International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 11 : Meeting 2015-04-22 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 11  C (2015-04-22) 

ITU-T SG 11

Protocols and test specifications

Study Period 2013

Meeting  from 2015-04-22 to 2015-04-29

held in Switzerland [Geneva]

Other Meetings : 2016-06-27  2016-04-29  2016-03-24  2015-12-02  2014-11-21  2014-07-09  2014-02-21  2013-11-14  2013-11-07  2013-06-21  2013-02-25 

Results:17 total items.
Contributions  [ AI/Question: Q11/11 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 258 ]  
 
Proposal to start a new work item (Q.3941.1-rev [3GPP Release 10]) aiming to revise ITU-T Q.3941.1 "Network integration testing between SIP and ISDN/PSTN network signalling protocols - Part 1: Test suite structure and test purposes for SIP-ISDN)"     A1 Telekom Austria AG   Q11/11   2015-04-09
[ 257 ]  
 
Proposal for a baseline text for draft revised ITU-T Q.3941.1-rev [3GPP Release 10] "Network integration testing between SIP and ISDN/PSTN network signalling protocols - Part 1: Test suite structure and test purposes for SIP-ISDN)"     A1 Telekom Austria AG   Q11/11   2015-04-09
[ 240 ]  
 
Draft Recommendation ITU-T Q Series «Conformance test plan for Number Portability requirements defined by ITU-T Q.Suppl.4»     Ministry of Telecom and Mass Communications of the Russian Feder   Q11/11   2015-04-07
[ 219 ]  
 
Presentation of SIP-IMS conformance testing standardization work plan     A1 Telekom Austria AG   Q2/11, Q11/11   2015-03-23
[ 218 ]  
 
Proposal for a SIP-IMS conformance testing standardization work plan     A1 Telekom Austria AG   Q2/11, Q11/11   2015-03-23
[ 193 ]  
 
Proposal to start a new work item: Q.39_SI_BC_Net_TS_Part3 V.1 [3GPP Release 10] "IMS specific use of SIP and SDP. Conformance testing. Part 3: ATS and PIXIT"     A1 Telekom Austria AG   Q11/11   2015-03-20
[ 192 ]  
 
Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_BC_Net_TS_Part3 v.1 [3GPP Release 10] "IMS specific use of SIP and SDP. Conformance testing. Part 3: ATS and PIXIT"     A1 Telekom Austria AG   Q11/11   2015-03-20
[ 191 ]  
 
Proposal to change ITU-T Q.IMS-Network-side-Confor.-Basic-Call-TSS&TP-Rel.10 (ex Q.39yy.2) to Q.39_SI_BC_Net_TS_Part2 V.1 [3GPP Release 10] "IMS specific use of SIP and SDP. Conformance testing. Part 2: TSS and TP"     A1 Telekom Austria AG   Q11/11   2015-03-20
[ 190 ]  
(Rev.1) 
Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_BC_Net_TS_Part2 v.1 [3GPP Release 10] "IMS specific use of SIP and SDP. Conformance testing. Part 2: TSS and TP"     A1 Telekom Austria AG   Q11/11   2015-03-18
[ 188 ]  
(Rev.1) 
Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_BC_Net_TS_Part1 V.1 [3GPP Release 10] "IMS specific use of SIP and SDP. Conformance testing. Part 1: PICS"     A1 Telekom Austria AG   Q11/11   2015-03-16
[ 187 ]  
(Rev.1) 
Proposal to start a new work item: Q.39_SI_BC_Net_TS_Part1 V.1 [3GPP Release 10] "IMS specific use of SIP and SDP. Conformance testing. Part 1: PICS"     A1 Telekom Austria AG   Q11/11   2015-03-16
[ 181 ]  
(Rev.1) 
Proposal to start a new work item: Q.39_SI_BC_Req v.1 [3GPP Release 10] "IP multimedia call control protocol based on the session initiation protocol and the session description protocol. Basic call. Requirements for user side and network side (V10.18.0)"     A1 Telekom Austria AG   Q2/11, Q11/11   2015-03-12
[ 180 ]  
(Rev.1) 
Proposal for a baseline text for draft Recommendation ITU-T Q.39_SI_BC_Req v.1 [3GPP Release 10] "IP multimedia call control protocol based on the session initiation protocol and the session description protocol. Basic call. Requirements for user side and network side (V10.18.0)"     A1 Telekom Austria AG   Q2/11, Q11/11   2015-03-12
[ 179 ]  
(Rev.1) 
Proposal to update draft Recommendation ITU-T Q.3944.2 v.1 [3GPP Release 10] Communication HOLD (HOLD) using IP multimedia core network subsystem; Conformance Testing; Part 2: User side, TSS&TP" Conformance Testing; Part 2: User side, Test Suite Structure and Test Purposes (TSS&TP)"(based on TS 124 610 (3GPP Release 10)     A1 Telekom Austria AG , Deutsche Telekom AG   Q11/11   2015-03-10
[ 178 ]  
(Rev.1-2) 
Draft new Recommendation ITU-T Q.3944.1: "Communication HOLD (HOLD) using IP Multimedia (IM) Core Network (CN) subsystem; Proposal to update draft Recommendation ITU-T Q.3944.1 v.1 [3GPP Release 10] "Communication HOLD (HOLD) using IP multimedia core network subsystem; Conformance Testing. Part 1: Network side, User side, PICS"     A1 Telekom Austria AG , Deutsche Telekom AG   Q11/11   2015-03-09
[ 177 ]  
(Rev.1) 
Proposal to consent draft new Recommendation ITU-T Q.3942.3 v.1 [3GPP Release 10]     A1 Telekom Austria AG , Deutsche Telekom AG   Q11/11   2015-03-09
[ 176 ]  
(Rev.1) 
Proposal to consent draft new Recommendation ITU-T Q.3942.2 v.1 [3GPP Release 10]     A1 Telekom Austria AG , Deutsche Telekom AG   Q11/11   2015-03-09
Results:17 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25