
Withdrawn by submitter     N/A     2016-01-21
[ 1511 ]  
 
Withdrawn by submitter     N/A     2016-01-21
[ 1510 ]  
 
Withdrawn by submitter     N/A     2016-01-21
[ 1509 ]  
 
Withdrawn by submitter     N/A     2016-01-21
[ 1508 ]  
 
Withdrawn by submitter     N/A     2016-01-21
[ 1507 ]  
 
Withdrawn by submitter     N/A     2016-01-21
[ 1506 ]  
(Rev.1-2) 
Metro 100G WDM interface for optical transport networks     Acacia Communications, Inc , China Telecommunications Corporation , Orange , Telecom Italia S.p.A.   Q6/15   2016-01-20
[ 1505 ]  
 
Comments of DoT on revision of Recommendation G.652 and G.657     India , Ministry of Communications and Information Technology   Q5/15   2016-01-20
[ 1504 ]  
 
Additional DML Measurements for the 4L1-9D1F code     Finisar Corporation   Q6/15   2016-01-16
[ 1503 ]  
 
4L1-9D1F code - Maximum Channel Power Difference Proposal     Finisar Corporation   Q6/15   2016-01-16
[ 1502 ]  
 
EML Measurements supporting the 4L1-9D1F application code     Finisar Corporation   Q6/15   2016-01-16
[ 1501 ]  
(Rev.1) 
Standardization of optical switching (photonic sub-lambda switching): what for?  
C-1501 Rev.1 corrects the Source information. There is no change to the content of the Contribution.
 
Huawei Technologies Co., Ltd. , Orange , Portugal Telecom , Telefónica S.A. , Verizon Communication Corporation   Q12/15   2016-01-15
[ 1500 ]  
(Rev.1) 
Technical Report of Optical Fibres, Cables and Systems (TR-OFCS)     Ministère de la Communication et des Technologies de l'Information, Benin   Q12/15   2016-01-13
[ 1499 ]  
 
Release of BT cable (20 pair) NEXT measurements for use in simulations     British Telecommunications Public Ltd. Co. (BT Plc)   Q4/15   2015-12-10
Results:371 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-19