International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG 13 : Meeting 2009-01-12 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG 13  C (2009-01-12) 

ITU-T SG 13

Future networks including mobile and NGN

Study Period 2009

Meeting  from 2009-01-12 to 2009-01-23

held in Switzerland [Geneva]

Other Meetings : 2012-06-04  2012-02-17  2012-02-06  2011-10-10  2011-05-20  2011-01-17  2010-09-16  2010-04-19  2010-01-29  2009-09-02  2009-05-22 

Results:176 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 76 ]  
 
Evolution and Service consideration for Ubiquitous Services     Korea (Republic of)   Q14/13   2009-01-06
[ 75 ]  
 
Revised text on the chapter.7 of the "Living list for 3rd party IPTV service brokering scenarios" in Q.8/13     Korea (Rep. of)   Q14/13   2009-01-06
[ 74 ]  
 
Proposed new text on the chapter.6 of the "Living list for 3rd party IPTV service brokering scenarios" in Q.8/13     Korea (Rep. of)   Q14/13   2009-01-06
[ 73 ]  
 
Proposal for new draft Recommendation on architectural realizations for content delivery and storage in NGN     ETRI   Q5/13   2009-01-06
[ 72 ]  
 
A proposal to add new clause 8 titled by "Functional Requirements" for Y.NGN-MCC     ZTE; China Telecom   Q3/13   2009-01-06
[ 71 ]  
 
Proposal for obtaining location information of TLM-FE in Y.NACF Rev.1     ETRI   Q5/13   2009-01-06
[ 70 ]  
 
Proposal for adding new information 'mobility protocol type' to TLM-FE in Y.NACF Rev.1     ETRI   Q5/13   2009-01-06
[ 69 ]  
 
Proposal for minor changes in Y.NACF Rev.1     ETRI   Q5/13   2009-01-06
[ 68 ]  
 
Clarification of Home TLM-FE in Y.NACF Rev.1     ETRI   Q5/13   2009-01-06
[ 67 ]  
 
Proposal for new draft recommendation of OSE Functional Architecture for NGN     ETRI   Q5/13   2009-01-06
[ 66 ]  
 
Initial Input for Discussion on Economic Incentives for Future Network (FN)     KT   Q21/13   2009-01-06
[ 65 ]  
 
Initial Input for Discussion on Mobility Aspect of Future Network (FN)     Korea Telecom , ETRI , Samsung   Q21/13   2009-01-06
[ 64 ]  
 
Draft Y.phy_arch_ngn - New work item on architectural realizations and open interfaces in NGN     Ministry of Communications & IT, INDIA   Q5/13   2009-01-06
[ 63 ]  
 
Discussion on relationship between OSE and USN middleware     ETRI   Q3/13   2009-01-06
[ 62 ]  
 
Proxy Mobile IP based IP mobility scenario for interworking between WiMAX and UMTS     Korea Telecom   Q8/13   2009-01-06
[ 61 ]  
 
Revision to Q19/13 to include a new study item on Service Traffic Control and Optimization     China Telecom   Q19/13   2009-01-06
[ 60 ]  
 
Proposed modification to the figure in clause 6 of Y.NGN-MCC     China Telecom , ZTE   Q3/13   2009-01-06
[ 59 ]  
 
Proposed modification to clause 7 as "Service Requirements" of Y.NGN-MCC     China Telecom , ZTE   Q3/13   2009-01-06
[ 58 ]  
 
Proposed modification to clause 5 of Y.NGN-MCC     China Telecom , ZTE   Q3/13   2009-01-06
[ 57 ]  
 
Proposed revision for Y.NGN-R2-Reqts. to support Multimedia Communication Centre (MCC) service     China Telecom , ZTE   Q3/13   2009-01-06
[ 56 ]  
 
A proposal to add CAVE AKA authentication method in section 9.3 of draft Y.FMC-IMS     China Telecom   Q11/13   2009-01-06
[ 55 ]  
 
Proposal for some clarification and modification to Y.USN-reqts     CATR   Q3/13   2009-01-06
[ 54 ]  
 
Proposal for adding P2P mechanism between servers into section 7.2.3 of Y.iptv-netcontrol-fw     CATR   Q3/13   2009-01-06
[ 53 ]  
 
Functional requirements and architecture of the Deep Packet Inspection release 1     MII, China   Q17/13   2009-01-06
[ 52 ]  
 
Proposal of supplementary description of Control and Management function in network layer     CATR, MII, P.R. China   Q20/13   2009-01-06
[ 51 ]  
 
Proposal to enrich the content of the clause "Interworking" in Y.PTDN     CATR, MII, P.R. China   Q20/13   2009-01-06
[ 50 ]  
 
Proposal to enrich the content of the clause "7.2 Network address" in Y.PTDN     CATR, MII, P.R. China   Q20/13   2009-01-06
[ 49 ]  
 
Discussion on FT' comments about Y.2612     CATR, MII, P.R. China   Q20/13   2009-01-06
[ 48 ]  
 
The AAA service to provide Mobile IP in NGN     Korea (Republic of)   Q16/13   2009-01-05
[ 47 ]  
 
Proposal for restructuring of the Chapter 8 of Y.USN-reqts     ETRI   Q3/13   2009-01-05
[ 46 ]  
 
Revised proposal for chapter 6 in Y.USN-reqts     ETRI   Q3/13   2009-01-05
[ 45 ]  
 
Consideration of the GHG monitoring Service Scenario on NGN     Korea (Rep. of)   Q14/13   2009-01-05
[ 44 ]  
 
Initial Input for Discussion on Technical Issues for Future Network (FN)     ETRI   Q21/13   2009-01-05
[ 43 ]  
 
Initial Input for Discussion on Cross-Layer Communication Requirement for Future Network (FN)     ETRI   Q21/13   2009-01-05
[ 42 ]  
 
Initial Input for Discussion on the Gap between Future Network (FN) and NGN     ETRI , KT   Q21/13   2009-01-05
[ 41 ]  
 
Initial Input for Discussion on General Concept and Terminologies for Future Network (FN)     ETRI , KT   Q21/13   2009-01-05
[ 40 ]  
 
New Focus Group Proposal for Future Network Issues     ETRI   Q21/13   2009-01-05
[ 39 ]  
 
Updated text of Y.2807 draft Recommendation     ETRI (Korea, Republic of)   Q3/13   2009-01-05
[ 38 ]  
 
Input to clause 6.10.2 SAML-based mechanism of the draft Recommendation Y.NGN IdM Mechanisms     Alcatel-Lucent, USA   Q16/13   2009-01-05
[ 37 ]  
 
Input to clause 6.10 Single Sign-on of the draft Recommendation Y.NGN IdM Mechanisms     Alcatel-Lucent, USA   Q16/13   2009-01-05
[ 36 ]  
 
Input to clause 6.10.1 GBA-based mechanism of the draft Recommendation Y.NGN IdM Mechanisms     Alcatel-Lucent, USA   Q16/13   2009-01-05
[ 35 ]  
 
Modification of the diagram depicting Simple network model for bootstrapping. Input to clause 6.2.5 GBA of the draft Recommendation Y.NGN IdM Mechanisms     Alcatel-Lucent, USA   Q16/13   2009-01-05
[ 34 ]  
 
Update to input to clause 6.2.4 Authentication and Key Agreement (AKA) of the draft Recommendation Y.NGN IdM Mechanisms     Alcatel-Lucent, USA   Q16/13   2009-01-05
[ 33 ]  
 
Consideration of inclusion of new work item on architectural realizations and open interfaces in NGN, in Q5/13, as per WTSA 08 outcome     Ministry of Communications & IT, INDIA   QALL/13   2009-01-05
[ 32 ]  
 
A Trusted Provider Identity Framework for NGNs     VeriSign   Q16/13   2009-01-05
[ 31 ]  
 
Proposed changes to terminology for Y.iscp-scen     NTT Corporation   Q20/13   2009-01-05
[ 30 ]  
 
Proposed relationship to 21/13 in Y.iscp-scen     NTT Corporation   Q20/13   2009-01-05
[ 29 ]  
 
Adding data-plane scenario for iSCP     NTT Corporation   Q20/13   2009-01-05
[ 28 ]  
 
Proposals for modification and addition for the section 5.8 of the draft Recommendation Y.secMechanisms     NTT   Q16/13   2009-01-05
[ 27 ]  
 
Proposal for modification on section 5.3-5.7 of Y.secMechanisms     NTT   Q16/13   2009-01-05
Results:176 total items.
Result page:  Previous -  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2017-1-18