International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Results:913 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 113 ]  
 
IWF in G.8261     Ericsson   Q13/15   2006-10-18
[ 112 ]  
 
Discussion on IWF model (G.pacmod living list item 2)     Ericsson   Q13/15   2006-10-18
[ 111 ]  
 
Proposals for Service Clock and Network Clock in G.8261 and G.paclock     Ericsson   Q13/15   2006-10-18
[ 110 ]  
 
Packet Network reference Models in G.8261     Ericsson   Q13/15   2006-10-18
[ 109 ]  
 
MPLS in the G.8261 scope     Ericsson   Q13/15   2006-10-18
[ 108 ]  
 
Proposals for corrections in ITU-T G.8261     Ericsson   Q13/15   2006-10-18
[ 107 ]  
 
Comments on G.smx draft 0.2     Italy   Q10/15   2006-10-18
[ 106 ]  
 
Some proposals for characterizing the transient response of OADMs, ROADMs and PXCs in G.otf     Italy   Q7/15, Q6/15   2006-10-18
[ 105 ]  
 
Proposals for the revision of G.697     Telecom Italia   Q6/15   2006-10-18
[ 104 ]  
 
Proposal to include in G.959.1 very-long-haul 10G application codes based on the duobinary modulation format, capable to tolerate up to 3200 ps/nm of residual chromatic dispersion with no need of dispersion compensation     Marconi   Q6/15   2006-10-18
[ 103 ]  
 
All Optical Packet Networks: outcomes of the IST LASAGNE project     Telecom Italia   Q7/15, Q6/15, Q12/15   2006-10-18
[ 102 ]  
 
Proposal for the collaboration activities to study GPON and next generation PON management     NTT   Q2/15   2006-10-18
[ 101 ]  
 
Proposal of new draft Recommendation of wavelength allocation for PON     NTT   Q2/15   2006-10-18
[ 100 ]  
 
G.vdsl, G.hs: proposed draft texts of Handshake specifications for G.993.2 Amendment 1 Annex C     NTT , Sumitomo Electrics , NEC , Fujitsu , ACCA Networks   Q4/15   2006-10-18
[ 99 ]  
 
G.paclock draft rearrangement     Zarlink Semiconductor   Q13/15   2006-10-18
[ 98 ]  
 
G.paclock alignment with G.813 for Synchronous Ethernet     Zarlink Semiconductor   Q13/15   2006-10-18
[ 97 ]  
 
G.paclock - Wander Tolerance test results for Synchronous Ethernet     Zarlink Semiconductor   Q13/15   2006-10-18
[ 96 ]  
 
G.paclock - Wander Tolerance for Synchronous Ethernet     Zarlink Semiconductor   Q13/15   2006-10-18
[ 95 ]  
 
G.paclock - Scope     Zarlink Semiconductor   Q13/15   2006-10-18
[ 94 ]  
 
ITU-T G.8261 - Reference missing in Recommendation Proposals for corrections in ITU-T G.8261     Zarlink Semiconductor   Q13/15   2006-10-18
[ 93 ]  
 
Comment on G.8021 and G.8010     BT   Q12/15, Q9/15   2006-10-18
[ 92 ]  
 
Comments on G.8110.1     BT   Q12/15   2006-10-18
[ 91 ]  
 
Comment on G.8021     BT   Q9/15   2006-10-18
[ 90 ]  
 
ADSL:G.vdsl: Control parameters and performance of a retransmission scheme     Broadcom   Q4/15   2006-10-18
[ 89 ]  
 
Unified model - Topology     Nortel Networks (Canada)   Q12/15   2006-10-18
[ 88 ]  
 
Unified model - Symbols and conventions     Nortel Networks (Canada)   Q12/15   2006-10-18
[ 87 ]  
 
Unified model - Identifiers     Nortel Networks (Canada)   Q12/15   2006-10-18
[ 86 ]  
 
Unified model - Division of layer network resources     Nortel Networks (Canada)   Q12/15   2006-10-18
[ 85 ]  
 
Unified Model - Sublayers     Nortel Networks (Canada)   Q12/15   2006-10-18
[ 84 ]  
 
Unified Model - Network Management Aspects     Nortel Networks (Canada)   Q12/15   2006-10-18
[ 83 ]  
 
PBB Model For G.8010v2 Appendix III and related G.8010v2 & G.8021v2 sections     Nortel Networks (Canada)   Q9/15, Q12/15   2006-10-18
[ 82 ]  
 
Resilient Packet Ring for G.8010     Nortel Networks (Canada)   Q12/15, Q9/15   2006-10-18
[ 81 ]  
 
Ethernet Ring Protection Scheme - Ring Steering     Nortel Networks (Canada)   Q9/15   2006-10-18
[ 80 ]  
 
Ethernet priorities     Nortel Networks (Canada)   Q14/15, Q11/15, Q9/15, Q12/15   2006-10-18
[ 79 ]  
 
G.813 clock for Synchronous Ethernet equipment     Nortel Networks (Canada)   Q13/15   2006-10-18
[ 78 ]  
 
RPR for G.8021     Nortel Networks (Canada)   Q9/15   2006-10-18
[ 77 ]  
 
Ethernet Ring Requirements by Network Segment     Nortel Networks (Canada)   Q9/15, Q12/15   2006-10-18
[ 76 ]  
 
Terminology for G.paclock     Telcordia   Q13/15   2006-10-18
[ 75 ]  
 
Proposed PBB model and I-Tag definition issue     Alcatel   Q12/15   2006-10-18
[ 74 ]  
 
Considerations in synchronous Ethernet equipment provisioning     Symmetricom   Q13/15   2006-10-18
[ 73 ]  
 
Protocol specific rate limiting     PMC Sierra   Q2/15   2006-10-18
[ 72 ]  
 
Proposed Amendment 2 to G.7043/Y.1343     PMC Sierra   Q11/15   2006-10-18
[ 71 ]  
 
Proposed Corrigendum to ITU-T Rec. G.7041 (GFP)     PMC Sierra   Q11/15   2006-10-18
[ 70 ]  
 
VDSL2: Follow up on proposed baseline text for OLR mechanism     Conexant Systems , Ikanos Communications   Q4/15   2006-10-18
[ 69 ]  
 
G.hn: The LLC sub-layer functions     CopperGate Communications   Q4/15   2006-10-18
[ 68 ]  
 
G.vdsl2 - Revised European Operator Requirements for VDSL2 Band Plan Extensions     BT , Telefónica O2 Czech Republic , Deutsche Telekom , Swisscom , Teliasonera , Telenor , Telecom Italia , France Telecom   Q4/15   2006-10-18
[ 67 ]  
 
Protocol extension for automatic discovery in OTN networks     ETRI   Q14/15   2006-10-18
[ 66 ]  
 
G.VDSL2: Proposed update of G.993.2 Annex A     Ikanos , Infineon , AT&T , Conexant , Aktino   Q4/15   2006-10-17
[ 65 ]  
 
Clarifications for 1-Phase/2-Phase APS protocols for G.8031     Mitsubishi   Q9/15   2006-10-17
[ 64 ]  
 
Proposal for Appendix of G.666     Lucent Technologies Germany , Deutsche Telekom   Q7/15   2006-10-17
Results:913 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2006-09-28