International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-T : SG13 : Meeting 2004-12-07 : Delayed Contributions  Recently posted -  Search Meeting Documents
   
ITU-T SG13  D (2004-12-07) 

ITU-T SG13

Next-generation networks

Study Period 2005

Meeting  from 2004-12-07 to 2004-12-17

held in Switzerland [Geneva]

Other Meetings : 2009-09-01  2009-01-12  2008-09-12  2008-05-22  2008-01-14  2007-09-21  2007-04-16  2006-11-03  2006-07-17  2006-01-16  2005-08-29  2005-04-25  [ 2004-12-07 ] 

Results:21 total items.
Delayed Contributions  [ AI/Question: Q5/13 ]   Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 67 ]  
 
A Proposal on further application method of FDI packet and BDI packet     ZTE corporation, China   Q5/13   2004-11-30
[ 66 ]  
 
A Proposal on redefinition of TTSI structure     ZTE corporation, China   Q5/13   2004-11-30
[ 65 ]  
 
The NGN Directory Framework - Architecture and Protocols     VeriSign, Inc.   Q11/13, Q8/13, Q7/13, Q5/13, Q3/13, Q2/13, Q1/13   2004-11-26
[ 64 ]  
 
Operational Scenarios     Nortel Networks (Canada)   Q5/13   2004-11-26
[ 56 ]  
 
Trail Ingress as Source of Fault Notifications     Nortel Networks (Canada)   Q7/13, Q5/13   2004-11-26
[ 55 ]  
 
The "Modified Emulated Loop" model of fault notifications     Nortel Networks (Canada)   Q7/13, Q5/13   2004-11-26
[ 54 ]  
 
Allocation of ETH ME levels to ETH Path, Segment and Section levels     Alcatel   Q5/13   2004-11-26
[ 53 ]  
 
ETH connection management alternatives and ETH OAM     Alcatel   Q5/13   2004-11-26
[ 52 ]  
 
ETH OAM for aggregated (bundled) signals     Alcatel   Q5/13   2004-11-26
[ 44 ]  
 
Reconsideration of ETH Diagnostic Flow     Hitachi   Q5/13   2004-11-26
[ 43 ]  
 
Comment on Ethernet Loopback     Hitachi   Q5/13   2004-11-26
[ 42 ]  
 
Comment on Failure Condition     Hitachi   Q5/13   2004-11-26
[ 41 ]  
 
Comment on MIP/MEP     Hitachi   Q5/13   2004-11-26
[ 33 ]  
 
OAM scenario examples without the CC function     NTT Corporation   Q5/13   2004-11-25
[ 32 ]  
 
Comments to the CC function     NTT Corporation   Q5/13   2004-11-25
[ 20 ]  
 
Proposal to develop a new draft recommendation on VPN OAM     Huawei Technologies Co. Ltd   Q5/13, Q2/13   2004-11-23
[ 17 ]  
 
Some applications of the peer ME defect     Huawei Technologies Co., Ltd.   Q5/13   2004-11-22
[ 11 ]  
 
Removal of LSP Query from Draft Y.17fw     USA   Q5/13   2004-11-17
[ 4 ]  
 
Enhancements to Y.17ethoam Connectivity Check Message     Cisco Systems   Q5/13   2004-11-17
[ 3 ]  
 
Move CR-LDP in Draft Y.17fw to an Appendix     Cisco Systems   Q5/13   2004-11-17
[ 2 ]  
 
MPLS availability definition and fault management mechanisms     Cisco Systems   Q5/13   2004-11-17
Results:21 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Test ITU Translate for automated document translation
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  TSB EDH
Updated : 2024-4-25