Contributions  |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 234 ]
+Ch.1-7 |
Report on the twenty-fourth meeting of Working Party 5D (Geneva, 14-22 June 2016)
|
Chairman, WP 5D
|
|
2016-06-22 |
|
[ 233 ]
|
Final List of Participants - Working Party 5D (Geneva, 14-22 June 2016)
|
Director, BR
|
|
2016-06-22 |
|
[ 232 ]
|
Update on recent activities within ATU
|
ITU Region 1 (ATU) Rapporteur
|
|
2016-06-20 |
|
[ 231 ]
|
Correspondence received regarding the update of Recommendation ITU-R M.1457 to Revision 13 ("Certification B")
|
Director, BR
|
|
2016-06-16 |
|
[ 230 ]
|
Correspondence received regarding the update of Recommendation ITU-R M.2012 to Revision 3
|
Director, BR
|
|
2016-06-16 |
|
[ 229 ]
|
Liaison statement to Working Parties 3J, 3K, 3M, 4A, 4C, 5A, 5B, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an earth station in the frequency bands between 100 MHz and 105 GHz
|
WP 1A
|
|
2016-06-13 |
|
[ 228 ]
|
Liaison statement to Working Parties 3J, 3K and 3M (copy to Working Parties 4A, 5A, 5C, 5D, 6A, 7C and 7D) - Propagation characteristics in the range 275-450 GHz in preparation for WRC-19 agenda item 1.15
|
WP 1A
|
AI1.15
|
2016-06-13 |
|
[ 227 ]
|
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison activities on the latest version of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) standards overviews and work plans
|
WP 1A
|
|
2016-06-13 |
|
[ 226 ]
|
Liaison statement to Working Parties 7C and 7D (copy to Working Parties 3J, 3K, 3M, 4A, 5A, 5C, 5D and 6A) - Request for characteristics of passive systems operating in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15
|
WP 1A
|
AI1.15
|
2016-06-13 |
|
[ 225 ]
|
Update on standards activities
|
Region 2 Rapporteur
|
|
2016-06-13 |
|
[ 224 ]
|
Liaison statement to ITU-T Study Group 5 and ITU-D Study Group 2 (copy for information to ITU-R Working Parties 4A, 5A, 5B, 5C, 5D and 6A) - WHO:fundamental safety principles for protection against non-ionizing radiation
|
SG 1
|
|
2016-06-13 |
|
[ 223 ]
|
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing...
|
WP 1B
|
|
2016-06-13 |
|
[ 222 ]
|
Liaison statement to Working Parties 5A and 5C on infrastrucutre sharing (copy to Working Parties 4C and 5C) - Innovative regulatory tools to support enhanced shared use of the spectrum
|
WP 1B
|
208-1/1
|
2016-06-13 |
|
[ 221 ]
|
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D study period 2014-2017, with respect to Chapter 1 - New/emerging spectrum management approaches (copied to ITU-R Working Parties 1A, 1C, 5A, 5B, 5C, 5D, and 6A for information)
|
WP 1B
|
|
2016-06-13 |
|
[ 220 ]
|
Update on recent activities within CEPT
|
ITU Region 1 (CEPT) Rapporteur
|
|
2016-06-09 |
|
[ 219 ]
|
Liaison statement to ITU-R Working Parties 5A and 5C (copy to ITU-R Working Parties 3J, 3K, 3M, 4A, 5D, 6A, 7C and 7D) - Preparations for WRC-19 agenda item 1.15 - Request for characteristics of land-mobile and fixed service applications in the frequency range 275-450 GHz as related to WRC-19 agenda item 1.15
|
WP 1A
|
|
2016-06-08 |
|
[ 218 ]
|
Proposals for test environments and deployment scenarios for IMT-2020 radio interface technologies
|
Telefon AB - LM Ericsson
,
DOCOMO, Inc.
,
Qualcomm, Inc.
|
|
2016-06-07 |
|
[ 217 ]
|
Proposals for working document towards a preliminary draft new Report ITU-R M.[IMT-2020.TECH PERF REQ]
|
AT&T, Inc.
,
China Mobile Communications Corporation
,
DaTang Telecommunication Technology & Industry Holding Co. Ltd
,
Huawei Technologies Co. Ltd.
,
Intel Corporation
,
NTT DOCOMO, Inc.,
,
Qualcomm, Inc.
,
Telefon AB - LM Ericsson
,
Telstra Corporation Ltd.
,
ZTE Corporation
|
|
2016-06-07 |
|
[ 216 ]
|
Considerations on targets for IMT-2020 technical performance requirements
|
Telefon AB - LM Ericsson
,
Qualcomm, Inc.
|
|
2016-06-07 |
|
[ 215 ]
|
Consideration on Report ITU-R M.[IMT-2020.SUBMISSION]
|
Huawei Technologies Co. Ltd.
,
Intel Corporation
,
Nokia Solutions and Networks Oy
,
Qualcomm, Inc.
,
Telefon AB - LM Ericsson
,
Telstra Corporation Ltd.
,
ZTE Corporation
|
|
2016-06-07 |
|
[ 214 ]
|
Consideration on channel model for IMT-2020 Evaluation
|
Nokia Solutions and Networks Oy
|
|
2016-06-07 |
|
[ 213 ]
|
Proposal for Document IMT-2020/001, "IMT-2020 Background"
|
Orange
,
Telecom Italia S.p.A.
|
|
2016-06-07 |
|
[ 212 ]
|
Proposed modifications to "IMT-2020 Process" document
|
Orange
,
Telecom Italia S.p.A.
|
|
2016-06-07 |
|
[ 211 ]
|
Proposals for a new Report on technical and operational aspects of Machine-Type Communications
|
Thales SA
|
|
2016-06-07 |
|
[ 210 ]
|
Report on the recent activities of Wireless World Research Forum (WWRF)
|
WWRF Liaison Rapporteur
|
|
2016-06-07 |
|
[ 209 ]
|
Gap analysis of 3GPP above 6 GHz channel model for IMT-2020 Evaluation
|
Finland
|
|
2016-06-07 |
|
[ 208 ]
|
Proposed study on International Mobile Telecommunications (IMT) applications for verticals
|
Telefon AB - LM Ericsson
|
229-4/5
|
2016-06-07 |
|
[ 207 ]
|
Proposals to working document towards draft liaison statement to Task Group 5/1 on spectrum needs for the terrestrial component of IMT in the frequency range between 24.25 GHz and 86 GHz
|
Nokia Solutions and Networks Oy
,
NTT DOCOMO, Inc.
,
Samsung Electronics Co., Ltd.
|
|
2016-06-07 |
|
[ 206 ]
|
Proposal for the revision of Recommendation ITU-R M.1036-5 to include frequency arrangement in the band 1 427-1 518 MHz
|
United Arab Emirates
,
Egypt (Arab Republic of)
,
Morocco (Kingdom of)
|
|
2016-06-07 |
|
[ 205 ]
|
Answer to liaison statement to 3GPP on revision of Report ITU-R M.2291
|
NEC Corporation
,
Nokia Solutions and Networks Oy
,
Qualcomm, Inc.
,
Samsung Electronics Co., Ltd.
,
Telecom Italia S.p.A.
,
Telefon AB - LM Ericsson
|
|
2016-06-07 |
|
[ 204 ]
|
Answer to liaison statement to 3GPP on work towards revision 1 of Recommendations ITU-R M.2070 and M.2071 - Questions for clarification within 3GPP specifications
|
NEC Corporation
,
Nokia Solutions and Networks Oy
,
Qualcomm, Inc.
,
Samsung Electronics Co., Ltd.
,
Telecom Italia S.p.A.
,
Telefon AB - LM Ericsson
|
|
2016-06-07 |
|
[ 203 ]
|
Proposal for a new Report and/or Recommendation on the technical feasibility of wireless industrial automation systems under WRC-19 agenda item 9.1 issue 9.1.8
|
Germany (Federal Republic of)
|
AI9.1
|
2016-06-07 |
|
[ 202 ]
(Rev.1) |
Activities related to IMT in Region 3
|
Region 3 Rapporteur
|
|
2016-06-07 |
|
[ 201 ]
|
Suggested modifications to the IMT-2020 schedule
|
Chairman, Ad Hoc Workplan
|
|
2016-06-07 |
|
[ 200 ]
|
Considerations on technical performance requirements for Report ITU-R M.[IMT-2020.TECH PERF REQ]
|
Japan
,
China (People's Republic of)
,
Korea (Republic of)
|
|
2016-06-07 |
|
[ 199 ]
|
Further considerations on technical performance requirements for Report ITU-R M.[IMT-2020.TECH PERF REQ]
|
Japan
|
|
2016-06-07 |
|
[ 198 ]
|
Proposed modification for IMT-2020/2 "IMT-2020 Process" document
|
Japan
|
|
2016-06-07 |
|
[ 197 ]
|
Considerations on service and spectrum requirements for Report ITU-R M.[IMT-2020.SUBMISSION]
|
Japan
|
|
2016-06-07 |
|
[ 196 ]
|
Consideration on channel model for IMT-2020 Evaluation
|
Japan
,
Korea (Republic of)
|
|
2016-06-07 |
|
[ 195 ]
|
Test environments in Report ITU-R M.[IMT-2020.EVAL]
|
Japan
|
|
2016-06-07 |
|
[ 194 ]
|
Proposal on operational characteristics of IMT-2020 systems for sharing and compatibility studies under WRC-19 agenda item 1.13
|
Japan
|
|
2016-06-07 |
|
[ 193 ]
|
Proposal on the compatibility study between IMT systems and BSS (sound) systems in the band 1 452-1 492 MHz under WRC-19 agenda item 9.1 (issue 9.1.2)
|
Japan
|
AI9.1
|
2016-06-07 |
|
[ 192 ]
|
Proposed modifications to working document towards preliminary draft new Recommendation ITU-R M.[IMT.MODEL]
|
Japan
|
|
2016-06-07 |
|
[ 191 ]
|
Proposed modification to the working document towards a preliminary draft revision of Recommendation ITU-R M.1036-5
|
Japan
|
|
2016-06-07 |
|
[ 190 ]
|
Proposed modifications to work programme plan for IMT in Working Party 5D Chairman's Report
|
Japan
,
Korea (Republic of)
|
|
2016-06-07 |
|
[ 189 ]
|
Draft Addendum 1 to Circular Letter 5/LCCE/59 on IMT-2020 development
|
Japan
,
China (People's Republic of)
,
Korea (Republic of)
|
|
2016-06-07 |
|
[ 188 ]
|
Proposal on channel model for IMT-2020
|
Beijing University of Posts and Telecommunications
,
Spark NZ Limited
|
|
2016-06-07 |
|
[ 187 ]
|
Proposals on modification of Recommendation ITU-R M.1036 with regard to the frequency arrangements
|
France
|
|
2016-06-07 |
|
[ 186 ]
|
Proposed modifications to working document towards preliminary draft new Recommendation ITU-R M.[IMT MODELLING]
|
France
|
|
2016-06-07 |
|
[ 185 ]
|
Proposed modifications to the working document towards a preliminary draft new [Recommendation or Report] ITU-R M.[MSS&IMT-ADVANCED SHARING]
|
Korea (Republic of)
|
|
2016-06-07 |
Results:1184 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8 -
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24
- Next

|
Multiple Document Download: Formats and Languages to be included (when available):