International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2014-03-24 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2014-03-24) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2014-03-24 to 2014-04-04

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2013-12-06  2013-07-01  2013-02-01 

Results:61 total items.
Result page:  1 - 2  - Next Next
Contributions  [ Source: Huawei Technologies Co. Ltd. ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 764 ]  
 
G.vdsl: New 998ADE17 Band Plan for VDSL2     China Telecommunications Corporation , China Unicom , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 763 ]  
 
G.fast: Means for Transmission of Sync Symbols and RMC Symbols in L2.2     Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 762 ]  
 
G.fast: On TIGA and SRA     Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q4/15   2014-03-11
[ 747 ]  
 
Information on Upcoming New Work on B100G OTN     Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2014-03-11
[ 739 ]  
(Rev.1) 
Proposal of new recommendation on studying wavelength selective optical distribution networks and related system in Q2/SG15     China Mobile Communications Corporation , China Telecommunications Corporation , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT)   Q2/15   2014-03-11
[ 737 ]  
 
Synchronization over OTN: application scenarios and standardization requirements for different OTN interface structures     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q13/15, Q11/15   2014-03-11
[ 736 ]  
 
Frequency and time synchronization over OTN: requirements, implementation, deployments and test performance     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q13/15, Q11/15   2014-03-11
[ 735 ]  
 
Proposal on Synchronization OAM in packet networks     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q13/15, Q10/15   2014-03-11
[ 697 ]  
 
G.hn: Discussion on method for creating a secure G.hn domain     China Telecommunications Corporation , Huawei Technologies Co. Ltd. , ZTE Corporation   Q18/15   2014-03-11
[ 691 ]  
 
proposal for TWDM PON Protection in G.989.1     China Telecommunications Corporation , Huawei Technologies Co. Ltd. , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q2/15   2014-03-11
[ 687 ]  
 
Consideration for 1588 over OTN by ESC     Calnex Solutions Limited , China Unicom , Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2014-03-11
[ 685 ]  
 
Test and analysis about PTP over OTN by transparent mode     Calnex Solutions Limited , China Unicom , Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2014-03-11
[ 667 ]  
 
Component-based recursive description for software defined transport networks     China Telecommunications Corporation , Coriant GmbH & Co. KG , Huawei Technologies Co. Ltd.   Q14/15, Q12/15   2014-03-10
[ 666 ]  
 
Virtualization for the software defined transport networks     China Telecommunications Corporation , Coriant GmbH & Co. KG , Huawei Technologies Co. Ltd.   Q14/15, Q12/15   2014-03-10
[ 663 ]  
 
Proposal to start work on a Recommendation specifying the architecture of the software defined transport network     China Telecommunications Corporation , Coriant GmbH & Co. KG , Huawei Technologies Co. Ltd.   Q14/15, Q12/15   2014-03-10
[ 661 ]  
 
Operation of One-Stage ODU SMP Protocols over B100G links     Huawei Technologies Co. Ltd. , Infinera Corporation   Q9/15   2014-03-10
[ 639 ]  
(Rev.1) 
Synchronization over OTN network     Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2014-03-10
[ 638 ]  
 
Test error of PRTC of G.8272     Huawei Technologies Co. Ltd.   Q13/15   2014-03-10
[ 637 ]  
 
Proposals for G.8275.1     Huawei Technologies Co. Ltd.   Q13/15   2014-03-10
[ 636 ]  
(Rev.1) 
Effect of lower network limit on PTP slave clock     Huawei Technologies Co. Ltd. , Orange   Q13/15   2014-03-10
[ 635 ]  
 
SyncE transient measurement method for G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2014-03-10
[ 634 ]  
 
Consideration of second-order filtering of T-BC for output transient due to SyncE rearrangement, plus several corrections for Appendix II/G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2014-03-10
[ 633 ]  
 
Physical layer frequency to PTP noise transfer gain peaking in G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2014-03-10
[ 632 ]  
 
Initial Results for Dynamic Time Error MTIE and TDEV at G.8271.1 Reference Point C     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2014-03-10
[ 631 ]  
 
Proposal on 21 hops of G.8271.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2014-03-10
[ 630 ]  
 
Proposal for Revision of Rec. L.53     Huawei Technologies Co. Ltd.   Q17/15   2014-03-10
[ 629 ]  
 
Proposal for Appendix I of L.53     Huawei Technologies Co. Ltd.   Q17/15   2014-03-10
[ 628 ]  
 
Proposal for studying intelligent node elements in optical fibre networks     China , China Mobile Communications Corporation , China Telecommunications Corporation , China Unicom , FiberHome Technologies Group , Huawei Technologies Co. Ltd. , ZTE Corporation   Q16/15   2014-03-10
[ 623 ]  
(Rev.1) 
1-stage and 2-stage Re-definition in ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 622 ]  
 
Message Encoding Set Update for ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 621 ]  
 
1-stage ODU SMP Protocol     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 620 ]  
(Rev.1) 
APS Mechanisms in ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 619 ]  
 
Proposed functional models in MDSP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 618 ]  
 
Interconnection solution for Ethernet linear protection in MDSP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 617 ]  
 
Discussion on the scope of potential G.metro Recommendation     Huawei Technologies Co. Ltd.   Q6/15   2014-03-10
[ 616 ]  
 
Discussion on the minimum SMSR for 100G applications in G.698.2     Huawei Technologies Co. Ltd.   Q6/15   2014-03-10
[ 615 ]  
 
Proposal of power budget update in G.973     Huawei Technologies Co. Ltd.   Q8/15   2014-03-10
[ 614 ]  
 
G.hn: Proposal for seamless domain merging procedure     Huawei Technologies Co. Ltd.   Q18/15   2014-03-10
[ 613 ]  
 
G.hn: Proposal for handover procedure of SC function     Huawei Technologies Co. Ltd.   Q18/15   2014-03-10
[ 612 ]  
 
G.hn: Text proposal for SC re-establishment procedure in G.hn     Huawei Technologies Co. Ltd.   Q18/15   2014-03-10
[ 586 ]  
 
Proposal for time synchronization requirements     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q2/15, Q13/15   2014-03-10
[ 541 ]  
 
Performance analysis of OTUC4 and OTLC4.16 frame alignment     China Unicom , Huawei Technologies Co. Ltd.   Q11/15   2014-03-09
[ 540 ]  
 
Logical lane format of OTUCn without FEC     Huawei Technologies Co. Ltd.   Q11/15   2014-03-09
[ 539 ]  
 
FEC options of OTUCn     Huawei Technologies Co. Ltd.   Q11/15   2014-03-09
[ 538 ]  
 
Proposed mapping for new FC and IB client signals     Huawei Technologies Co. Ltd.   Q11/15   2014-03-09
[ 537 ]  
 
Proposal for OTUCn, ODUCn and OPUCn Payload bit rates     China Telecommunications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2014-03-09
[ 536 ]  
 
B100G FEC and logical lane considerations     China Mobile Communications Corporation , China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q11/15   2014-03-09
[ 535 ]  
 
B100G extension of G.709 and G.798     Huawei Technologies Co. Ltd.   Q11/15   2014-03-09
[ 534 ]  
 
Proposed text for optical layer overhead clauses 15, 15.1, 15.4 and 15.5     Huawei Technologies Co. Ltd.   Q11/15   2014-03-09
[ 533 ]  
 
Optical layer overhead considerations and proposal for OTN B100G     Coriant GmbH & Co. KG , Huawei Technologies Co. Ltd. , ZTE Corporation   Q6/15, Q11/15   2014-03-09
Results:61 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-26