International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG05 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG05  C 

ITU-T SG05

ICT and climate change

Study Period 2009

Results:520 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  -  Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 45 ]  
 
EMF exposure assessment - special cases     Telekomunikacja Polska, Poland   Q2/5   2009-10-01
[ 44 ]  
 
Co-location, unbundling and interoperability in telecommunication networks     ARPTC   Q1/5   2009-10-01
[ 43 ]  
 
North American wiring simulators     IEEE   Q4/5, Q13/5   2009-09-25
[ 42 ]  
 
Time variation of electromagnetic field strength radiated from IMT-2000 base station antenna     NTT DoCoMo Inc. , NICT   Q3/5   2009-09-17
[ 41 ]  
 
Equipment testing and evaluating methods for the QOE of broadband customer premises equipments within Multi-interference factors     China Telecoms Corp.   Q8/5, Q12/5   2009-09-10
[ 40 ]  
 
Test methods for Resistibility of xDSL modem related to lightning protection     China Telecoms Corp.   Q4/5   2009-09-10
[ 39 ]  
 
Comments and suggestions for an automatic long term EMF measurement system     Swisscom Ltd.   Q3/5   2009-05-19
[ 38 ]  
 
Draft Revision of Rec. K.30rev/K.ocp     Bourns Inc.   Q13/5   2009-05-19
[ 37 ]  
 
Proposed new question and their related Study Groups on 'Energy Saving Requirements for ICTs over the lifecycle'     BT , FT , Telecom Italia   QALL/5   2009-05-15
[ 36 ]  
 
Proposed new question and their related Study Groups on 'ICTs for GHG abatement in buildings'     BT   QALL/5   2009-05-15
[ 35 ]  
 
Proposed new question and their related Study Groups on 'ICTs for GHG reduction by travel substitution'     BT   QALL/5   2009-05-15
[ 34 ]  
 
Proposed new question and related Study Groups on 'Technologies for Carbon Labelling over the Lifecycle"     BT , NSN Germany   QALL/5   2009-05-15
[ 33 ]  
 
Determination of Relevant Measurement Points     ANATEL, Brazil   Q3/5   2009-05-15
[ 32 ]  
 
Inputs from Brazil to K.Guide     ANATEL, Brazil   Q3/5   2009-05-15
[ 31 ]  
 
Working document toward draft new Recommendation K.guide     Telekomunikacja Polska, Poland   Q3/5   2009-05-14
[ 30 ]  
 
Editorial errors in ITU-T Recommendation K.52     Telekomunikacja Polska, Poland   Q3/5   2009-05-14
[ 29 ]  
 
Comparison between measurement and calculations of the EMF     Telekomunikacja Polska, Poland   Q3/5   2009-05-14
[ 28 ]  
 
A proposal on the structure of a new WP for climate change issues     Republic of Korea   QALL/5   2009-05-14
[ 27 ]  
 
Field experiments to confirm the error rate by deviated potential probe positioning in the fall-of-potential earth resistance measurement method     Republic of Korea   Q6/5   2009-05-14
[ 26 ]  
 
Test results on conductive coupling effects when measure induced voltage on telecommunication line near a.c. traction line with AT feeding system in Korea     KT, Korea   Q9/5   2009-05-14
[ 25 ]  
 
Proposal of measurement time reduction for exposure assessment     Republic of Korea   Q3/5   2009-05-14
[ 24 ]  
 
Proposed new questions and their related Study Groups on ICT and Climate Change     NTT , BT , FT , Fujitsu   QALL/5   2009-05-14
[ 23 ]  
 
Proposed test condition for PTN immunity test     ZTE Corporation   Q12/5   2009-05-14
[ 22 ]  
 
Proposal for Recommendation K.guide: Calculation and measurements for exposure assessment of adaptive antennas     China Mobile Communications Corp.   Q3/5   2009-05-14
[ 21 ]  
 
Conducted electromagnetic environment research in home networking     MIIT, China   Q8/5   2009-05-14
[ 20 ]  
 
Test results of "Broadband impulsive conducted disturbances"     CIAJ   Q8/5   2009-05-14
[ 19 ]  
 
Measurement time for EMF exposure assessment     Thailand   Q3/5   2009-05-14
[ 18 ]  
 
Automatic Long Term EMF Measurement System     Germany   Q3/5   2009-04-08
[ 17 ]  
 
Determination of relevant measurement points - Document withdrawn     ANATEL, Brazil   Q3/5   2008-11-14
[ 16 ]  
 
New buildings height zoning - Document withdrawn     ANATEL, Brazil   Q3/5   2008-11-14
[ 15 ]  
 
Immunity test method for radiated electromagnetic field excited from wireless device     NTT Inc. , NTT DoCoMo   Q12/5   2008-11-14
[ 14 ]  
 
Proposal for the ESD criteria in Recommendations K.20, K.21, K.44 and K.45     Huawei Technologies Co. Ltd.   Q4/5   2008-11-13
[ 13 ]  
 
Measurement Results of REIN Disturbance to ADSL2+ and VDSL2     Huawei Technologies Co. Ltd. , Telecom Italia   Q8/5, Q12/5   2008-11-13
[ 12 ]  
 
Comments on new Questions     NTT   QALL/5   2008-11-13
[ 11 ]  
 
Refinement to the last contribution about the earth resistance measurement method in "Earthing and Bonding Handbook"     Republic of Korea   Q6/5   2008-11-12
[ 10 ]  
 
Proposal for Recommendation K.guide: measurement time for exposure assessment     Republic of Korea   Q3/5   2008-11-12
[ 9 ]  
 
Review of the IEC /CENELEC standards concerning human exposure to EMFs     Telekomunikacja Polska, Poland   Q3/5   2008-11-12
[ 8 ]  
 
Working document toward draft new Recommendation K.guide     Telekomunikacja Polska, Poland   Q3/5   2008-11-12
[ 7 ]  
 
Exposure limits as a part of the new Recommendation K.guide     Telekomunikacja Polska, Poland   Q3/5   2008-11-12
[ 6 ]  
 
The suggestion of considering the construction safety requirements in K.51     ZTE Corporation   Q11/5   2008-11-11
[ 5 ]  
 
The suggestion of study on the EMC requirements for the Packet Transport Network equipment     ZTE Corporation   Q12/5   2008-11-11
[ 4 ]  
 
K.72 survey results of the German NC (ex COM 5 - C 69)     Germany   Q5/5   2008-11-10
[ 3 ]  
 
xDSL-disturbances in telecommunication networks caused by electrical equipment in private premises (ex COM 5 - C 68)     Deutsche Telekom Germany   Q8/5   2008-11-10
[ 2 ]  
 
Proposed changes to Recommendation K.64 (ex COM 5 - C 67)     Australia   Q11/5   2008-11-10
[ 1 ]  
 
Questions allocated to Study Group 5 (Protection against electromagnetic environment effects) for the 2009-2012 study period     WTSA-08   QALL/5   2008-11-10
Results:520 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11  -  Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2012-09-27