International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-12-05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-12-05) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-12-05 to 2011-12-16

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-09-16  2011-02-14  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:32 total items.
Contributions  [ AI/Question: Q11/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1912 ]  
 
Maintaining the common OTN functional model in draft revised G.872     Huawei Technologies Co. Ltd. , China Mobile Communications Corporation , China Telecommunications Corporation   Q9/15, Q14/15, Q12/15, Q11/15   2011-11-22
[ 1869 ]  
(Rev.1) 
Proposal for a new recommendation G.wavereuse based on wavelength re-use     Finisar Corporation , LG-Ericsson , Telefon AB - LM Ericsson   Q6/15, Q2/15, Q12/15, Q11/15   2011-11-22
[ 1856 ]  
 
Strong FEC for 40 Gbit/s Black Link applications     Deutsche Telekom AG   Q11/15   2011-11-22
[ 1855 ]  
 
Rational for new low bit rate interfaces for the OTN     Deutsche Telekom AG   Q6/15, Q11/15   2011-11-22
[ 1818 ]  
(Rev.1) 
Considerations for joint Q.6, Q.7, Q.9, Q.11, Q.12, Q.14 meeting on flexible grid topics     Huawei Technologies Co. Ltd.   Q9/15, Q7/15, Q6/15, Q14/15, Q12/15, Q11/15   2011-11-22
[ 1810 ]  
(Rev.1) 
Comments on the draft G.7044     Electronics and Telecommunications Research Institute (ETRI)   Q11/15   2011-11-22
[ 1807 ]  
(Rev.1) 
A proposal of the modification for the draft G.7044     Electronics and Telecommunications Research Institute (ETRI)   Q11/15   2011-11-22
[ 1805 ]  
(Rev.1) 
Introduction of the super timeslots for ODU5     Huawei Technologies Co. Ltd.   Q11/15   2011-11-22
[ 1780 ]  
(Rev.1) 
Consideration on PTP over OTN solution options     Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2011-11-22
[ 1757 ]  
(Rev.1) 
Consideration on the adaptation of OTU5 over multichannel parallel interfaces     China Unicom , ZTE Corporation   Q11/15   2011-11-22
[ 1754 ]  
(Rev.1) 
Proposal of new recommendation on multi layer converged transport network (G.mlctn)     ZTE Corporation   Q9/15, Q14/15, Q12/15, Q11/15, Q10/15   2011-11-22
[ 1753 ]  
(Rev.1) 
Draft of multi layer converged network informative document     ZTE Corporation   Q9/15, Q14/15, Q12/15, Q11/15, Q10/15   2011-11-22
[ 1727 ]  
 
ESCON, Infiniband, and DVB_ASI Jitter Accumulation over OTN Islands     Huawei Technologies Co. Ltd.   Q13/15, Q11/15   2011-11-21
[ 1705 ]  
 
Enhanced delay measurement for OTN     Korea (Rep. of)   Q11/15   2011-11-21
[ 1701 ]  
 
Synchronization Requirement in OTN     China Mobile Communications Corporation   Q13/15, Q11/15   2011-11-21
[ 1690 ]  
(Rev.1) 
Proposal to study the convergence of PON and transport network in the next study period     ZTE Corporation   Q2/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-11-21
[ 1689 ]  
(Rev.1) 
Proposal to study the convergence of optical and packet in the next study period     ZTE Corporation   Q9/15, Q3/15, Q14/15, Q13/15, Q12/15, Q11/15, Q10/15   2011-11-21
[ 1688 ]  
(Rev.1) 
Proposal for joint discussion about flexible grid network     ZTE Corporation   Q9/15, Q6/15, Q14/15, Q12/15, Q11/15   2011-11-21
[ 1679 ]  
(Rev.1) 
Considerations for an OTU5/ODU5 definition     ITEK   Q11/15   2011-11-21
[ 1675 ]  
(Rev.1) 
Consideration on client signal mapping for ODU5/OTU5     Fujitsu Limited   Q11/15   2011-11-21
[ 1620 ]  
(Rev.1) 
Proposal on the 1588v2 over OTN by OSC     FiberHome Technologies Group , ZTE Corporation   Q13/15, Q11/15   2011-11-19
[ 1617 ]  
 
Withdrawn: Duplicate of C-1620  
Withdrawn
 
FiberHome Technologies Group , ZTE Corporation   Q13/15, Q11/15   2011-11-19
[ 1615 ]  
(Rev.1) 
MSI Mismatch alarm issues connected with Auto PT enabled systems interconnecting new OTN equipment (PT=21) with old equipment (PT=20)     Ciena Corporation   Q9/15, Q11/15   2011-11-19
[ 1608 ]  
(Rev.1) 
Considerations for ODU5     Alcatel-Lucent USA Inc.   Q6/15, Q11/15   2011-11-19
[ 1578 ]  
(Rev.1) 
Network Defect Handling for Hitless Adjustment to ODUflex(GFP) (HAO) During Bandwidth Resizing (BWR)     PMC-Sierra, Inc.   Q11/15   2011-11-18
[ 1577 ]  
(Rev.1) 
Hitless Adjustment to ODUflex(GFP) (HAO) Performance Parameters During Bandwidth Resizing (BWR) - Measurement Time References     PMC-Sierra, Inc.   Q11/15   2011-11-18
[ 1574 ]  
(Rev.1) 
Hitless Adjustment to ODUflex(GFP) (HAO) Performance Parameters During Bandwidth Resizing (BWR) - Latency-based Approach     PMC-Sierra, Inc.   Q11/15   2011-11-18
[ 1573 ]  
(Rev.1) 
Flexible Rate OTU signal     Finisar Corporation , Infinera Corporation , Verizon Communication Corporation   Q6/15, Q12/15, Q11/15   2011-11-18
[ 1568 ]  
 
Proposal and Comments on MPLS-TP     Cisco Systems, Inc. , Ericsson, Inc. , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-11-18
[ 1541 ]  
(Rev.1) 
G.7044 impact on G.7713     Ciena Canada   Q14/15, Q11/15   2011-11-17
[ 1520 ]  
 
DOCUMENT WITHDRAWN     Deutsche Telekom   Q6/15, Q11/15   2011-08-23
[ 1519 ]  
 
New OTN interfaces in ITU-T G.709     Deutsche Telekom   Q6/15, Q11/15   2011-07-11
Results:32 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-19