Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 83 ]
|
Working document towards a preliminary draft new Report ITU-R SM.[INNOVATIVE REGULATORY TOOLS] - Innovative regulatory tools to support enhanced shared use of the spectrum and the infrastructure of telecommunications network
|
United States of America
|
|
2016-11-08 |
|
[ 82 ]
|
Proposed frequency bands for wireless power transmission systems
|
Robert Bosch GmbH
|
Q210/1
|
2016-11-07 |
|
[ 81 ]
|
Liaison statement WPT activities
|
European Telecommunications Standards Institute
|
|
2016-11-02 |
|
[ 80 ]
|
Liaison statement - Possible new frequency range(s) for global harmonisation of UWB SRD applications
|
European Telecommunications Standards Institute
|
|
2016-11-02 |
|
[ 79 ]
|
Liaison statement to Coordination Committee for Vocabulary (CCV) and Standardization Committee for Vocabulary (SCV), (copy to ITU-R Study Group 1 and Working Party1B) - Proposal to add Broadcasting terms to the ITU Terminology Database
|
SG 6
|
|
2016-11-04 |
|
[ 78 ]
|
Liaison statement to Working Party 5A (copy to Working Parties 1B, 5B, 5C, 3K and 3M) WRC-19 agenda item 1.1
|
WP 6A
|
AI1.1
|
2016-11-04 |
|
[ 77 ]
|
This document has been withdrawn
|
WP 6A
|
|
2016-11-04 |
|
[ 76 ]
|
Liaison statement to ITU-R Working Party 1B - Regarding working document towards a draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES]
|
WP 7D
|
|
2016-11-01 |
|
[ 75 ]
|
Liaison statement to Working Party 1A (copy to Working Parties 1B, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
|
WP 7D
|
Q210/3
|
2016-11-01 |
|
[ 74 ]
|
Reply liaison statement to Working Party 1B (copy to Working Party 5A) - Working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES] - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities
|
WP 7C
|
|
2016-10-28 |
|
[ 73 ]
|
Liaison statement to Working Parties 1B and 5A - Work on WRC-19 agenda item 9.1 issue 9.1.8
|
WP 5D
|
AI9.1
|
2016-10-24 |
|
[ 72 ]
|
Liaison statement from ITU-D Study Group 2 Question 9/2 to ITU-T and ITU-R Study Groups on ongoing collaboration
|
ITU-D SG 2
|
|
2016-10-24 |
|
[ 71 ]
|
Liaison statement to Working Party 1B - Clarification of terms used in Recommendation ITU-R S.1503-2
|
WP 4A
|
|
2016-10-24 |
|
[ 70 ]
|
Liaison statement to Working Parties 1A, 1B, 1C, 5A, 5B, 5C, 7A and 7D - Radio frequency ranges for wireless power transfer (WPT)
|
WP 6A
|
Q210/1
|
2016-10-21 |
|
[ 69 ]
|
Reply liaison statement to Working Party 1B - Response to request for comments on working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES]
|
WP 4A
|
|
2016-10-20 |
|
[ 68 ]
|
Liaison statement on information about work that is being carried out within work under study in ITU-T Q7/5
|
ITU-T SG 5
|
|
2016-10-18 |
|
[ 67 ]
|
Reply liaison statement to Working Party 1B on infrastructure sharing (copy to Working Parties 4A, 4C, 5A and 5C) - Innovative regulatory tools to support enhanced shared use of the spectrum
|
WP 5D
|
|
2016-10-17 |
|
[ 66 ]
|
Reply liaison statement to Working Party 1B on infrastructure sharing (copy to Working Parties 4A, 5A, 5C and 5D) - "Innovative" regulatory tools to support enhanced shared use of the spectrum
|
WP 4C
|
208-1/1
|
2016-09-27 |
|
[ 65 ]
|
Liaison statement on recent work by JCA-IoT and SC&C
|
ITU-T JCA-IoT & SC&C
|
|
2016-09-26 |
|
[ 64 ]
|
Information on the preparation of texts for the draft CPM Report to WRC-19
|
Chairman, CPM-19
|
|
2016-09-19 |
|
[ 63 ]
|
Liaison statement to ITU-R Working Party 1A (copy to Working Party 1B and RG-WPT) - Information on current status of study on Question ITU-R 210-3/1 "Wireless power transmission" in APT Wireless Group
|
Asia-Pacific Telecommunity
|
Q210/1
|
2016-09-16 |
|
[ 62 ]
|
Note to the Chairmen of Study Groups 1 and 5 (copy to Working Parties 5A and 1B) - Working Party 5D perspective on Workshop on "Spectrum management for Internet of Things deployment"
|
Chairman, WP 5D
|
|
2016-07-04 |
|
[ 61 ]
|
Reply liaison statement to the Coordination Committee for Vocabulary (CCV) and the Standardization Committee for Vocabulary (SCV) (copy to ITU-R Study Group 6 and Working Party 1B) - Terminology relating to the transition from analogue to digital radio technologies
|
SG 1
|
|
2016-07-04 |
|
[ 60 ]
|
Liaison statement to Working Parties 1B & 5A - Information on anticipated draft CPM text deadlines by contributing groups for WRC-19 agenda items / issues where Working Party 5D is the responsible group
|
WP 5D
|
|
2016-06-29 |
|
[ 59 ]
|
Reply liaison statement to ITU-R /ITU-D Joint Group on WTDC Resolution 9 on the progress of ongoing work on WTDC Resolution 9 (Rev. Dubai, 2014) during the ITU-D Study period 2014-2017 (copied to ITU-R Working Parties 1A, 1B, 1C, 5A, 5B, 5C and 6A for information)
|
WP 5D
|
|
2016-06-28 |
|
[ 58 ]
|
WPT activities
|
European Telecommunications Standards Institute
|
|
2016-06-17 |
|
[ 57 ]
|
Liaison to ITU-R Working Parties 1A & 1B on Technical Report on UWB worldwide
|
European Telecommunications Standards Institute
|
|
2016-06-17 |
|
[ 56 ]
|
Liaison statement to Working Party 7D (copy to Working Parties 1B, 5A, 5B, 5C, 6A and 7A) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to protection of the passive services
|
WP 1A
|
Q210/3
|
2016-11-16 |
|
[ 55 ]
|
Reply liaison statement to Working Party 5B (copied for information to Working Parties 1B, 5A, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam relative to the services under the purview of WP 5B
|
WP 1A
|
Q210/1
|
2016-11-16 |
|
[ 54 ]
|
Reply liaison statement to Working Party 5A (copied for information to Working Parties 1B, 5B, 5C, 6A, 7A and 7D) - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
|
WP 1A
|
Q210/1
|
2016-11-16 |
|
[ 53 ]
|
Liaison statement to Working Party 1B - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
|
WP 1A
|
Q210/1
|
2016-11-16 |
|
[ 52 ]
|
Liaison statement to Working Parties 1B, 5A, 5B, 5C, 6A, 7A and 7D - Radio frequency ranges for wireless power transmission using technologies other than radio frequency beam
|
WP 1A
|
Q210/1
|
2016-06-16 |
|
[ 51 ]
+Ann.1-15 |
Report of the meeting of Working Party 1B (Geneva, 2 - 9 June 2016)
|
Chairman, WP 1B
|
|
2016-06-08 |
|
[ 50 ]
|
Final list of participants - Working Party 1B (Geneva, 2-9 June 2016)
|
Director, BR
|
|
2016-06-08 |
|
[ 49 ]
|
Liaison statement from ITU-D Study Group 2 Question 7/2 to ITU-T Study Group 5, ITU-R Study Groups 1, 5, 6 and their relevant Working Parties on ongoing collaboration
|
ITU-D SG 2
|
|
2016-06-06 |
|
[ 48 ]
|
Liaison statement on Recommendation ITU-T G.9959
|
ITU-T SG 15
|
|
2016-06-06 |
|
[ 47 ]
|
CISPR reply liaison statement to ITU-R WP 1A on WPT - Study Question ITU-R 210-3/1 "Wireless Power Transmission"
|
Chairman, WP 1B
|
|
2016-06-02 |
|
[ 46 ]
|
List of documents issued (Documents 1B/1 - 1B/46)
|
BR Study Groups Department
|
|
2016-06-01 |
|
[ 45 ]
|
Report on CISPR activities June 2015 to May 2016
|
Rapporteur, SG 1 RG on Liaison with CISPR
|
|
2016-06-01 |
|
[ 44 ]
|
RF human exposure - WHO: Fundamental safety principles for protection against non-ionizing radiation
|
ATDI
|
|
2016-05-26 |
|
[ 43 ]
|
Proposed liaison reply to ITU-D/ITU-R Joint Group on WTDC Resolution 9 (Rev. Dubai, 2014) regarding relevant text from the chapters of the draft Report on WTDC Resolution 9
|
France
|
|
2016-05-30 |
|
[ 42 ]
|
Working document towards a draft new Report ITU-R SM.[DATABASE SPECTRUM MANAGEMENT CHALLENGES]
|
France
|
|
2016-05-26 |
|
[ 41 ]
|
Proposal to develop a new ITU-R Recommendation on licenced shared access
|
France
|
|
2016-05-26 |
|
[ 40 ]
|
Revision proposal of Report ITU-R SM.2303 to update information and to incorporate assessment process and methodology in studies on the impact of wireless power transmission systems applied to electric vehicles
|
Japan
|
Q210/1
|
2016-05-26 |
|
[ 39 ]
|
Proposed modification to preliminary draft modification to Report ITU-R SM.2012-4 - Economic aspects of spectrum management
|
Colombia (Republic of)
|
|
2016-05-26 |
|
[ 38 ]
|
Liaison statement to Working Parties 4A, 4C, 5B and 5C (copied for information to Working parties 1B, 3J, 3K, 3M and 5D) - Request for technical characteristics relevant to the work under WRC-19 agenda item 1.16
|
WP 5A
|
AI1.16
|
2016-05-25 |
|
[ 37 ]
|
Proposed scope for the working document toward a preliminary draft new Report ITU-R SM.[INNOVATIVE REGULATORY TOOLS]
|
Germany (Federal Republic of)
,
Finland
|
|
2016-05-25 |
|
[ 36 ]
|
Modification proposal for the working document towards a preliminary draft new Report ITU-R SM.[CRS SPECTRUM MANAGEMENT CHALLENGES]
|
Finland
|
|
2016-05-25 |
|
[ 35 ]
|
Liaison statement to Working Parties 1A, 1B, 4A, 5B, 5C and 5D - Study of sharing schemes in the land mobile service on the basis of geographical use, frequencies, services, new technologies and applications
|
WP 5A
|
|
2016-05-25 |
|
[ 34 ]
(Rev.1) |
Possible studies to address WRC-19 agenda item 9.1.7
|
Egypt (Arab Republic of)
,
Oman (Sultanate of)
,
Qatar (State of)
|
|
2016-05-25 |
Results:383 total items. Result page:
Previous -
1 -
2 -
3 -
4 -
5 -
6 -
7 -
8
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):