International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2008-02-11 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2008-02-11) 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting  from 2008-02-11 to 2008-02-22

held in Switzerland [Geneva]

Other Meetings : 2008-12-01  2007-06-04  2006-10-30  2006-02-06  2005-05-16  2004-11-29 

Results:289 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 663 ]  
 
G.vdsl: Definition of electrical loop length     Broadcom   Q4/15   2008-01-29
[ 662 ]  
 
G.INP; ADSL: Retransmission Control Channel with reduced bandwidth for G.992.3     Broadcom   Q4/15   2008-01-29
[ 661 ]  
 
ADSL: G.INP: Updated working text for retransmission     Broadcom   Q4/15   2008-01-29
[ 660 ]  
 
.inp: Evaluation of Different Retransmission Methods for Impulse Noise Protection     Conexant Systems Inc   Q4/15   2008-01-29
[ 659 ]  
 
G.inp: Proposed Protocol for Retransmission Above the Gamma Interface     Conexant, Infineon NA, 2-Wire, Ikanos, Aware   Q4/15   2008-01-29
[ 658 ]  
 
G.vdsl: SOS working text proposal     Ikanos Comms, Conexant, Infineon USA   Q4/15   2008-01-29
[ 657 ]  
 
Justification and Requirements for sub-ODU1 multiplexed services for metropolitan and wide area networks     Ciena Corporation, Vitesse Semiconductor   Q11//15   2008-01-29
[ 656 ]  
 
Frame structures and multiplexing approach to support ODUk sub-wavelength service multiplexing in OTN     Ciena Corporation, Vitesse Semiconductor   Q11/15   2008-01-29
[ 655 ]  
 
Overhead required to support sub-ODU1 service multiplexing and add/drop     Ciena Corporation, Vitesse Semiconductor   Q11/15   2008-01-29
[ 654 ]  
 
DCN Architecture and Gateways     Ciena Corp   Q14/15, Q12/15   2008-01-29
[ 653 ]  
 
Problems with G.8010     Ciena Corp   Q14/15, Q12/15, Q9/15   2008-01-29
[ 652 ]  
 
Problems with G.7718.1     Ciena Corp   Q14/15   2008-01-29
[ 651 ]  
 
The future of G.7716     Ciena Corp, Nortel Networks (USA)   Q12/15   2008-01-29
[ 650 ]  
 
Addressing PDV aspects in packet networks     LSI Corporation   Q13/15   2008-01-29
[ 649 ]  
 
PDV generation due to asymmetric traffic loading of packet switches     LSI Corporation   Q13/15   2008-01-29
[ 648 ]  
 
g.hn media diagnostics     AT&T   Q4/15   2008-01-29
[ 647 ]  
 
Draft Liaison to Q5 SG4 on Packet Delay Measurement Equipment     Symmetricom   Q13/15   2008-01-29
[ 646 ]  
 
minTDEV Calculation Study     Symmetricom   Q13/15   2008-01-29
[ 645 ]  
 
Principles of time-stamp methods     Semtech, Inc & Symmetricom   Q13/15   2008-01-29
[ 644 ]  
 
Packet Timing (IEEE 1588, NTP) Telecom Reference Clock Model     Symmetricom   Q13/15   2008-01-29
[ 643 ]  
 
Intra-Office Synchronization of Time and Frequency     Symmetricom   Q13/15   2008-01-29
[ 642 ]  
 
Example IEEE1588 version 2 Telecommunications Profile for GSM/UMTS basestation synchronization     Symmetricom   Q13/15   2008-01-29
[ 641 ]  
 
Template for a Telecommunications Profile for IEEE1588 version 2     Symmetricom   Q13/15   2008-01-29
[ 640 ]  
 
Methods for Applying Traffic in Recommendation G.8261 Appendix VI     Symmetricom   Q13/15   2008-01-29
[ 639 ]  
 
G.vdsl: Proposal for control of SOS     AT&T, Conexant Systems Inc   Q4/15   2008-01-28
[ 638 ]  
 
G.vector: Enhancements to the Reference Model for G.Vector     ASSIA Inc.   Q4/15   2008-01-28
[ 637 ]  
 
G.inp: Performance measurements of erasure decoding     Conexant Systems Inc   Q4/15   2008-01-28
[ 636 ]  
 
G.gen: G.vdsl: G.ploam: Self-consistent Parameter Group     ASSIA Inc.   Q4/15   2008-01-28
[ 635 ]  
 
G.VDSL: Proposed Baseline Text for Accuracy for Test Parameters in VDSL2     ASSIA Inc.   Q4/15   2008-01-28
[ 634 ]  
 
Simulations data of "2dB filter bandwidths" for the study of 43Gb/s modulation formats (WD6-36)     Alcatel-Lucent   Q6/15   2008-01-28
[ 633 ]  
 
Simulations data of "2dB filter bandwidths" for the study of OTU4 bitrates and modulation formats (WD6-34)     Alcatel-Lucent   Q6/15   2008-01-28
[ 632 ]  
 
Proposal for note on regenerator jitter generation of STM256 interfaces for G.783     Alcatel-Lucent   Q13/15, Q9/15, Q6/15   2008-01-25
[ 631 ]  
 
Proposal for finalising of work on STM256 jitter specification     Alcatel-Lucent   Q13/15, Q9/15, Q6/15   2008-01-25
[ 630 ]  
 
Proposal of a corrigendum for G.8251 in relation to results of STM256 jitter specification     Alcatel-Lucent   Q13/15, Q9/15, Q6/15   2008-01-25
[ 629 ]  
 
Proposal to revise G.8251 in relation to results of STM-256 jitter specifications     Germany   Q13/15   2008-01-24
[ 628 ]  
 
G.650.3 Revision Proposal - Abstract     UK   Q5/15   2008-01-21
[ 627 ]  
 
Revision of G.650.3 - Proposed new text     UK   Q5/15   2008-01-21
[ 626 ]  
 
Manual switch command in G.8032     BT   Q9/15   2007-12-04
[ 625 ]  
 
Extending Wait to Restore times in G.841, G.808.1, G.8031, G.8032     BT   Q9/15, Q11/15   2007-11-30
Results:289 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6  
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25