International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:170 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Contributions  [ AI/Question: Q12/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1610 ]  
(Rev.1) 
Management of G.872 v2 (aon)     Ciena Corporation   Q14/15, Q12/15   2011-11-19
[ 1594 ]  
(Rev.1) 
Progress on G.8021.1     Ciena Corporation   Q9/15, Q12/15   2011-11-18
[ 1593 ]  
(Rev.1) 
Editing of G.8010 V2     Ciena Corporation   Q12/15   2011-11-18
[ 1592 ]  
(Rev.1) 
E-OTN work overlap among Questions     Ciena Corporation   Q9/15, Q12/15, Q10/15   2011-11-18
[ 1573 ]  
(Rev.1) 
Flexible Rate OTU signal     Finisar Corporation , Infinera Corporation , Verizon Communication Corporation   Q6/15, Q12/15, Q11/15   2011-11-18
[ 1568 ]  
 
Proposal and Comments on MPLS-TP     Cisco Systems, Inc. , Ericsson, Inc. , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-11-18
[ 1542 ]  
(Rev.1) 
G.8080 - SP10 - Call Routing Discussion     Ciena Canada   Q14/15, Q12/15   2011-11-17
[ 1527 ]  
(Rev.1-3) 
Standardization of optical switching (photonic sub-lambda switching)     France Télécom Orange , Portugal Telecom, SGPS, S.A. , Swisscom SA , Telecom Italia S.p.A. , Telefónica, S.A. , Telstra Corporation Ltd. , Verizon Communication Corporation   Q12/15   2011-11-15
[ 1518 ]  
 
Structuring of MPLS-TP Recommendations     Telefónica Investigación y Desarrollo   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-11
[ 1496 ]  
 
Multilayer SCN Issues     Ciena Corporation   Q14/15, Q12/15   2011-02-02
[ 1495 ]  
 
G.8080 - SP10 - call routing     Ciena Corporation   Q14/15, Q12/15   2011-02-02
[ 1494 ]  
 
G.8080 and multi-layer topology     Ciena Corporation   Q12/15   2011-02-02
[ 1491 ]  
 
Editing of G.8010 V2     Ciena Corporation   Q12/15   2011-02-02
[ 1468 ]  
 
Transitional Link attributes for optical transponders and 3R regenerators in the OTN     Alcatel-Lucent   Q14/15, Q12/15   2011-02-02
[ 1461 ]  
 
Withdrawn by TSB (duplicate): See C-1439, "Comments on differentiation of MPLS-TP applications"     NSN   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1449 ]  
 
Further consideration of requirements for on-demand segment monitoring in MPLS-TP     NTT , Telecom Italia   Q12/15, Q10/15   2011-02-02
[ 1448 ]  
 
Consideration and proposal for resolving issue of OAM solutions in MPLS-TP     NTT   Q12/15, Q10/15   2011-02-02
[ 1445 ]  
 
Adherence to In-Force Cooperation Agreements for the Development of MPLS-TP OAM Solutions     ISOC   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1441 ]  
 
Withdrawn: MPLS-TP Standards     BT   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1439 ]  
 
Comments on differentiation of MPLS-TP environments     NSN   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-02
[ 1396 ]  
 
Relation between G.aon and G.872     Deutsche Telekom   Q12/15   2011-02-01
[ 1395 ]  
 
WCh clients in draft G.aon     Deutsche Telekom   Q12/15   2011-02-01
[ 1394 ]  
 
Properties of a Wavelength Channel in draft G.aon     Deutsche Telekom   Q12/15   2011-02-01
[ 1385 ]  
 
Support for the consent of G.8110.1 and G.tpoam     Italy   Q12/15, Q10/15   2011-02-01
[ 1384 ]  
 
Structure and content of the MPLS-TP Recommendations     Telecom Italia   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1372 ]  
 
Withdrawn: Continued cooperation with IETF on MPLS for Transport Networks     Israel   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1370 ]  
 
Comments on working assumption at Berlin meeting and TD377 (wd31r1)     NSN , BT , Cisco , Ericsson , Juniper , Qwest , Telenor , Verizon   Q9/15, Q12/15, Q10/15   2011-02-01
[ 1362 ]  
 
Support for the consent of G.8110.1 and G.tpoam     SK Telecom , ETRI   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1361 ]  
 
Structure of the MPLS-TP Recommendations     SK Telecom , ETRI   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1346 ]  
 
Nested Restoration Domains - Data-plane maintenance overhead signals     Tellabs Oy   Q9/15, Q12/15, Q11/15   2011-02-01
[ 1324 ]  
 
Proposal to re-define the architectures for MPLS-TP linear protection     Fujitsu   Q9/15, Q12/15   2011-02-01
[ 1307 ]  
 
Associated Channel Type for G.tpoam     Portugal Telecom   Q12/15   2011-02-01
[ 1306 ]  
 
Support for the consent of G.8110.1 and G.tpoam     Portugal Telecom   Q12/15, Q10/15   2011-02-01
[ 1305 ]  
 
Procedural issues on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-02-01
[ 1303 ]  
 
Inter SDO Cooperation on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5   2011-02-01
[ 1301 ]  
 
Operator Requirements for MPLS-TP OAM     Verizon , BT , France Telecom Orange , Qwest , Telenor , Telstra   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1298 ]  
 
MPLS-TP OAM - issues with the proposed Y.1731 based OAM solution     Juniper Networks , Cisco , NSN , Verizon   Q9/15, Q14/15, Q12/15, Q10/15   2011-02-01
[ 1297 ]  
 
Considerations on G.800 style ETH transport processing functions in draft revised G.8010     Huawei , Deutsche Telekom   Q12/15   2011-02-01
[ 1296 ]  
 
G.800 server subnetwork and ETH server subnetwork definitions     Huawei , Deutsche Telekom   Q12/15   2011-02-01
[ 1295 ]  
 
Models in G.8010     Huawei , Deutsche Telekom   Q9/15, Q14/15, Q12/15   2011-02-01
[ 1285 ]  
 
Associated Channel Type for G.tpoam     WIND   Q12/15   2011-01-31
[ 1279 ]  
 
Consideration on TS sequence in HAO     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1258 ]  
 
Comments on the requirement of the same number of tributary slots on every link along a resizable ODUflex connection in G.hao     ZTE   Q14/15, Q12/15, Q11/15   2011-01-31
[ 1256 ]  
 
Requirement for communication latency as a traffic engineering performance metric in ASON     ZTE   Q14/15, Q12/15   2011-01-31
[ 1248 ]  
 
PTN GACh+Y.1731 OAM interoperability test activities and result     CATR , China Mobile   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1247 ]  
 
Support for the consent of G.8110.1 and G.tpoam     China MIIT   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1244 ]  
 
Support for the consent of G.8110.1     NEC , Fujitsu , Hitachi   Q12/15   2011-01-31
[ 1221 ]  
 
Comments on draft G.aon     Huawei   Q12/15   2011-01-31
[ 1220 ]  
 
G.800 Terminology Proposals     Huawei   Q12/15   2011-01-31
[ 1207 ]  
 
Support for consent of G.tpoam     ZTE , Alcatel-Lucent Shanghai Bell , Fiberhome , Huawei   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
Results:170 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-3-28