International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Transport network structures

Study Period 2009

Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 765 ]  
 
Editorial changes to clause 6 of G.8265.1     Symmetricom   Q13/15   2010-05-10
[ 764 ]  
 
Removal of definitions in G.8265, G.8265.1 and G.8263     Symmetricom   Q13/15   2010-05-10
[ 763 ]  
 
Definition of the concept of "floor" as applied to packet transit delay studies     Symmetricom   Q13/15   2010-05-10
[ 762 ]  
 
Q11 Living List SP1 Clarification     Alcatel-Lucent   Q11/15   2010-04-29
[ 761 ]  
 
OTUk-AIS used for OTN alarm suppression     Ericsson   Q9/15, Q12/15, Q11/15   2010-04-29
[ 760 ]  
 
STM-n/OC-n Clear Channel Protection     Ericsson   Q9/15   2010-04-29
[ 759 ]  
 
Measurement Configuration for Time Error Measurements     Symmetricom , LSI   Q13/15   2010-04-28
[ 758 ]  
 
Definition of a Primary Reference Time Clock in G.8260     Symmetricom , LSI   Q13/15   2010-04-28
[ 757 ]  
 
Hierarchal PBB / PBB-TE for E-OTN     Ciena Corporation   Q9/15   2010-04-28
[ 756 ]  
 
E-OTN T-Tag Concerns     Ciena Corporation   Q9/15   2010-04-28
[ 755 ]  
 
E-OTN Requirements Outline     Ciena Corporation   Q9/15   2010-04-28
[ 754 ]  
 
Transitional Links and Resource allocation     Ciena Corporation   Q12/15   2010-04-28
[ 753 ]  
 
Need For An E-OTN Requirements Document     Ciena Corporation   Q9/15   2010-04-28
[ 752 ]  
 
G.7713 - Correction to Signalling Sequence     Ciena Corporation   Q14/15   2010-04-28
[ 751 ]  
 
Proposed modification of the GMP description text and the GbE into ODU0 mapping description text for inclusion in G.709v3 Amendment 1     PMC-Sierra   Q11/15   2010-04-28
[ 750 ]  
 
Considerations for carrying SyncE over Gigabit/s Ethernet over ODU0     PMC-Sierra   Q9/15, Q13/15, Q11/15   2010-04-28
[ 749 ]  
 
Proposed Frequency and Time-of-Day method for OTN     PMC-Sierra   Q13/15, Q11/15   2010-04-28
[ 748 ]  
 
Proposed Amendment to G.7041 to correct the terminology referring to T-MPLS     PMC-Sierra   Q11/15   2010-04-28
[ 747 ]  
 
Analysis of Last Call Comments     Panasonic Corporation   Q4/15   2009-09-24
[ 746 ]  
 
Proposal for 'black box recorder' functionality for VDSL     BT plc   Q4/15   2009-09-22
[ 745 ]  
 
Supporting a broadband backhaul application in the PTN     Huawei Technologies   Q9/15   2009-09-22
[ 744 ]  
 
Questions related to the installation of fibre-optic network in Congo     ARPTC (Congo)   Q5/15, Q18/15, Q16/15   2009-09-21
[ 743 ]  
 
Mobile LTE specification and phase/time synchronization requirements     Deutsche Telekom   Q13/15   2009-09-21
[ 742 ]  
 
NGN Synchronization requirements structure     Deutsche Telekom   Q13/15   2009-09-21
[ 741 ]  
 
EEC - SyncE interface jitter and wander measurements     Deutsche Telekom   Q13/15   2009-09-21
[ 740 ]  
 
PTP for Phase/ToD application: Need for in-house ToD interface specification     Deutsche Telekom   Q13/15   2009-09-21
[ 739 ]  
 
G.hn: The "additional channel estimation symbol" as an optional symbol     CopperGate Communications   Q4/15   2009-09-21
[ 738 ]  
 
G.hn: clarification to the text describing transmission of the "extended PHY frame header"     CopperGate Communications   Q4/15   2009-09-21
[ 737 ]  
 
G.hn: reserving some of the "Reserved by ITU-T" bits in the PHY frame header for vendor specific usage     CopperGate Communications   Q4/15   2009-09-21
[ 736 ]  
 
G.hn: PHY frame header - Size of the Duration field and frame-type specific fields re-ordering     CopperGate Communications   Q4/15   2009-09-21
[ 735 ]  
 
G.hn: Extended-detection STXOP indicator in the TXOP descriptor     CopperGate Communications   Q4/15   2009-09-21
[ 734 ]  
 
G.hn: Time-Slot Size for INUSE and PR signals     CopperGate Communications   Q4/15   2009-09-21
[ 733 ]  
 
G.hn: Support for G.hn related Recommendations     CopperGate Communications   Q4/15   2009-09-21
[ 732 ]  
 
CBTS closure cases without INUSE signal     CopperGate Communications   Q4/15   2009-09-21
[ 731 ]  
 
CBTS closure cases with INUSE signal     CopperGate Communications   Q4/15   2009-09-21
[ 730 ]  
 
Updates for the text describing media access in CBTS     CopperGate Communications   Q4/15   2009-09-21
[ 729 ]  
 
G.hn: Proposal for CYCLE_MIN and CYCLE_MAX in 09CC-R12R1, "G.hn: Draft text for G.hn"     CopperGate Communications   Q4/15   2009-09-21
[ 728 ]  
 
G.hn: Proposal for TX_ON and TS_DURATION in 09CC-R12R1, "G.hn: Draft text for G.hn"     CopperGate Communications , DS2 , Gigle Semiconductor   Q4/15   2009-09-21
[ 727 ]  
 
G.hn: Proposal for TIFG_MIN in 09CC-R12R1, "G.hn: Draft text for G.hn"     CopperGate Communications , DS2 , Gigle Semiconductor   Q4/15   2009-09-21
[ 726 ]  
 
TS grid synchronization loss detection and recovery     CopperGate Communications   Q4/15   2009-09-21
[ 725 ]  
 
Editorial modification proposal for G.8032 version 2     Republic of Korea   Q9/15   2009-09-20
[ 724 ]  
 
FDB flush operation immune to delayed data frames     Republic of Korea   Q9/15   2009-09-20
[ 723 ]  
 
FDB inconsistency problem caused by delayed data frames     Republic of Korea   Q9/15   2009-09-20
[ 722 ]  
 
Proposal on the modification of initialization scheme in Ethernet ring protection network in G.8032v1.     ETRI   Q9/15   2009-09-20
[ 721 ]  
 
Efficient network restoration scheme for G.8032     Republic of Korea   Q9/15   2009-09-20
[ 720 ]  
 
The appropriate use of Guard timer in pending state in G.8032     Republic of Korea   Q9/15   2009-09-20
[ 719 ]  
 
Proposal for a Revised draft of new ITU-T Recommendation "Integrity testing for telecommunication pole's foundation"     Republic of Korea   Q16/15   2009-09-20
[ 718 ]  
 
Contribution for the revision of ITU-T Recommendation G.657     Telecom Italia   Q5/15   2009-09-20
[ 717 ]  
 
ODU TCM Layer for OTN Auto-discovery as defined in G.7714.1     Alcatel-Lucent   Q14/15, Q12/15   2009-09-20
[ 716 ]  
 
Proposal to update the descriptions of non-linear effects at G.663 Appendix II     Alcatel-Lucent   Q7/15   2009-09-20
Results:2390 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24 - 25 - 26 - 27 - 28 - 29 - 30 - 31 - 32 - 33 - 34 - 35 - 36 - 37 - 38 - 39 - 40 - 41 - 42 - 43 - 44 - 45 - 46 - 47 - 48  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-21