International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Temporary Documents  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  TD-WP3 (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  [ 2013-07-01 ]  2013-02-01 

Results:26 total items.
Temporary Documents  (WP3)  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 82-WP3 ]  
 
Guidance for making and updating terms and definitions within WP3/15 Recommendations     Rapporteur Q3/15   Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2013-07-10
[ 74-WP3 ]  
(Rev.1) 
Agenda of the WP3/15 meeting (Geneva, July 2013)     Chairman WP3/15   Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2013-06-30
[ 69-WP3 ]  
 
WP3/15 interim activities     Chairman WP3/15   Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2013-06-27
[ 68-WP3 ]  
 
WP3/15 Liaison Statements     Chairman WP3/15   Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2013-06-27
[ 67-WP3 ]  
 
WP3/15 status of Recommendations     Chairman WP3/15   Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2013-06-27
[ 66-WP3 ]  
 
WP3/15 texts for Approval, Determination, Consent and Agreement     Chairman WP3/15   Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2013-06-27
[ 65-WP3 ]  
 
WP3/15 meeting report - Transport aspects of access, home and smart grid networks (Geneva, 1-12 July 2013)     Chairman WP3/15   Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2013-06-27
[ 63-WP3 ]  
 
Simulations of Transport of Time over Packet Networks: Latest draft     Editor G.supp   Q13/15   2013-06-27
[ 62-WP3 ]  
(Rev.1) 
Agenda of the Q13/15 meeting (Geneva, July 2013)     Rapporteur Q13/15   Q13/15   2013-06-26
[ 58-WP3 ]  
 
LS/i/r on performance during network failure (LS 033 / R4-132893) [from 3GPP TSG RAN]     3GPP TSG RAN   Q13/15   2013-06-17
[ 57-WP3 ]  
 
G.8260: Living list     Editor G.8260   Q13/15   2013-06-12
[ 56-WP3 ]  
 
G.8271/Y.1366 and G.8271.1/Y.1366.1: Living list     Editor G.8271/Y.1366   Q13/15   2013-06-12
[ 55-WP3 ]  
 
G.8273/Y.1368: Living list     Editor G.8273/Y.1368   Q13/15   2013-06-12
[ 54-WP3 ]  
 
G.8273.3/Y.1368.3: Living list     Editor G.8273.3/Y.1368.3   Q13/15   2013-06-12
[ 53-WP3 ]  
 
G.8273.2/Y.1368.2: Living list     Editor G.8273.2/Y.1368.2   Q13/15   2013-06-12
[ 52-WP3 ]  
 
G.8273.1/Y.1368.1: Living list     Editor G.8273.1/Y.1368.1   Q13/15   2013-06-12
[ 51-WP3 ]  
 
G.8263/Y.1363: Draft amendment input for Appendix I (Packet Delay Variation Noise Tolerance testing)     Editor G.8263/Y.1363   Q13/15   2013-06-12
[ 50-WP3 ]  
 
G.8263/Y.1363: Living list     Editor G.8263/Y.1363   Q13/15   2013-06-12
[ 40-WP3 ]  
 
LS/i/r on New Performance Metric status (reply to COM 15-LS025)     MEF   Q13/15   2013-04-30
[ 39-WP3 ]  
 
LS/i on time/phase synchronization aspects of MEF 22.2 Mobile Backhaul Implementation Agreement Phase 3     MEFf   Q13/15   2013-04-30
[ 33-WP3 ]  
 
LS/i on continuing work on Recommendations ITU-R TF.686-2 and ITU-R TF.460-6     ITU-R SG7   Q3/15, Q13/15   2013-04-22
[ 32-WP3 ]  
 
Q13/15 interim meeting report (San Jose, 8-12 April 2013)     Rapporteur Q13/15   Q13/15   2013-04-17
[ 28-WP3 ]  
 
Q13/15 interim meeting report (Paris, 21-25 January 2013)     Rapporteur Q13/15   Q13/15   2013-04-02
[ 19-WP3 ]  
+Add.1 
LS/i: Approved Draft #3 for Service Activation Testing Technical Specification     MEF   Q9/15, Q13/15, Q10/15   2013-02-06
[ 6-WP3 ]  
 
LS/i/r: Liaison Response to ITU-T Study Group 15 Question 13 from IEEE 802.1 (re: OLS 443)     IEEE 802.1   Q13/15   2012-12-19
[ 3-WP3 ]  
 
LS/i: Liaison from MEF requesting information on SG15 Q13 work on Packet Delay Variation in networks that support distribution of frequency synchronization over packet networks     MEF   Q13/15   2012-12-19
Results:26 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-23