International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : Meeting 2015-12-02 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  C (2015-12-02) 

ITU-T SG 11

Protocols and test specifications

Study Period 2013

Meeting  from 2015-12-02 to 2015-12-11

held in Switzerland [Geneva]

Other Meetings : 2016-06-27  2016-04-29  2016-03-24  2015-04-22  2014-11-21  2014-07-09  2014-02-21  2013-11-14  2013-11-07  2013-06-21  2013-02-25 

Results:137 total items.
Result page:  Previous -  1 - 2 - 3
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 313 ]  
(Rev.1) 
Modification of Chaper 7.5 for Q. BNG Pool     China Unicom , Huawei Technologies Co., Ltd.   Q5/11   2015-11-18
[ 312 ]  
(Rev.1) 
Modification of Chaper 7.4 for Q. BNG Pool     China Unicom , Huawei Technologies Co., Ltd.   Q5/11   2015-11-18
[ 311 ]  
(Rev.1) 
Modification of Chaper 7.3 for Q. BNG Pool     China Unicom , Huawei Technologies Co., Ltd.   Q5/11   2015-11-18
[ 310 ]  
(Rev.1) 
Modification of Chaper 7.2 for Q. BNG Pool     China Unicom , Huawei Technologies Co., Ltd.   Q5/11   2015-11-18
[ 309 ]  
(Rev.1) 
Modification of Chaper 7.1 for Q. BNG Pool     China Unicom , Huawei Technologies Co., Ltd.   Q5/11   2015-11-18
[ 308 ]  
 
Proposal to extend/enhance/introduce protocol capabilities in case of heterogeneous network environment to support priority calling     Ministry of Communications and Information Technology Dept. of T   Q3/11   2015-11-18
[ 307 ]  
(Rev.1) 
Proposed updates of ToR of Q9/11 for the next study period     Korea (Rep. of)   Q9/11   2015-11-18
[ 306 ]  
 
Proposal for new work item on "Managed P2P communications: Multimedia streaming signalling requirements"     Korea (Rep. of)   Q9/11   2015-11-18
[ 305 ]  
 
Proposal to start a new draft Recommendation for signalling requirements of SDN-based access networks with media independent management capabilities     Korea (Rep. of)   Q7/11   2015-11-18
[ 304 ]  
 
X.mp2p-pamp: Proposed modifications from clause 2 to clause 8     Electronics and Telecommunications Research Institute (ETRI)   Q9/11   2015-11-18
[ 303 ]  
(Rev.1) 
X.mp2p-orcp: Proposed modifications from clause 1 to clause 6     Electronics and Telecommunications Research Institute (ETRI)   Q9/11   2015-11-18
[ 302 ]  
 
X.mp2p-pamp: Proposed modifications for clause 9     Electronics and Telecommunications Research Institute (ETRI)   Q9/11   2015-11-18
[ 301 ]  
 
Proposal for a baseline text of the procedure for appointing a conformity assessment ITU-T technical expert     Ghana   CASC/11   2015-11-17
[ 300 ]  
 
Proposal for interface requirements in draft Q.PVMapping     China Unicom , Huawei Technologies Co., Ltd.   Q4/11   2015-11-17
[ 299 ]  
 
Proposal for modifications and addition on Summary, Definition, Conventions, and other related clauses in draft Q.PVMapping     China Unicom , Huawei Technologies Co., Ltd.   Q4/11   2015-11-17
[ 298 ]  
 
Proposal for adding new clause on overview of PVMapping in draft Q.PVMapping     China Unicom , Huawei Technologies Co., Ltd.   Q4/11   2015-11-17
[ 297 ]  
 
Proposal for content of chapter 7.1 in Q.IPv6ProBB     Ministry of Industry and Information Technology (MIIT)   Q6/11   2015-11-17
[ 296 ]  
 
Proposal for security consideration in Q.IPv6ProMM     Ministry of Industry and Information Technology (MIIT)   Q6/11   2015-11-17
[ 295 ]  
 
Proposal for adding cloud computing interoperability testing methodology in draft Recommendation Q.fw.cloud.iop     China Telecommunications Corporation   Q14/11   2015-11-16
[ 294 ]  
 
Proposal on description related to cloud computing interfaces in draft Recommendation Q.fw.cloud.iop     China Telecommunications Corporation   Q14/11   2015-11-16
[ 293 ]  
 
Proposal to remove Cloud service measurement index in draft Recommendation Q.FW.cloud.iop     China Telecommunications Corporation   Q14/11   2015-11-16
[ 292 ]  
 
Proposal to update overview of Cloud Computing interoperability testing in draft Recommendation FW.cloud.iop     China Telecommunications Corporation   Q14/11   2015-11-16
[ 291 ]  
 
The proposals for service performance parameters of Q.CCP     China Telecommunications Corporation   Q13/11   2015-11-13
[ 290 ]  
 
The proposals for service availability parameters of Q.CCP     China Telecommunications Corporation   Q13/11   2015-11-13
[ 289 ]  
 
The proposals for parameters of resources operating and controlling of Q.CCP     China Telecommunications Corporation   Q13/11   2015-11-13
[ 288 ]  
 
The proposals for monitoring parameters of network of Q.CCP     China Telecommunications Corporation   Q13/11   2015-11-13
[ 287 ]  
 
The proposals for parameters of virtual resources of Q.CCP     China Telecommunications Corporation   Q13/11   2015-11-13
[ 286 ]  
 
The proposals for parameters of physical resources of Q.CCP     China Telecommunications Corporation   Q13/11   2015-11-13
[ 285 ]  
(Rev.1) 
Proposal to advance the draft Recommendation ITU-T Q.MNP_TS "Conformance test plan for Number Portability requirements defined by ITU-T Q.Suppl.4"     Ministry of Telecom and Mass Communications of the Russian Federation   Q11/11   2015-11-12
[ 284 ]  
 
Update to Q.CSO     Huawei Technologies Co., Ltd.   Q4/11   2015-11-10
[ 283 ]  
(Rev.1) 
Consent - draft new Recommendation ITU-T Q.39_SI_BC_Net_TS_Part2 v.1 [3GPP Release 10] "IMS specific use of SIP and SDP. Conformance testing. Part 2: TSS and TP"     A1 Telekom Austria AG   Q11/11   2015-11-09
[ 282 ]  
(Rev.1) 
Consent - draft new Recommendation ITU-T Q.39_SI_BC_Net_TS_Part1 V.1 [3GPP Release 10] "IMS specific use of SIP and SDP. Conformance testing. Part 1: PICS"     A1 Telekom Austria AG   Q11/11   2015-11-09
[ 281 ]  
(Rev.1) 
Consent - Draft new Recommendation ITU-T Q.34_SI_BC_Req v.1 [3GPP Release 10] "IP multimedia call control protocol based on the session initiation protocol and the session description protocol. Basic call. Requirements for user side and network side (V10.20.0)"     A1 Telekom Austria AG   Q2/11   2015-11-09
[ 280 ]  
(Rev.1) 
Contribution-Propose to add signalling requirements for Southbound Interface in Q.SBAN     China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Q4/11   2015-11-06
[ 279 ]  
(Rev.1) 
Contribution-Propose to add overview of signalling requirements in Q.SBAN     China Telecommunications Corporation , Huawei Technologies Co., Ltd.   Q4/11   2015-11-06
[ 278 ]  
(Rev.1) 
Proposals on Study on Counterfeit, Substandard and Unauthorised ICT devices in Africa Region     Ministry of Communication and ICT, Benin   Q8/11   2015-10-26
[ 277 ]  
 
Information on combating counterfeit equipment in Guinea     Ministère Postes et Télécom; Guinée   Q8/11   2015-10-26
Results:137 total items.
Result page:  Previous -  1 - 2 - 3  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-24