International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG15 : Meeting 2006-10-30 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG15  C (2006-10-30) 

ITU-T SG15

Optical and other transport network infrastructures

Study Period 2005

Meeting  from 2006-10-30 to 2006-11-10

held in Switzerland [Geneva]

Other Meetings : 2008-12-01  2008-02-11  2007-06-04  2006-02-06  2005-05-16  2004-11-29 

Results:49 total items.
Contributions  [ AI/Question: Q9/15 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 292 ]  
 
WITHDRAWN - Duplicate with C65  
WITHDRAWN Duplicate with C65
 
Mitsubishi   Q9/15   2006-10-20
[ 274 ]  
 
T-MPLS Definition     Alcatel , Ericsson   Q12/15, Q9/15   2006-10-20
[ 273 ]  
 
Proposed mechanism for T-MPLS TCM using label stacking     Alcatel   Q12/15, Q11/15, Q9/15   2006-10-20
[ 271 ]  
 
Transport MPLS Protection Architecture     Alcatel   Q12/15, Q9/15   2006-10-20
[ 267 ]  
 
Proposals for draft Recommendation G.8131 (Protection switching for Transport MPLS (T-MPLS) networks)     Huawei Technologies , Alcatel , Tellabs Oy   Q9/15   2006-10-20
[ 265 ]  
 
Proposal for T-MPLS TCM using label stacking     Alcatel   Q12/15, Q9/15   2006-10-20
[ 244 ]  
 
Ethernet Ring Protection     Siemens   Q9/15   2006-10-20
[ 242 ]  
 
Impact of T-MPLS on a carrier operations group     Cisco Systems   Q14/15, Q12/15, Q11/15, Q9/15   2006-10-20
[ 240 ]  
 
Engagement of ITU-T SG15 with IEEE 802.3 Higher Speed Study Group (802.3 HSSG) in consideration of current 802.3 HSSG efforts to define objectives for Higher Speed Ethernet     AT&T , Sprint Nextel , Verizon   Q12/15, Q11/15, Q9/15, Q6/15   2006-10-20
[ 235 ]  
 
Ethernet protection and physical constraints     BT   Q9/15   2006-10-20
[ 233 ]  
 
Proposal for T-MPLS MIP Identification     Alcatel   Q12/15, Q9/15   2006-10-20
[ 232 ]  
 
100 Gbit/s interface     Alcatel   Q11/15, Q9/15   2006-10-20
[ 218 ]  
 
Proposed mechanisms of Loop Free Ethernet Rings Protection     NTT   Q9/15   2006-10-20
[ 217 ]  
 
The influence of loops on frame forwarding     NTT   Q9/15   2006-10-20
[ 216 ]  
 
Comparison of Y.1731with IEEE802.1ag     NTT   Q9/15   2006-10-20
[ 215 ]  
 
Proposal for Initial Draft of Ethernet Rings Protection     NTT   Q9/15   2006-10-20
[ 204 ]  
 
A Proposal for T-MPLS Tandem Connection Monitoring Mechanism     ZTE Corporation   Q9/15   2006-10-20
[ 202 ]  
 
A Proposal for T-MPLS Loopback to G.8121     ZTE Corporation   Q9/15   2006-10-20
[ 187 ]  
 
T-MPLS Shared Protection Ring Initial Draft     Alcatel   Q9/15   2006-10-19
[ 186 ]  
 
Concerns about development of 2-phase APS protocol     NTT   Q9/15   2006-10-19
[ 183 ]  
 
Comment on WD51r1 (Sept.06) and G.808.1 (03/06) Enhancing text on k-phase (k=1,2,3) protocols in clause 24/G.808.1     Alcatel   Q9/15   2006-10-19
[ 181 ]  
 
Proposal to specify a T-MPLS Transport Module (TTM) interface in G.8112 and G.8121     Alcatel   Q11/15, Q9/15   2006-10-19
[ 179 ]  
 
Ethernet SSM encoding description in Appendix VIII/G.8261     Alcatel   Q13/15, Q11/15, Q9/15   2006-10-19
[ 164 ]  
 
Completion of jitter specifications in G.783 and G.825 for 10 Gb/s and 40 Gb/s     Lucent Technologies Germany   Q9/15, Q13/15   2006-10-19
[ 162 ]  
 
Proposal of updating G.8131 (SNC protection)     Fujitsu   Q9/15   2006-10-19
[ 161 ]  
 
Consideration of APS protocol and protection architectures for G.8131     Fujitsu   Q9/15   2006-10-19
[ 159 ]  
 
Proposed TTL description for G.8110.1 Amendment 1     Fujitsu   Q9/15, Q12/15   2006-10-19
[ 151 ]  
 
Path Degradation in Packet Transport Network     Huawei Technologies   Q9/15, Q12/15   2006-10-19
[ 144 ]  
 
Shared Bandwidth Rate Control     Huawei Technologies   Q12/15, Q9/15   2006-10-19
[ 140 ]  
 
Proposal for TCM in G.798     Huawei Technologies   Q11/15, Q9/15   2006-10-19
[ 137 ]  
 
Proposal for TCM in G.709     Huawei Technologies   Q9/15, Q11/15   2006-10-19
[ 136 ]  
 
Proposal for sequencing TCM levels in G.798     Huawei Technologies   Q11/15, Q9/15   2006-10-19
[ 120 ]  
 
Proposed corrections and clarifications to the protection architectures and APS protocols in G.808.1 and next version of G.8031     Republic of Korea   Q9/15   2006-10-18
[ 119 ]  
 
A Proposal for additional protection types operating without APS in G.8031     Republic of Korea   Q9/15   2006-10-18
[ 93 ]  
 
Comment on G.8021 and G.8010     BT   Q12/15, Q9/15   2006-10-18
[ 91 ]  
 
Comment on G.8021     BT   Q9/15   2006-10-18
[ 83 ]  
 
PBB Model For G.8010v2 Appendix III and related G.8010v2 & G.8021v2 sections     Nortel Networks (Canada)   Q9/15, Q12/15   2006-10-18
[ 82 ]  
 
Resilient Packet Ring for G.8010     Nortel Networks (Canada)   Q12/15, Q9/15   2006-10-18
[ 81 ]  
 
Ethernet Ring Protection Scheme - Ring Steering     Nortel Networks (Canada)   Q9/15   2006-10-18
[ 80 ]  
 
Ethernet priorities     Nortel Networks (Canada)   Q14/15, Q11/15, Q9/15, Q12/15   2006-10-18
[ 78 ]  
 
RPR for G.8021     Nortel Networks (Canada)   Q9/15   2006-10-18
[ 77 ]  
 
Ethernet Ring Requirements by Network Segment     Nortel Networks (Canada)   Q9/15, Q12/15   2006-10-18
[ 65 ]  
 
Clarifications for 1-Phase/2-Phase APS protocols for G.8031     Mitsubishi   Q9/15   2006-10-17
[ 55 ]  
 
10GbE LAN PHY within OTN optical hierarchy     Sprint Nextel   Q14/15, Q13/15, Q12/15, Q9/15, Q6/15, Q11/15   2006-10-17
[ 54 ]  
 
Proposal for management communications methodology between systems connected by virtual concatenation of PDH signals     Ceterus Networks , Sprint Nextel   Q14/15, Q12/15, Q9/15, Q11/15   2006-10-17
[ 53 ]  
 
Questions to consider on Ultra-High Rate Services with OTN Virtual Concatenation     Ceterus Networks , Sprint Nextel   Q14/15, Q12/15, Q9/15, Q11/15   2006-10-17
[ 45 ]  
 
Proposals to restructure packet ring and linear protection Recommendations     Ericsson   Q9/15   2006-10-16
[ 44 ]  
 
Proposed Supplement on Network Architecture for transport of Ethernet Services     Lucent Technologies , Sprint Nextel , AT&T , Verizon , AMCC , Alcatel   Q6/15, Q13/15, Q12/15, Q9/15, Q11/15   2006-10-17
[ 43 ]  
 
Proposal to add state diagram in G.808.1     Hitachi   Q9/15   2006-10-10
Results:49 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-24