International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 15 : Meeting 2013-07-01 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 15  C (2013-07-01) 

ITU-T SG 15

Networks, Technologies and Infrastructures for Transport, Access and Home

Study Period 2013

Meeting  from 2013-07-01 to 2013-07-12

held in Switzerland [Geneva]

Other Meetings : 2016-09-19  2016-02-15  2015-06-22  2014-11-24  2014-03-24  2013-12-06  2013-02-01 

Results:87 total items.
Result page:  1 - 2  - Next Next
Contributions  [ AI/Question: Q13/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 440 ]  
 
clockClass usage in G.8275.1     Orange   Q13/15   2013-06-19
[ 425 ]  
 
Priority1 parameter and Domain number in G.8275.1     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2013-06-18
[ 424 ]  
 
G.8261.1: PDV Network Limit     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2013-06-18
[ 423 ]  
 
Clock classes and selection algorithm in G.8275.1     Nokia Siemens Networks GmbH & Co. KG   Q13/15   2013-06-18
[ 412 ]  
 
Way forward on PDV network limits in G.8261.1     Orange   Q13/15   2013-06-18
[ 411 ]  
 
Updated text for the new Appendix "Evaluation of the Packet Delay Variation generation and asymmetry in a network node" in G.8261.1     Orange   Q13/15   2013-06-18
[ 409 ]  
 
PTP attributes values in G.8275.1     Orange   Q13/15   2013-06-18
[ 408 ]  
 
Text for Annex A of G.8275.1     Orange   Q13/15   2013-06-18
[ 407 ]  
 
Phase/time network limits in G.8271.1     Orange   Q13/15   2013-06-18
[ 382 ]  
 
FPP metric informal correspondence - Summary, further results and proposal for Study Point 3     Calnex Solutions Limited , RAD Data Communications, Ltd.   Q13/15   2013-06-18
[ 381 ]  
 
FPP metric informal correspondence - Summary and proposal for Study Point 1     Calnex Solutions Limited , RAD Data Communications, Ltd.   Q13/15   2013-06-18
[ 380 ]  
 
FPP metric informal correspondence - Summary and proposal on the Agreements     Calnex Solutions Limited , RAD Data Communications, Ltd.   Q13/15   2013-06-18
[ 361 ]  
 
Complementary data for reroute detection mechanisms     ADVA Optical Networking   Q13/15   2013-06-18
[ 360 ]  
 
Signalling TLV for distribution of timing information     ADVA Optical Networking   Q13/15   2013-06-18
[ 359 ]  
 
Self Monitoring Synchronization Network Comprised Of Probing Master/BC Nodes     ADVA Optical Networking   Q13/15   2013-06-18
[ 358 ]  
 
Concerns about Packet Delay Variation Noise Tolerance testing - G.8263 Appendix I     ADVA Optical Networking   Q13/15   2013-06-18
[ 357 ]  
 
Alternative Packet Delay Variation Noise Tolerance testing - G.8263 Appendix I     ADVA Optical Networking   Q13/15   2013-06-18
[ 355 ]  
 
Method for estimation Gamma distribution parameters based on FPP and Maximal Delay.     ADVA Optical Networking   Q13/15   2013-06-18
[ 329 ]  
 
Proposed amendment material for G.8251 on OTU3.4 jitter     PMC-Sierra, Inc.   Q13/15   2013-06-18
[ 325 ]  
 
Text for Annex B of G.8273     Ixia   Q13/15   2013-06-18
[ 322 ]  
 
Summary Text for G.8273 Annex A: Clause A.1     Ixia   Q13/15   2013-06-18
[ 321 ]  
 
Summary Text for G.8273 Annex A: Clause A.2 through A.5     Ixia   Q13/15   2013-06-18
[ 316 ]  
 
Text for Annex A of G.8273 section A.1.2     Ixia   Q13/15   2013-06-18
[ 315 ]  
 
Text for Annex A of G.8273 section A.1.x     Ixia   Q13/15   2013-06-18
[ 314 ]  
 
Text for Annex A of G.8273 section A.1     Ixia   Q13/15   2013-06-18
[ 313 ]  
 
Further discussion regarding definition of "floor" in time-transfer application     Ixia , Symmetricom   Q13/15   2013-06-18
[ 312 ]  
 
Discussion regarding definition of "floor" in time-transfer application     Ixia , Symmetricom   Q13/15   2013-06-18
[ 311 ]  
 
Analysis of Cluster-width and packet-selection window interaction     Ixia   Q13/15   2013-06-18
[ 310 ]  
 
Normal operation of telecom-grade network elements for supporting packet-based timing     Ixia   Q13/15   2013-06-18
[ 309 ]  
 
Figures for measurement of combined (PRTC+T-GM)     Ixia   Q13/15   2013-06-18
[ 308 ]  
 
Network Limit at Reference points C and D in G.8271.1     Ixia   Q13/15   2013-06-18
[ 302 ]  
 
G.8275.1: Clarification on the contents of Announce Messages     Juniper Networks   Q13/15   2013-06-17
[ 301 ]  
 
G.8273.2: Packet Selection for T-BCs and T-TSCs for PTP Time/Phase Profiles     Juniper Networks   Q13/15   2013-06-17
[ 296 ]  
 
Revision of network limits in G.8271.1     Calnex Solutions Limited , Huawei Technologies Co. Ltd. , Telefon AB - LM Ericsson   Q13/15   2013-06-17
[ 295 ]  
(Rev.1) 
Mitigation of time error due to SyncE transients in G.8273.2     Telefon AB - LM Ericsson   Q13/15   2013-06-17
[ 294 ]  
 
Coexistence of different profiles in G.8275     Telefon AB - LM Ericsson   Q13/15   2013-06-17
[ 284 ]  
(Rev.1) 
Q13/15 Synchronization Requirements Structure     Deutsche Telekom AG   Q13/15   2013-06-17
[ 275 ]  
 
Re-arrangement times for G.8271.1 HRM topologies     Alcatel-Lucent USA Inc. , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 274 ]  
 
Development of Slave Clock Specifications for Different Use Cases     Sprint   Q13/15   2013-06-17
[ 272 ]  
(Rev.1) 
Service Requirements for Manageable Synchronization Infrastructure     Alcatel-Lucent USA Inc. , Sprint   Q13/15   2013-06-17
[ 259 ]  
 
G.8271.1 Appendix VI modifications for cTE classes [G.8271.1]     Vitesse Semiconductor Corporation   Q13/15   2013-06-17
[ 258 ]  
 
PTP Equipment Classification [G.8273.2, G.8273, G.8271.1]     Cisco Systems, Inc. , Vitesse Semiconductor Corporation   Q13/15   2013-06-17
[ 253 ]  
 
Static noise generation of G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
[ 252 ]  
 
Delay_Req Transmission Requirements in G.8275.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 251 ]  
 
Proposals for G.8275.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 250 ]  
 
Proposal for default value for offsetScaledLogVariance, for G.8275.1     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 249 ]  
 
Discussion of Noise Tolerance in G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 248 ]  
 
Proposal for Time Noise Transfer in G.8273.2     China Mobile Communications Corporation , Huawei Technologies Co. Ltd. , Orange   Q13/15   2013-06-17
[ 247 ]  
 
Proposed Text for Method 3 of G.8263-Testing     Calnex Solutions Limited , Huawei Technologies Co. Ltd. , Nokia Siemens Networks GmbH & Co. KG , Orange   Q13/15   2013-06-17
[ 246 ]  
 
Proposed Correction to Annex C of ITU-T Rec. O.172     Huawei Technologies Co. Ltd.   Q13/15   2013-06-17
Results:87 total items.
Result page:  1 - 2  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-16