International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 540 ]  
 
Proposal for a draft of new ITU-T Recommendation "Technical considerations on protecting outside plant facilities from natural disasters" L.tcosp     KT Corporation   Q17/15   2009-09-18
[ 539 ]  
 
Proposal for a revision of Recommendation G.696.1 for 100G application code     NTT   Q6/15   2009-09-18
[ 538 ]  
 
G.hn: Proposed text modifications for sections 8.3.3.4.6 - 8.3.3.5     Infineon Technologies AEG   Q4/15   2009-09-18
[ 537 ]  
 
Proposal to specify G.hn Management Messages for G.cx     Panasonic Corporation   Q4/15   2009-09-18
[ 536 ]  
 
Request to mandate coexistence feature between ITU-T G.9960 and ISO/IEC 12139-1.     Panasonic Corporation   Q4/15   2009-09-18
[ 535 ]  
 
G.hn: Proposal for Smart Grid architecture based on G.hn     Infineon Technologies AEG   Q4/15   2009-09-18
[ 534 ]  
 
Ghn: Analysis and Proposal on the proposed dual FEC scheme     Gigle Semiconductor   Q4/15   2009-09-18
[ 533 ]  
 
HO and LO ODUk Shared Ring Protection (SRP)     Huawei Technologies , China Academy of Telecommunication Research, MII , China Mobile Communications Corporation   Q9/15   2009-09-18
[ 532 ]  
 
G.hn: Up-convert frequency tolerance     Infineon Technologies AEG   Q4/15   2009-09-18
[ 531 ]  
 
Definition of methodology for the development of additional Test Cases for G.8261 Appendix VI.     Calnex Solutions   Q13/15   2009-09-18
[ 530 ]  
 
G.hn: Proposed text modifications in section 8.6.3 (Domain Master: Scheduling)     Infineon Technologies AEG   Q4/15   2009-09-18
[ 529 ]  
 
G.hn: Proposed text modification for section 8.5 (Endpoint node capabilities)     Infineon Technologies AEG   Q4/15   2009-09-18
[ 528 ]  
 
G.hn: Proposed text modification for section 8.6.7 (Topology maintenance)     Infineon Technologies AEG   Q4/15   2009-09-18
[ 527 ]  
 
G.hn: Proposed text modification to align bit ordering in DLL     Infineon Technologies AEG   Q4/15   2009-09-18
[ 526 ]  
 
G.hn: Proposed text modification in description of scheduled inactivity (§8.6.3)     Infineon Technologies AEG   Q4/15   2009-09-18
[ 525 ]  
 
MAC Operations using Y.1731 PDU     Alcatel-Lucent USA , Verizon   Q10/15   2009-09-18
[ 524 ]  
 
Proposal to determine BS/GS based on near-end information in G.8021     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 523 ]  
 
Proposal to clarify MI_CC_Enable only controls CCM generation in G.8021     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 522 ]  
 
G.8031 handling of DNR and WTR requests in revertive and non revertive mode, respectively     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 521 ]  
 
G.8031 state transition when WTR timers differ at both ends     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 520 ]  
 
G.8031 state transitions when a Clear command is issued, or SF-P (or SF) recovers     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 519 ]  
 
G.8031 state transitions when working recovers from SF     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 518 ]  
 
Maintaining the independence of the two ring interconnection options in G.8032v2     Alcatel-Lucent USA   Q9/15   2009-09-18
[ 517 ]  
 
Applications requiring 2 stages of ODU multiplexing     Tellabs Oy   Q11/15   2009-09-18
[ 516 ]  
 
Proposal to rename the "RPL Node" in G.8032v2     Alcatel-Lucent USA   Q9/15   2009-09-18
[ 515 ]  
 
Clarification of external ODU in clause 7/G.709     Tellabs Oy   Q11/15   2009-09-18
[ 514 ]  
 
Proposal to review and update G.8032 Study Points and Living List     Alcatel-Lucent USA   Q9/15   2009-09-18
[ 513 ]  
 
Proposed clarification regarding GFP-F mappings for 10G Ethernet     Tellabs Oy   Q11/15   2009-09-18
[ 512 ]  
 
Proposed modifications to G.8021 and G.8032 for R-APS-specific dFOP-PM and dFOP-TO     Alcatel-Lucent USA, AimValley BV   Q9/15   2009-09-17
[ 511 ]  
 
Proposal on Ethernet interfaces in optical fibre submarine cable systems     China Unicom   Q8/15   2009-09-17
[ 510 ]  
 
G.vector : Proposal to include Loop diagnostics mode in G.vector     LM Ericsson AB   Q4/15   2009-09-17
[ 509 ]  
 
Introductory text on NTP for frequency distribution in G.8264.1 and G.8261     Ericsson   Q13/15   2009-09-17
[ 508 ]  
 
Proposed Addition of CI-BCH eFEC to G.975.1     Vitesse Semiconductor (USA)   Q8/15   2009-09-17
[ 507 ]  
 
Applicability of the Q-factor measurement method to non-OOK optical signals     Ericsson   Q6/15   2009-09-17
[ 506 ]  
 
Document withdrawn     N/A     2009-09-17
[ 505 ]  
 
Initial Analysis of STM-1 Client Jitter and Wander Accumulation over OTN Islands     Huawei Technologies   Q13/15, Q11/15   2009-09-17
[ 504 ]  
 
Initial Analysis of CPRI Client Jitter and Wander Accumulation over OTN islands     Huawei Technologies   Q13/15, Q11/15   2009-09-17
[ 503 ]  
 
G.8032v2 Priority Logic description update     NSN   Q9/15   2009-09-17
[ 502 ]  
 
1 Gbit/s Ethernet Client Wander Accumulation in the Presence of Input Noise and Wide-band Jitter Accumulation, over OTN Islands     Huawei Technologies   Q13/15, Q11/15   2009-09-17
[ 501 ]  
 
Initial Development of Ethernet and SDH Input Noise Models for OTN Transport Jitter and Wander Accumulation Analyses     Huawei Technologies   Q13/15, Q11/15   2009-09-17
[ 500 ]  
 
Frequency grid for GPON wavelength converted Reach Extenders     Nortel Networks (Canada)   Q6/15, Q2/15   2009-09-17
[ 499 ]  
 
Revision of wavelength allocation grid in G.984.6Am1     Nortel Networks (Canada)   Q2/15   2009-09-17
[ 498 ]  
 
Updation of the text providing example of single fibre WC-enabled seeded RE units     Nortel Networks (Canada)   Q2/15   2009-09-17
[ 497 ]  
 
Clarifications to G.7713     Nortel Networks (Canada)   Q14/15   2009-09-17
[ 496 ]  
 
G.8264.1 proposals     Ericsson   Q13/15   2009-09-17
[ 495 ]  
 
ESMC SSM Extension: discussion on the Node Identifier     Ericsson   Q13/15   2009-09-17
[ 494 ]  
 
Transitional Links as SNPP Links     Nortel Networks (Canada)   Q12/15   2009-09-17
[ 493 ]  
 
ESMC-SSM Extensions proposals     Ericsson   Q13/15   2009-09-17
[ 492 ]  
 
G.inp: Comments on Section 8.1.4, framing type 4     Ikanos Communications, Infineon Technologies NA   Q4/15   2009-09-17
[ 491 ]  
 
ESMC Receive state machine     Nortel Networks (Canada)   Q13/15   2009-09-17
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2021-01-29