International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 265 ]  
 
G.vector: Proposal for a frequency division multiplexing scheme for pilot sequences and sync-flags     Alcatel-Lucent Bell N.V.   Q4/15   2008-11-21
[ 264 ]  
 
G.lt: Update to SELT-P draft text     Alcatel-Lucent Bell N.V.   Q4/15   2008-11-21
[ 263 ]  
 
Ghn: PLC Passband OFDM Parameters Proposal     Gigle Semiconductor   Q4/15   2008-11-21
[ 262 ]  
 
G.INP: Further Details on Error Monitoring, OAM and Traffic Differentiation with the Unified Retransmission Method     Infineon Technologies AG   Q4/15   2008-11-21
[ 261 ]  
 
G.hn: Proposal to use a single indexing rule     Infineon Technologies AG   Q4/15   2008-11-21
[ 260 ]  
 
Proposal to specify Failure of Protocol defects for the R-APS protocol     Lucent Technologies, Inc - AimValley BV   Q9/15   2008-11-21
[ 259 ]  
 
G.hn: Proposal for a multi-mode FEC scheme     France Telecom, Spidcom Technologies, Gigle Semico   Q4/15   2008-11-21
[ 258 ]  
 
G.inp: Limitations of the PMS-TC Retransmisssion Scheme     Infineon Technologies AG   Q4/15   2008-11-21
[ 257 ]  
 
Proposed change in Draft Annex to G.709 for transcoding via 512B/513B     NTT   Q11/15   2008-11-21
[ 256 ]  
 
Notification of IPR statement submission     DS2   Q4/15   2008-11-21
[ 255 ]  
 
G.lt: Communications Channel Extension for Measurement Data Retrieval     BT   Q4/15   2008-11-21
[ 254 ]  
 
Solution of fast GPON switching in long-reach PON scenario     Huawei technologies   Q2/15   2008-11-21
[ 253 ]  
 
Proposal to support phase synchronization in GPON system     Huawei technologies Co., LTD   Q2/15   2008-11-21
[ 252 ]  
 
Proposal to support ONT survival time attribute in G.984.4     Huawei technologies Co., LTD   Q2/15   2008-11-21
[ 251 ]  
 
Proposal on Continuous Mode of LR-PON     Huawei Technologies Co., Ltd. RAD Data communicati   Q2/15   2008-11-21
[ 250 ]  
 
Proposed text for ODU3ye/OTU3ye in supplement     Japan   Q11/15   2008-11-21
[ 249 ]  
 
Corrigendum for G.709 correcting small mistake and inconsistency with G.798     Alcatel Lucent Germany   Q9/15, Q11/15   2008-11-21
[ 248 ]  
 
Ghn: EVM Requirements Proposal     Gigle Semiconductor   Q4/15   2008-11-21
[ 247 ]  
 
Proposal to include additional PMD-related parameters in the 40G and 100G modulation format comparison documents     Deutsche Telekom   Q7/15, Q6/15   2008-11-21
[ 246 ]  
 
G.lt: Proposal for modifications to the "Loop Topology with cable-type identification" table in SELT     Ericsson AB   Q4/15   2008-11-21
[ 245 ]  
 
Consideration of OTU4 FEC requirements     Alcatel Lucent   Q11/15   2008-11-21
[ 244 ]  
 
Proposal for adding timing transparency to GFP (G.7041) mapping and its variant as given in G.Sup43 Clause 7.3 for 10GBase-R     Alcatel - Lucent Germany   Q11/15   2008-11-21
[ 243 ]  
 
Considerations about Implementation friendly justification procressing of mapping of data into ODU4     Alcatel - Lucent Germany   Q11/15   2008-11-21
[ 242 ]  
 
G.hn: Compression formats for the Ack message     DS2   Q4/15   2008-11-21
[ 241 ]  
 
G.hn: Re-synchronization in STXOPs with CFTS     DS2   Q4/15   2008-11-21
[ 240 ]  
 
G.hn: Preamble windowing in PLC     DS2   Q4/15   2008-11-21
[ 239 ]  
 
Additional PM Objects for EoT NE Information Model G.8052     Deutsche Telekom and Alcatel-Lucent   Q14/15   2008-11-21
[ 238 ]  
 
PBBN model for G.8010     BT plc   Q12/15   2008-11-21
[ 237 ]  
 
VLAN model in G.8010     BT plc   Q12/15   2008-11-21
[ 236 ]  
 
Modelling the Dynamic Behaviour of the Transport Network     BT plc   Q12/15   2008-11-21
[ 235 ]  
 
Use of Configuration and the Concept of a 'Virtual Function' as the Foundation of the Dynamic Aspects of the Unified Model     BT plc   Q12/15   2008-11-21
[ 234 ]  
 
Interworking of OTN equipment     Deutsche Telekom   Q6/15   2008-11-21
[ 233 ]  
 
Text proposal for clause 9.1.4/G.8021 ETH Split Horizon Flow Forwarding Function     Huawei Technologies Co., Ltd.   Q9/15   2008-11-21
[ 232 ]  
 
Re-use of 100 Gb Ethernet modules for OTU4     Nortel Networks (Europe)   Q6/15   2008-11-21
[ 231 ]  
 
G.lt: Proposal for MELT annex for G.lt     Infineon Technologies AG   Q4/15   2008-11-21
[ 230 ]  
 
G.lt: Proposal for a new SELT-P Physical Fault Table     Ericsson AB   Q4/15   2008-11-21
[ 229 ]  
 
Re-use of 40 Gb Ethernet modules for OTU3 and STM-256     Nortel Networks (Europe)   Q6/15   2008-11-21
[ 228 ]  
 
G.vector: Proposal for signaling of upstream vectoring parameters     Infineon Technologies AG   Q4/15   2008-11-21
[ 227 ]  
 
Some Considerations and Proposals about T-MPLS and MPLS-TP Standardization     CATR, MII China, CMCC   Q12/15   2008-11-21
[ 226 ]  
 
Signal quality supervision functionality added into OCh and OMS layer (G.798)     MII China   Q9/15   2008-11-21
[ 225 ]  
 
Proposal of control plane protocol stack in G.984.1     MII China   Q2/15   2008-11-21
[ 224 ]  
 
Proposal for revision of Rec. G.652 - the wording for the water peak requirement     MII China   Q5/15   2008-11-21
[ 223 ]  
 
Fiber nonlinearity effects consideration based on the phase modulated line code (modulation format) in the ITU-T Recommendation G.sup39     CATR, MII China   Q6/15   2008-11-21
[ 222 ]  
 
G.8264: new TX and RX state machines for ESMC     Cisco/RAD   Q13/15   2008-11-21
[ 221 ]  
 
Proposal on ODU3y supporting a mix of LO ODU signal types     China Telecom, CATR, MII China   Q11/15   2008-11-21
[ 220 ]  
 
Amendment 2 to Recommendation X.85/Y.1321 on the assignment of a set new SAPI value     MII, China   Q11/15   2008-11-21
[ 219 ]  
 
Adding OH bytes in OCh and OMS in order to make physical parameter monitoring (G.709)     MII, China   Q11/15   2008-11-21
[ 218 ]  
 
Add path OSNR penalty term in the ITU-T Recommendation G.sup39     CATR, MII, China   Q6/15   2008-11-21
[ 217 ]  
 
A couple of correction proposals to G.798     MII, China   Q9/15   2008-11-21
[ 216 ]  
 
Proposal of various modifications to G.8032 version 2     Lucent Technologies, Inc   Q9/15   2008-11-21
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21