International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 565 ]  
 
Proposal for the unit of Synchronous Ethernet jitter     CATR   Q15/15   2009-09-18
[ 564 ]  
 
Proposal for Synchronous Ethernet interfaces     CATR   Q15/15   2009-09-18
[ 563 ]  
 
Document withdrawn     MII   Q6/15   2009-09-18
[ 562 ]  
 
Proposal for new recommendation L.teib "optical cabling systems in buildings"     MII   Q16/15   2009-09-18
[ 561 ]  
 
G.gen: G.vdsl: ADSL: Phase Synchronization in Layer 2     MIIT , China Unicom   Q4/15   2009-09-18
[ 560 ]  
 
Proposals about MPLS-TP Performance OAM - Delay measurement     CATR , China Mobile Communications Corp , MIIT   Q10/15   2009-09-18
[ 559 ]  
 
Proposals about MPLS-TP and Ethernet Protection Support Signal Degrade     CATR , China Mobile Communications Corp , MIIT   Q9/15, Q10/15   2009-09-18
[ 558 ]  
 
Proposal of adding GEM layer 2 service related attributions to managed entity ONT2-G     MIIT   Q2/15   2009-09-18
[ 557 ]  
 
Description & implementation examples for a WDM1r with dedicated OTDR and RF video ports     ZTE Corporation   Q2/15   2009-09-18
[ 556 ]  
 
Description & implementation examples for a WDM1r with a dedicated OTDR port     ZTE Corporation   Q2/15   2009-09-18
[ 555 ]  
 
Comments and proposals on the Summary text of G.808.2     HItachi   Q9/15   2009-09-18
[ 554 ]  
 
Comments and proposals on the text of group protection in G.808.2     Hitachi   Q9/15   2009-09-18
[ 553 ]  
 
Comments and proposals on the Summary and Scope of G.808.1     Hitachi   Q9/15   2009-09-18
[ 552 ]  
 
Comments on the layer stack description in G.ptneq     Hitachi   Q9/15   2009-09-18
[ 551 ]  
 
Request to mandate G.cx feature in G.9960 (G.hn) operating over the powerline medium     Japan   Q4/15   2009-09-18
[ 550 ]  
 
G.cx: Proposal for Consent of G.cx     Japan   Q4/15   2009-09-18
[ 549 ]  
 
G.hn: Proposal for Approval of G.9960     Japan   Q4/15   2009-09-18
[ 548 ]  
 
Addition of new Appendix IX/O.172 evaluating STM-256 reference transmitter     CIAJ   Q15/15   2009-09-18
[ 547 ]  
 
G.hn: Proposal to modify the upper limit of Fuc     NEC Corporation , Kawasaki Microelectronics , Sumitomo Electric   Q4/15   2009-09-18
[ 546 ]  
 
G.8032v2 Priority Logic description update     NSN   Q9/15   2009-09-18
[ 545 ]  
 
G.hntreq reflecting C-413 "Proposal of home network remote management requirements on G.hntreq"     NTT , Mitsubishi Electric   Q1/15   2009-09-18
[ 544 ]  
 
G.inp: Comments on draft text §9.5     Infineon Technologies USA , Broadcom   Q4/15   2009-09-18
[ 543 ]  
 
G.vector: Proposed way forward on the issue of FDM pilots     Infineon Technologies USA , Actelis Networks , Aware Inc. , Broadcom   Q4/15   2009-09-18
[ 542 ]  
 
Proposal for new draft of O.SyncEjitter (ex. O.packetjitter)     CIAJ   Q15/15, Q13/15   2009-09-18
[ 541 ]  
 
Definition of COTDR parameters     CIAJ   Q8/15   2009-09-18
[ 540 ]  
 
Proposal for a draft of new ITU-T Recommendation "Technical considerations on protecting outside plant facilities from natural disasters" L.tcosp     KT Corporation   Q17/15   2009-09-18
[ 539 ]  
 
Proposal for a revision of Recommendation G.696.1 for 100G application code     NTT   Q6/15   2009-09-18
[ 538 ]  
 
G.hn: Proposed text modifications for sections 8.3.3.4.6 - 8.3.3.5     Infineon Technologies AEG   Q4/15   2009-09-18
[ 537 ]  
 
Proposal to specify G.hn Management Messages for G.cx     Panasonic Corporation   Q4/15   2009-09-18
[ 536 ]  
 
Request to mandate coexistence feature between ITU-T G.9960 and ISO/IEC 12139-1.     Panasonic Corporation   Q4/15   2009-09-18
[ 535 ]  
 
G.hn: Proposal for Smart Grid architecture based on G.hn     Infineon Technologies AEG   Q4/15   2009-09-18
[ 534 ]  
 
Ghn: Analysis and Proposal on the proposed dual FEC scheme     Gigle Semiconductor   Q4/15   2009-09-18
[ 533 ]  
 
HO and LO ODUk Shared Ring Protection (SRP)     Huawei Technologies , China Academy of Telecommunication Research, MII , China Mobile Communications Corporation   Q9/15   2009-09-18
[ 532 ]  
 
G.hn: Up-convert frequency tolerance     Infineon Technologies AEG   Q4/15   2009-09-18
[ 531 ]  
 
Definition of methodology for the development of additional Test Cases for G.8261 Appendix VI.     Calnex Solutions   Q13/15   2009-09-18
[ 530 ]  
 
G.hn: Proposed text modifications in section 8.6.3 (Domain Master: Scheduling)     Infineon Technologies AEG   Q4/15   2009-09-18
[ 529 ]  
 
G.hn: Proposed text modification for section 8.5 (Endpoint node capabilities)     Infineon Technologies AEG   Q4/15   2009-09-18
[ 528 ]  
 
G.hn: Proposed text modification for section 8.6.7 (Topology maintenance)     Infineon Technologies AEG   Q4/15   2009-09-18
[ 527 ]  
 
G.hn: Proposed text modification to align bit ordering in DLL     Infineon Technologies AEG   Q4/15   2009-09-18
[ 526 ]  
 
G.hn: Proposed text modification in description of scheduled inactivity (§8.6.3)     Infineon Technologies AEG   Q4/15   2009-09-18
[ 525 ]  
 
MAC Operations using Y.1731 PDU     Alcatel-Lucent USA , Verizon   Q10/15   2009-09-18
[ 524 ]  
 
Proposal to determine BS/GS based on near-end information in G.8021     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 523 ]  
 
Proposal to clarify MI_CC_Enable only controls CCM generation in G.8021     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 522 ]  
 
G.8031 handling of DNR and WTR requests in revertive and non revertive mode, respectively     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 521 ]  
 
G.8031 state transition when WTR timers differ at both ends     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 520 ]  
 
G.8031 state transitions when a Clear command is issued, or SF-P (or SF) recovers     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 519 ]  
 
G.8031 state transitions when working recovers from SF     Alcatel-Lucent USA , Alcatel-Lucent Shanghai Bell   Q9/15   2009-09-18
[ 518 ]  
 
Maintaining the independence of the two ring interconnection options in G.8032v2     Alcatel-Lucent USA   Q9/15   2009-09-18
[ 517 ]  
 
Applications requiring 2 stages of ODU multiplexing     Tellabs Oy   Q11/15   2009-09-18
[ 516 ]  
 
Proposal to rename the "RPL Node" in G.8032v2     Alcatel-Lucent USA   Q9/15   2009-09-18
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21