International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP5D : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP5D  C 

ITU-R WP5D

IMT Systems

Results:1183 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 433 ]  
 
Definition of bandwidth for IMT-2020     New Zealand     2017-02-06
[ 432 ]  
 
Proposal for the revision of Recommendation ITU-R M.1036-5 to include frequency arrangement in the band 3 400-3 700 MHz     Australia , Canada , New Zealand , United States of America     2017-02-06
[ 431 ]  
 
Progression of the working document towards a prelimininary draft revision of Recommendation ITU-R M.1036-5 - Frequency arrangements for implementations (IMT) in the bands identified for IMT in the Radio Regulations (RR)     Canada     2017-02-03
[ 430 ]  
 
Update Report on CITEL PCC.II activities     CITEL Rapporteur   229/5   2017-02-02
[ 429 ]  
 
Updated material on LTE-Advanced toward Revision 3 of Recommendation ITU-R M.2012     Alliance for Telecommunications Industry Solutions     2017-02-01
[ 428 ]  
 
Update proposals to the preliminary draft new Report ITU-R M.[IMT-2020. TECH PERF REQ] - Minimum requirements related to technical performance for IMT-2020 radio interface(s)     Germany (Federal Republic of)     2017-01-31
[ 427 ]  
 
Reply liaison statement to ITU-R Working Party 5D on characteristics of terrestrial IMT systems for frequency sharing/interference analysis in the frequency range between 24.25 GHz and 86 GHz     Director, BR     2017-01-31
[ 426 ]  
 
Liaison statement to ITU-D Study Group 1 Question 2/1 on broadband definition (copy to ITU-R Working Parties 4A, 4B, 4C, 5A, 5B, 5C, 5D and 6A for information) - Broadband access technologies, including IMT, for developing countries. What is the definition of Broadband?     CCV and SCV     2017-01-30
[ 425 ]  
 
Adjacent band compatibility studies of IMT-Advanced systems in the mobile service in the band below 1 518 MHz with respect ot systems in the mobile-satellite service in the frequency band 1 518-1 525 MHz     United Kingdom of Great Britain and Northern Ireland     2017-01-27
[ 424 ]  
 
Response to Questions on spectrum needs for IMT under WRC-19 agenda item 1.13     Singapore (Republic of)     2017-01-19
[ 423 ]  
 
Answer to Questions on spectrum needs for IMT under WRC-19 agenda item 1.13     Egypt (Arab Republic of)     2017-01-11
[ 422 ]  
 
Liaison statement on the completion of ITU-T Focus Group on IMT-2020 and start of normative work in ITU-T Study Group 13     ITU-T FG IMT -2020     2017-01-10
[ 421 ]  
 
Liaison statement on finalization of the revision of Recommendations ITU-R M.2070 and ITU-R M.2071 and studies on protection RNSS operation from unwanted emissions of IMT stations     Director, BR     2016-12-19
[ 420 ]  
 
Reply liaison statement to Working Party 5D - AMS parameters and work progress on the coexistence conditions between IMT and aeronautical mobile service in the band 4 800-4 990 MHz     WP 5B     2016-12-16
[ 419 ]  
 
Liaison statement to Working Party 5D - Update to characteristics of and protection criteria for radars operating in the radiodetermination service in the frequency range 3 100-3 700 MHz     WP 5B     2016-12-16
[ 418 ]  
 
Response liaison statement to ITU-R WP 5A on request for information on machine type communications (MTC) in the land mobile service     Director, BR     2016-12-15
[ 417 ]  
 
Liaison statement to ICAO (copied for information to ITU-R Working Party 5D) - Questions about the systems to be used, and the spectrum requirements, of GADSS     WP 5B     2016-12-16
[ 416 ]  
 
Liaison statement to ITU-R Working Parties 1A, 1C, 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C, 7D and ITU-D/ITU-R Joint Group WTDC Resolution 9 with copy to ITU-D Study Group 1 - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands...     WP 1B     2016-12-14
[ 415 ]  
 
Reply liaison statement to Working Parties 4C, 5A, 5C and 5D on the progress towards a preliminary draft new Report ITU-R SM.[REGULATORY TOOLS] (copied to ITU-R Working Parties 4A and 5B, ITU-R/ITU-D Joint Group oN WDTC Resolution 9 and ITU-D Study Group 1 for information)     WP 1B     2016-12-14
[ 414 ]  
 
Reply liaison statement to Working Party 5D - Work on WRC-19 agenda item 9.1, issue 9.1.8, and information on anticipated draft CPM text deadlines by contributing Groups for WRC-19 agenda item / issues where Working Party 5D is the responsible Group     WP 1B     2016-12-14
[ 413 ]  
 
Liaison statement to Working Parties 1B, 4A, 4C, 5A, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[SHARING-METHODS] - Methods for sharing between radiocommunications services     WP 1A     2016-12-13
[ 412 ]  
 
Liaison statement to ITU-T Study Group 15 (copy to Working Parties 5A, 5B, 5C, 5D, 6A and 6C) - Liaison statement on determination of Amendment 1 to Recommendation ITU-T G.9700 (2014)     WP 1A     2016-12-13
[ 411 ]  
 
Liaison statement to External Organizations (copy for information to Working Party 5D) - Request for Information on Machine Type Communications (MTC) in the land mobile service     WP 5A     2016-11-29
[ 410 ]  
 
Liaison statement to Working Party 5D - The use of International Mobile Telecommunications for broadband public protection and disaster relief applications     WP 5A     2016-11-29
[ 409 ]  
 
Liaison statement to external organisations (copy to Working Parties 5A and 5D for information) - Revision of Recommendation ITU-R F.1336-4 - Reference radiation patterns of omnidirectional, sectoral and low gain other directional antennas for the fixed and mobile services for use in sharing studies in the frequency range from 400 MHz to about 70 GHz     WP 5C     2016-11-24
[ 408 ]  
 
Recommendation ITU-R P.681-9 - Propagation data required for the design of Earth-space land mobile telecommunication systems     SG 3     2016-11-24
[ 407 ]  
 
Liaison statement to Working Parties 5A and 5D, ITU-T Study Groups 13 and 15, Metro Ethernet Forum (MEF) and Next Generation Mobile Networks (NGMN)     WP 5C     2016-11-24
[ 406 ]  
 
Liaison statement to Task Group 5/1 (copied for information to Working Parties 3J, 3K, 3M, 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, and 7D) - Preparations for WRC-19 agenda item 1.13     WP 5A   AI1.13   2016-11-23
[ 405 ]  
 
Liaison statement to Working Party 7B (copy for information to Working Party 5D) - Technical characteristics for WRC-19 agenda item 1.3     WP 5A   AI1.3   2016-11-23
[ 404 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 5C and 5D for information) - Working document towards a preliminary draft new Recommendation ITU-R S.[INTERF.AREA]     WP 5A     2016-11-23
[ 403 ]  
 
Reply liaison statement to ITU-R Working Party 6B (copy to Working Party 5D)     WP 5A     2016-11-23
[ 402 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 3M, 5C, 5D and 7D for information) - Operational requirements and technical characteristics of systems in the frequency band 51.4-52.4 GHz     WP 5A     2016-11-23
[ 401 ]  
 
Reply liaison statement to ITU-R Working Party 5D - Work on WRC-19 agenda item 9.1, issue 9.1.8     WP 5A   AI9.1   2016-11-23
[ 400 ]  
 
Liaison statement to Working Party 5D - Request for further information regarding the applicability of Recommendation ITU-R M.1390     WP 5A     2016-11-23
[ 399 ]  
 
Liaison Statement on LTE-based vehicle-to-vehicle communications     Director, BR     2016-11-09
[ 398 ]  
 
Reply liaison statement to Working Party 1A copied to Working Parties 1A, 3J, 3M, 4A, 4C 5A, 5C and 5D - Preliminary draft revision of Recommendation ITU-R SM.1448 - Determination of the coordination area around an erarth station in the frequency bands between 100 MHz and 105 GHz     WP 5B     2016-11-18
[ 397 ]  
 
Liaison statement to Working Parties 1A and 1B (copy for information to Working Party 4A, 4C, 5B, 5C, 5D and 7C) - Sharing schemes in the land mobile service on the basis of geographical use     WP 5A     2016-11-18
[ 396 ]  
 
Liaison statement to Working Party 1B (copy to Working Parties 4A, 4C and 5D) - Innovative regulatory tools to support enhanced shared use of the spectrum     WPs 5A and 5C     2016-11-18
[ 395 ]  
 
Liaison statement to ITU-D Study Group 1 (SG1), Question 2/1 (copy to ITU-R Coordination Committee for Vocabulary (CCV); Working Parties 4A, 4B and 4C; Working Parties 5B and 5D; Working Party 6A for information) - Broadband access technologies, including IMT, for developing countries - What is the definition of Broadband?     WPs 5A and 5C     2016-11-18
[ 394 ]  
 
Liaison statement to Working Parties 1A, 1B, 3M, 4A, 4C, 5A, 5B, 5D, 6A, 7B, 7C and 7D (copy to Task Group 5/1 for information) - Revision of Recommendation ITU-R F.699-7 - Reference radiation patterns for fixed wireless system antennas for use in coordination studies and interference assessment in the frequency range from 100 MHz to about 70 GHz     WP 5C     2016-11-16
[ 393 ]  
 
Liaison statement to ITU-R Working Parties 4A, 4C, 5A, 5D, 7B, 7C and 7D (copy for information to Working Parties 3K and 3M) - WRC-19 agenda item 1.14     WP 5C     2016-11-16
[ 392 ]  
 
Reply liaison statement to Working Party 4A (copy to Workign Parties 5A, 5D, 7D and 3M for information) - WRC-19 agenda item 9.1, issue 9.1.9     WP 5C     2016-11-16
[ 391 ]  
 
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 3J, 3K, 3M, 4A, 4C, 5B and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16     WP 5C     2016-11-16
[ 390 ]  
 
Liaison statement to Working Party 5A (copy to Working Parties 1A, 1B, 4A, 5B and 5D for information) - Study of sharing schemes in the land mobile service on the basis of geographical use     WP 5C     2016-11-16
[ 389 ]  
 
Liaison statement to Working Party 5D (copy to Working Parties 3K and 3M) - Modelling and simulation of IMT networks for use in sharing and compatibility studies     WP 6A     2016-11-04
[ 388 ]  
 
Liaison statement to Study Group 5 (copy to Working Party 5D) - Revision of Report ITU-R BT.2337 - Sharing and compatibility studies between digital terrestrial mobile broadband applications, including IMT, in the frequency band 470-694/698 MHz     WP 6A     2016-11-04
[ 387 ]  
 
Liaison statement to ITU-R Working Parties 5A and 5D - Global platform     WP 6B     2016-11-04
[ 386 ]  
 
Liaison statement to ITU-D Study Group 1, Question 2/1 (copy to Coordination Committee for Vocabulary (CCV), Working Parties 4B, 4C, 5A, 5B, 5C, 5D and 6A) - Broadband access technologies, including IMT, for developing countries - What is the definition of Broadband?     WP 4A     2016-11-02
[ 385 ]  
 
Reply liaison statement to Task Group 5/1 on parameters for WRC-19 agenda item 1.13 (copy for information to Working Parties 5C and 5D)     WP 7B   AI1.13   2016-11-01
[ 384 ]  
 
Reply liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D and 6A concerning WRC-19 agenda item 1.7 - WRC-19 agenda item 1.7     WP 7B   AI1.7   2016-11-01
Results:1183 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21 - 22 - 23 - 24  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-02-15