International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2014-03-24 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2014-03-24) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2014-03-24 to 2014-04-04

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2013-12-06  2013-07-01  2013-02-01 

Results:337 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 627 ]  
 
G.8263 Appendix I - Flicker/gamma equation formatting fixes     Microsemi   Q13/15   2014-03-10
[ 626 ]  
 
G8263 Appendix I - TDEV illustrating flicker load     Microsemi   Q13/15   2014-03-10
[ 625 ]  
 
Two-way metric Offset Max     Microsemi   Q13/15   2014-03-10
[ 624 ]  
 
Framework for Temperature Performance     Microsemi   Q13/15   2014-03-10
[ 623 ]  
(Rev.1) 
1-stage and 2-stage Re-definition in ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 622 ]  
 
Message Encoding Set Update for ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 621 ]  
 
1-stage ODU SMP Protocol     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 620 ]  
(Rev.1) 
APS Mechanisms in ODU SMP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 619 ]  
 
Proposed functional models in MDSP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 618 ]  
 
Interconnection solution for Ethernet linear protection in MDSP     Huawei Technologies Co. Ltd.   Q9/15   2014-03-10
[ 617 ]  
 
Discussion on the scope of potential G.metro Recommendation     Huawei Technologies Co. Ltd.   Q6/15   2014-03-10
[ 616 ]  
 
Discussion on the minimum SMSR for 100G applications in G.698.2     Huawei Technologies Co. Ltd.   Q6/15   2014-03-10
[ 615 ]  
 
Proposal of power budget update in G.973     Huawei Technologies Co. Ltd.   Q8/15   2014-03-10
[ 614 ]  
 
G.hn: Proposal for seamless domain merging procedure     Huawei Technologies Co. Ltd.   Q18/15   2014-03-10
[ 613 ]  
 
G.hn: Proposal for handover procedure of SC function     Huawei Technologies Co. Ltd.   Q18/15   2014-03-10
[ 612 ]  
 
G.hn: Text proposal for SC re-establishment procedure in G.hn     Huawei Technologies Co. Ltd.   Q18/15   2014-03-10
[ 611 ]  
 
Spectral excursion for 100Gb/s DP-QPSK modulation format in G.698.2     Alcatel-Lucent France   Q6/15   2014-03-10
[ 610 ]  
 
Draft New Recommendation G.8152: Protocol-neutral management information model for the MPLS-TP network element, version 0.08     Deutsche Telekom AG   Q14/15   2014-03-10
[ 609 ]  
 
NE Phase/Time Synchronization Supply Management     Deutsche Telekom AG   Q14/15, Q13/15   2014-03-10
[ 608 ]  
 
Comments to Recommendation G.8121 (11/2013)     Deutsche Telekom AG   Q14/15, Q10/15   2014-03-10
[ 607 ]  
 
IPR statement.     Sckipio Technologies S.I. Ltd.   Q4/15   2014-03-10
[ 606 ]  
 
Threshold Profile Management for OTN     Deutsche Telekom AG   Q14/15   2014-03-10
[ 605 ]  
 
Proposed corrections to the performance management functions in G.874 Amd 2     Deutsche Telekom AG   Q14/15   2014-03-10
[ 604 ]  
 
Considerations on control plane derived from G.8080 for G.ODUSMP     China Unicom   Q9/15   2014-03-10
[ 603 ]  
 
Proposal on fundamental visor and virtualization in soft-defined transport network     China Unicom   Q14/15, Q12/15   2014-03-10
[ 602 ]  
 
Reusing PON-ID as TWDM channel ID     Futurewei Technologies US R&D Center   Q2/15   2014-03-10
[ 601 ]  
 
T-BC Performance with/without SyncE [G.8273.2]     Vitesse Semiconductor Corporation   Q13/15   2014-03-10
[ 600 ]  
 
Comments to Feb 2014 Q2 interim document "D33_G.989.3-Tuning-States-20140218-VZ-ZTE-HIT-MIT-OKI-NTT_r2"     Futurewei Technologies US R&D Center   Q2/15   2014-03-10
[ 599 ]  
 
G.8273.2: T-TSC Specification     Calnex Solutions Limited   Q13/15   2014-03-10
[ 598 ]  
 
G.8273.2: 1pps Performance Requirements     Calnex Solutions Limited   Q13/15   2014-03-10
[ 597 ]  
 
G.8273.2: Noise Generation     Calnex Solutions Limited   Q13/15   2014-03-10
[ 596 ]  
 
G.8273 Annex A Equations     Calnex Solutions Limited   Q13/15   2014-03-10
[ 595 ]  
 
G.8271.1: MTIE Limit for Dynamic Time Error     Calnex Solutions Limited   Q13/15   2014-03-10
[ 594 ]  
 
G.8262: Jitter for Multilane, 40G and 100G Interfaces     Calnex Solutions Limited   Q13/15   2014-03-10
[ 593 ]  
 
G.8260: Definitions of Dynamic Time Error and Maximum Time Error     Calnex Solutions Limited   Q13/15   2014-03-10
[ 592 ]  
 
T-BC Time/phase noise generation [G.8273.2, G.8271.1]     Vitesse Semiconductor Corporation   Q13/15   2014-03-10
[ 591 ]  
 
Proposal of a text of non-linear effects compensation in G.sup39     Fujitsu Limited   Q6/15   2014-03-10
[ 590 ]  
 
Symbol Braided FEC for OTU4 & Beyond 100G Multi Vendor IaDI & Beyond 100G IrDI (Blacklink)     Xilinx Incorporation   Q6/15, Q11/15   2014-03-10
[ 589 ]  
 
Proposed enhancements to G.671 and G.672 to accommodate flexible grid elements     Finisar Corporation   Q7/15   2014-03-10
[ 588 ]  
 
G.hn: MPDU priority when including fragments of LLC frames     Marvell Semiconductor Inc.   Q18/15   2014-03-10
[ 587 ]  
 
Initial measurement data for the proposed 4L1-9D1F EML application code in G.959.1     Finisar Corporation   Q6/15   2014-03-10
[ 586 ]  
 
Proposal for time synchronization requirements     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q2/15, Q13/15   2014-03-10
[ 585 ]  
 
Considerations of Error decorrelator for 100G and beyond FEC     Broadcom Corporation , ZTE Corporation   Q11/15   2014-03-10
[ 584 ]  
 
Proposal about SMSR parameter for advanced modulation formats in ITU-T G.698.2     China Unicom , Ministry of Industry and Information Technology (MIIT) , ZTE Corporation   Q6/15   2014-03-10
[ 583 ]  
 
Consideration about Spectral Excursion in G.698.2     ZTE Corporation , Ministry of Industry and Information Technology (MIIT)   Q6/15   2014-03-10
[ 582 ]  
 
Proposal on B100G OTN mapping and multiplexing structure     KDDI Corporation   Q11/15   2014-03-10
[ 581 ]  
 
Considerations about the EVM     China Unicom , ZTE Corporation   Q6/15   2014-03-10
[ 580 ]  
 
Consideration about a requirement for consistency of switching action in G.mdsp     ZTE Corporation   Q9/15   2014-03-10
[ 579 ]  
 
A proposed protection mechanism for a failure use case in G.MDSP     ZTE Corporation   Q9/15   2014-03-10
[ 578 ]  
 
G.fast: Comments on link-state transition     ZTE Corporation   Q4/15   2014-03-10
Results:337 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25