International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 16 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 16  C 

ITU-T SG 16

Multimedia coding, systems and applications

Study Period 2009

Results:954 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 254 ]  
 
H.VSarch: Proposed modification architecture framework     ZTE   Q21/16   2009-10-16
[ 253 ]  
 
H.VSarch: Proposal on functional requirement of voice (audio) communication     ZTE   Q21/16   2009-10-16
[ 252 ]  
 
H.VSarch: Proposal on functional requirement of video surveillance     ZTE   Q21/16   2009-10-16
[ 251 ]  
 
H.VSarch: Proposal on functional requirement of audio acquisition     ZTE   Q21/16   2009-10-16
[ 250 ]  
 
H.IPTV-MAFR.6: Proposed modifications (ECMAScript for IPTV services)     NTT , Mitsubishi Electric   Q13/16   2009-10-15
[ 249 ]  
 
H.IPTV-MAFR.5: Proposed attributes and methods     NTT   Q13/16   2009-10-15
[ 248 ]  
 
H.IPTV-MAFR.13: Proposal for a minimum set of Attributes to be used with the Elements in the current draft     NTT   Q13/16   2009-10-15
[ 247 ]  
 
H.IPTV-DSMW: Proposed additional requirement on the delivery of multimedia content to the user     NEC , NTT   Q13/16   2009-10-15
[ 246 ]  
 
H.IPTV-WBTM: Proposed new clause 8 "WBTM for IPTV Services" and reference to H.721     NTT   Q13/16   2009-10-15
[ 245 ]  
 
Example usages of the basic operators for counting WMOPS     NTT   Q10/16   2009-10-15
[ 244 ]  
(Rev.1) 
Proposal for improving G.718 on the decoder side  
Rev. 1 contains the missing contact information.
 
Huawei Technologies   Q9/16, Q10/16   2009-10-15
[ 243 ]  
 
H.248 Sub-series IG: Proposed additions     Huawei Technologies   Q3/16   2009-10-15
[ 242 ]  
 
H.248.ALG: RTSP Example     Huawei Technologies , China Mobile   Q3/16   2009-10-15
[ 241 ]  
 
H.248.9: Updates     Huawei Technologies   Q3/16   2009-10-15
[ 240 ]  
 
H.248.74: Proposed updates     Huawei Technologies   Q3/16   2009-10-15
[ 239 ]  
 
H.248.73: Updates     Huawei Technologies   Q3/16   2009-10-15
[ 238 ]  
 
H.248.67: Encoding updates     Huawei Technologies   Q3/16   2009-10-15
[ 237 ]  
 
H.248.67: Clarifying the use of ServiceChangeReasons     Huawei Technologies   Q3/16   2009-10-15
[ 236 ]  
 
H.248.64: The use of H.248.43     Huawei Technologies   Q3/16   2009-10-15
[ 235 ]  
 
H.248.64: NAT Mapping Syntax     Huawei Technologies   Q3/16   2009-10-15
[ 234 ]  
 
H.248.64: Filter ordering     Huawei Technologies   Q3/16   2009-10-15
[ 233 ]  
 
H.248.64: Filter Error Detection     Huawei Technologies   Q3/16   2009-10-15
[ 232 ]  
 
H.248.50: Updates     Huawei Technologies   Q3/16   2009-10-15
[ 231 ]  
 
Proposed modifications to clause 7.3 of HSTP.IPTV-ISPF     NEC , NTT   Q13/16   2009-10-15
[ 230 ]  
 
Proposed addition of data schema for "service provider discovery" to H.IPTV-MDSD     NEC , NTT   Q13/16   2009-10-15
[ 229 ]  
 
Proposed additions of supplementary elements/attributes to H.IPTV-MDSD     NEC , NTT   Q13/16   2009-10-15
[ 228 ]  
 
Recommended course of action for EPVC     LM Ericsson , Nokia , Tandberg Telecom   Q6/16   2009-10-14
[ 227 ]  
+Add.1 
Massively Parallel CABAC Cross-Verification     Texas Instruments   Q6/16   2009-10-14
[ 226 ]  
 
Editorial comments on HSTP.IPTV-PITD     NEC , NTT   Q13/16   2009-10-14
[ 225 ]  
 
Proposed additions of requirements on HSTP.IPTV-ISPF     NEC , NTT   Q13/16   2009-10-14
[ 224 ]  
 
Editorial comments on HSTP.IPTV-ISPF     NEC , NTT   Q13/16   2009-10-14
[ 223 ]  
 
Proposed modifications to clause 7.4 of HSTP.IPTV-ISPF     NEC , NTT   Q13/16   2009-10-14
[ 222 ]  
 
Proposed modifications to clause 7.2 of HSTP.IPTV-ISPF     NEC , NTT   Q13/16   2009-10-14
[ 221 ]  
 
Proposal for joint team or question study on accessibility formal standardization issue     China Unicom   Q26/16   2009-10-14
[ 220 ]  
 
Proposal for approval of revised Appendix II to ITU-T G.160     Audience   Q16/16   2009-10-14
[ 219 ]  
 
Draft ITU-T Rec. V.153 (ex. V.IP2IP-VxF) - Note to clause I.4.2 Native mode     Alcatel-Lucent Deutschland , Alcatel-Lucent France , Alcatel-Lucent Shanghai Bell   Q14/16   2009-10-14
[ 218 ]  
 
Draft ITU-T Rec. V.153 (ex. V.IP2IP-VxF) - Update proposal for clause 12 "Synchronization of state transitioning"     Alcatel-Lucent Deutschland , Alcatel-Lucent France , Alcatel-Lucent Shanghai Bell   Q14/16   2009-10-14
[ 217 ]  
 
Draft ITU-T Rec. V.153 (ex. V.IP2IP-VxF) - Update proposal for clause 11 "Handling of stimuli between VBDoIP and FoIP"     Alcatel-Lucent Deutschland , Alcatel-Lucent France , Alcatel-Lucent Shanghai Bell   Q14/16   2009-10-14
[ 216 ]  
 
Draft ITU-T Rec. V.153 (ex. V.IP2IP-VxF) - Update proposal for clause 8.1 "T.30 procedures"     Alcatel-Lucent Deutschland , Alcatel-Lucent France , Alcatel-Lucent Shanghai Bell   Q14/16   2009-10-14
[ 215 ]  
 
Draft ITU-T Rec. V.153 (ex. V.IP2IP-VxF) - Texts proposals for Summary     Alcatel-Lucent Deutschland , Alcatel-Lucent France , Alcatel-Lucent Shanghai Bell   Q14/16   2009-10-14
[ 214 ]  
 
Draft ITU-T Rec. V.153 (ex. V.IP2IP-VxF) - Editorial update proposals     Alcatel-Lucent Deutschland , Alcatel-Lucent France , Alcatel-Lucent Shanghai Bell   Q14/16   2009-10-14
[ 213 ]  
 
H.248.1 E.12 - Clarification of statistic RTP package 'Delay' (rtp/delay)     Alcatel-Lucent Deutschland , Alcatel-Lucent Shanghai Bell   Q3/16   2009-10-14
[ 212 ]  
 
New work item H.248.BearerEncryption - "H.248-controlled IP connection endpoints with encryption"     Alcatel-Lucent Deutschland , Alcatel-Lucent Shanghai Bell   Q3/16   2009-10-14
[ 211 ]  
 
New work item H.248.BearerEncryption - Use cases for "network security" - Secured IP traffic     Alcatel-Lucent Deutschland , Alcatel-Lucent Shanghai Bell   Q3/16   2009-10-14
[ 210 ]  
 
New work item H.248.BearerEncryption - Use cases for "media security" - Secured RTP traffic     Alcatel-Lucent Deutschland , Alcatel-Lucent Shanghai Bell   Q3/16   2009-10-14
[ 209 ]  
 
Draft ITU-T Rec. H.248.48 "RTCP XR Block Reporting Package" - Editorial change proposals     Alcatel-Lucent Deutschland   Q3/16   2009-10-14
[ 208 ]  
 
H.248.67 - Clause 6.6.5 - Missing ServiceChange Reason values     Alcatel-Lucent Deutschland , Alcatel-Lucent Shanghai Bell   Q3/16   2009-10-14
[ 207 ]  
 
H.248.67 - Clause 1.2.1 - Update proposal     Alcatel-Lucent Deutschland , Alcatel-Lucent Shanghai Bell   Q3/16   2009-10-14
[ 206 ]  
 
H.248.64 - New Appendix II for "Survey of packages for IP router modes"     Alcatel-Lucent Deutschland , Alcatel-Lucent Shanghai Bell   Q3/16   2009-10-14
[ 205 ]  
 
H.248.64 - Editorial corrections     Alcatel-Lucent Deutschland , Alcatel-Lucent Shanghai Bell   Q3/16   2009-10-14
Results:954 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-05-01