International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1990 ]  
 
OTUk-AIS Clarifications     Altera Newfoundland Technology Centre (Altera NTC)   Q9/15, Q11/15   2012-08-22
[ 1989 ]  
 
OTLAIS Removal from OTU AIS     Altera Newfoundland Technology Centre (Altera NTC)   Q9/15   2012-08-22
[ 1988 ]  
 
ODUkT_TT_Sk STAT Defect Conditions     Altera Newfoundland Technology Centre (Altera NTC)   Q9/15   2012-08-22
[ 1987 ]  
 
G.8272 latest draft editorial comments     Integrated Device Technology (IDT)   Q13/15   2012-08-22
[ 1986 ]  
 
G.8272 Summary     Integrated Device Technology (IDT)   Q13/15   2012-08-22
[ 1985 ]  
 
Time Error Budget to Allocate to Error Inside BC [G.8271 / G.8273.2]     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1984 ]  
 
Thoughts on Options for Syntonization of T-BC without SyncE / T-BC Models     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1983 ]  
 
Move Metrics from G.8261 to G.8260     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1982 ]  
 
Holdover Requirement [G.8263]     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1981 ]  
 
Temperature Profile Appendix [G.8263]     Microsemi Semiconductor Corporation   Q13/15   2012-08-22
[ 1980 ]  
 
Proposed Liaison on Control Plane and Data Plane     Ciena Canada   Q12/15   2012-08-22
[ 1979 ]  
 
Spectral excursion for advanced modulation formats in G.698.2     Ciena Canada   Q6/15   2012-08-22
[ 1978 ]  
 
Comments on G.8032 Supplement     Ericsson Canada, Inc.   Q9/15   2012-08-22
[ 1977 ]  
 
Comments on IEEE liaison on MECP     Ericsson Canada, Inc.   Q9/15   2012-08-22
[ 1976 ]  
 
Example of changes to G.8021 to support enhanced holdover     Ciena Canada   Q13/15   2012-08-22
[ 1975 ]  
 
Further considerations on PRTC modelling     Ciena Canada   Q13/15   2012-08-22
[ 1974 ]  
 
Proposal to start work on 40G and 100G applications for G.977 for Submarine Networks     Xtera Communications, Inc.   Q8/15   2012-08-22
[ 1973 ]  
 
Use of G.805 to model PRTC and BC clocks     Ciena Canada   Q13/15   2012-08-22
[ 1972 ]  
 
G.8113.2     Canada   Q10/15   2012-08-22
[ 1971 ]  
(Rev.1) 
Consolidation of G.873.1 and G.798 in respect to ODUk SNCP     Alcatel-Lucent Deutschland AG   Q9/15   2012-08-22
[ 1970 ]  
(Rev.1) 
Backward compatible precise delay measurement method for OTN     Alcatel-Lucent Deutschland AG   Q9/15, Q11/15   2012-08-22
[ 1969 ]  
 
G.873.1: Control of the Bridge for 1:N ODUk SNCP     Alcatel-Lucent Deutschland AG   Q9/15   2012-08-22
[ 1968 ]  
 
G.873.1: Bidirectional Switching for ODUk SNCP     Alcatel-Lucent Deutschland AG   Q9/15   2012-08-22
[ 1967 ]  
 
G.873.1: Usage of Reverse Request for bidirectional 1:n ODUk SNCP     Alcatel-Lucent Deutschland AG   Q9/15   2012-08-22
[ 1966 ]  
 
Proposed New G.smp Appendix     Alcatel-Lucent Deutschland AG   Q9/15   2012-08-22
[ 1965 ]  
 
Request for Response to OIF Liaison Statement (oif2012.265.02) a     Alcatel-Lucent USA Inc. , Xtera Communications, Inc.   Q9/15, Q14/15   2012-08-22
[ 1964 ]  
 
Proposed modification to existing Flyer "Optical Fibre and Cable"     Communication Line Products Association of Japan , Nippon Telegraph and Telephone Corporation (NTT)   Q5/15   2012-08-20
[ 1963 ]  
 
Consideration on OTL interface for OTU5     Fujitsu Limited   Q11/15   2012-08-17
[ 1962 ]  
 
Flexible high speed interfaces     Ericsson UK   Q11/15   2012-08-16
[ 1961 ]  
 
Traffic Differentiation in Transport Networks     Ericsson UK   Q9/15, Q12/15   2012-08-16
[ 1960 ]  
 
Self Configuring Networks     Ericsson UK   Q9/15   2012-08-16
[ 1959 ]  
(Rev.1) 
Bandwidth- Load sharing     Ericsson UK   Q9/15   2012-08-16
[ 1958 ]  
(Rev.1) 
G.8273.2: Discussion on text for Sections 6 through 9.     Calnex Solutions Limited   Q13/15   2012-08-15
[ 1957 ]  
 
Examples for ODU SMP scenarios     Huawei Technologies Co. Ltd. , Nokia Siemens Networks GmbH & Co. KG   Q9/15   2012-08-14
[ 1956 ]  
 
Proposal for determined text G.9955 Annex A : Interleaver     ERDF , STMicroelectronics   Q4C/15   2012-08-12
[ 1955 ]  
(Rev.1) 
Proposal for consented text G.9956 Annex A - Cor1 : Timestamp definition     ERDF , STMicroelectronics   Q4C/15   2012-08-12
[ 1954 ]  
 
Proposal for consented text G.9956 Annex A - Cor1 : Short Address in Neighbour table     ERDF, STMicroelectronics , STMicroelectronics   Q4C/15   2012-08-11
[ 1953 ]  
 
Introducing the concept of security in G.697     Telefon AB - LM Ericsson   Q6/15   2012-08-10
[ 1952 ]  
 
Considerations about security at the optical layer     Telefon AB - LM Ericsson   Q6/15   2012-08-10
[ 1951 ]  
 
Not used  
Withdrawn: Reposted as TD677/PLEN
 
N/A     2012-08-09
[ 1950 ]  
 
Not used  
Withdrawn: Reposted as TD676/PLEN
 
N/A     2012-08-09
[ 1949 ]  
(Rev.1) 
G.hnem: Proposal for the inclusion of PRIME Service Specific Convergence Layer for IPv6 in consented G.9956 Cor1 Annex B     STMicroelectronics   Q4C/15   2012-08-08
[ 1948 ]  
(Rev.1) 
G.8273.3: Noise Error Definition for T-TC to control impact of traffic.     Calnex Solutions Limited , China Unicom   Q13/15   2012-08-08
[ 1947 ]  
(Rev.1) 
G.8273.2: T-BC Noise Error Definition to control impact of traffic.     Calnex Solutions Limited , China Unicom   Q13/15   2012-08-08
[ 1946 ]  
(Rev.1) 
G.8273.2: Phase Transient interface applicability.     Calnex Solutions Limited   Q13/15   2012-08-08
[ 1945 ]  
 
Comments on Prysmian contribution for the preparation for consent of Rec. G.657     Telecom Italia S.p.A.   Q5/15   2012-07-30
[ 1944 ]  
 
Proposed changes to facilitate future approval of draft new Recommendation G.9980 (according to WTSA-08 Resolution 1, Section 9.5.5)     Germany   Q4C/15, Q4B/15, Q4A/15, Q2/15, Q1/15   2012-07-13
[ 1943 ]  
 
Germany's considerations regarding the proceedings of draft new Recommendation G.9980     Germany   QALL/15   2012-07-10
[ 1942 ]  
(Rev.1) 
ZTE Proposal for L.64 on appendix III and IV     ZTE Corporation   Q17/15   2012-07-09
[ 1941 ]  
 
Proposed Revisions to the Appendix III and IV in the Draft Revised Rec. ITU-T L.64     Huawei Technologies Co. Ltd.     2012-07-03
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2021-01-29