International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2011-02-14 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2011-02-14) 

ITU-T SG15

Transport network structures

Study Period 2009

Meeting  from 2011-02-14 to 2011-02-25

held in Switzerland [Geneva]

Other Meetings : 2012-09-10  2012-05-11  2011-12-05  2011-09-16  2010-10-22  2010-05-31  2010-01-15  2009-09-28  2009-05-15  2008-12-01 

Results:5 total items.
Contributions  [ Source: Marvell Semiconductor ]  [ AI/Question: Q4/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 1411 ]  
 
Fixes in the recommendation to deal with multicast traffic     Marvell Semiconductor   Q4/15   2011-02-01
[ 1410 ]  
 
G.hn: Proposal for Channel Estimation bandwidth reservation     Marvell Semiconductor   Q4/15   2011-02-01
[ 1409 ]  
 
Bandwidth allocation protocol     Marvell Semiconductor   Q4/15   2011-02-01
[ 1408 ]  
 
Proposal for Corrigendum (Geneva meeting) - analyzing different fixes to the current approved versions of G.9960 and G.9961     Marvell Semiconductor   Q4/15   2011-02-01
[ 1154 ]  
 
G.Gen, G.hx, G.cx: G.hn and G.cx management     ASSIA , AT&T , Aware , Marvell Semiconductor   Q4/15   2011-01-31
Results:5 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25