International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1B : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1B  C 

ITU-R WP1B

Spectrum Management Methodologies and Economic Strategies

Results:381 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 281 ]  
 
Proposal on preliminary draft revision of Recommendation ITU-R SM.2110-0     Japan   Q210/1, AI9.1   2018-05-28
[ 280 ]  
 
Commentary on working document towards a preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]- [Methodology for spectrum management of wireless power transmission (WPT)]     International Amateur Radio Union   AI9.1   2018-05-28
[ 279 ]  
 
Proposed revision of Report ITU-R SM.2093-2     Korea (Republic of)     2018-05-28
[ 278 ]  
 
Proposed revision of Report ITU-R SM.2012-5     Korea (Republic of)     2018-05-28
[ 277 ]  
 
Proposal regarding the working document towards a preliminary draft revision of Recommendation ITU-R SM.1896     Germany (Federal Republic of)     2018-05-28
[ 276 ]  
 
Proposed on study of spectrum efficiency and economic value     China (People's Republic of)     2018-05-28
[ 275 ]  
 
Consideration on coexistence between WPT4EV and SFTS     China (People's Republic of)     2018-05-28
[ 274 ]  
 
Proposed modification to the working document towards draft CPM text on WRC-19 agenda item 9.1, issue 9.1.7     China (People's Republic of)   AI9.1   2018-05-28
[ 273 ]  
 
The study of coexistence between WPT4EV and MF broadcast     China (People's Republic of)     2018-05-28
[ 272 ]  
 
Proposal of draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6 Resolution 958 (WRC-15) Annex item 1 (WPT4EV)     China (People's Republic of)     2018-05-28
[ 271 ]  
 
Wireless power transfer (WPT) further studies on the performance of MF AM sound broadcasting receivers in the presence of interference from WPT     British Broadcasting Corporation (BBC)   Q210/1   2018-05-25
[ 270 ]  
 
Statement to ITU-R Working Party 1A (copy to ITU-R Working Party 1B) - Information on medium frequency broadcast operation and listening in portions of Region 2 for WPT Impact Assessment     North American Broadcasters Association (NABA)     2018-05-25
[ 269 ]  
 
Working document towards draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6     Turkey   AI9.1   2018-05-25
[ 268 ]  
 
Proposals for CPM text for agenda item 9.1 issue 9.1.6     United Kingdom of Great Britain and Northern Ireland   AI9.1   2018-05-25
[ 267 ]  
 
Study on the impact of WPT-EV on the 60 kHz standard frequency and time signal service     United Kingdom of Great Britain and Northern Ireland     2018-05-25
[ 266 ]  
 
Proposed editorial update of five Recommendations     Chairman, SG 1 CG on editorial review     2018-05-28
[ 265 ]  
 
Comments to the ITU-R Questions, Recommendations and Reports assigned to ITU-R Working Party 1B     Chairman, SG 1 CG on editorial review     2018-05-28
[ 264 ]  
(Rev.1) 
Proposed modifications to the working document towards a preliminary draft revision of Report ITU-R SM.2015     Korea (Republic of)     2018-05-25
[ 263 ]  
 
Proposal on draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6 - Resolution 958 (WRC-15) Annex item 1 (WPT4EV)     Korea (Republic of)   Q210/1, AI9.1   2018-05-25
[ 262 ]  
(Rev.1) 
Proposed modification of a preliminary draft revision of Recommendation ITU-R SM.2110-0     Korea (Republic of)   Q210/1, AI9.1   2018-05-25
[ 261 ]  
 
Proposed revision of preliminary draft new Report ITU-R SM.[WPT-SPEC-MNGM]     Korea (Republic of)   Q210/1, AI9.1   2018-05-25
[ 260 ]  
 
Proposals towards draft new Report ITU-R SM.[SPECTRUM AUCTIONS] -Assessment of the economic efficiency and economic value of the radio spectrum     Russian Federation   Q240/1   2018-05-25
[ 259 ]  
 
Working document towards a draft revision of Report ITU-R SM.2405-0 - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities     Colombia (Republic of)     2018-05-25
[ 258 ]  
 
Liaison statement from ITU-D Study Group 1 Question 4/1 to ITU-R Study Group 1 and ITU-T Study Group 3 on collaboration among the three sectors of ITU on economic issues     ITU-D SG 1     2018-05-24
[ 257 ]  
 
Liaison statement from ITU-D Study Group 1 Question 1/1 to ITU-R Study Groups 1, 4 and 5 on collaboration     ITU-D SG 1     2018-05-24
[ 256 ]  
 
Liaison statement from ITU-D Study Group 1 Question 2/1 to ITU-R Study Group 1 on collaboration     ITU-D SG 1     2018-05-22
[ 255 ]  
 
Proposed revision of Report ITU-R SM.2012-5 - Economic aspects of spectrum management     ATDI   Q240/1   2018-05-20
[ 254 ]  
 
Reply from the taskforce Chair of SAE J2954 on wireless power transfer and alignment to the November 2017 liaison statement from ITU-R Working Party 1B     Director, BR     2018-05-21
[ 253 ]  
 
Proposed revisions to the working document toward a preliminary draft new Report ITU-R SM.[LPWAN.MTC]     United States of America     2018-05-18
[ 252 ]  
 
Working towards draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6 - Resolution 958 (WRC-15), Annex item 1     United States of America   AI9.1   2018-05-18
[ 251 ]  
 
Proposed revisions to working document towards draft CPM text on WRC-19 agenda item 9.1, issue 9.1.7 - Resolution 958 (WRC-15), Annex item 2     United States of America   AI9.1   2018-05-18
[ 250 ]  
 
Reply liaison statement to Working Party 1B (copy to Working Party 1A for information) - Work on WRC-19 agenda item 9.1, issue 9.1.6     WP 7A   AI9.1   2018-05-18
[ 249 ]  
 
Proposals to the working document towards a preliminary draft new Report ITU-R SM.[LPWAN.MTC]     Sigfox     2018-05-16
[ 248 ]  
 
Liaison statement on mechanisms for pricing of licenses for mobile/broadband/fixed     ITU-T SG 3     2018-05-08
[ 247 ]  
 
Preliminary position on WRC-19 Agenda     World Meteorological Organization     2018-05-03
[ 246 ]  
 
Liaison statement to ITU-R Working Party 1B (copy to ITU-R Working Party 1A) - Information on current activities in APT Wireless Group on Wireless Power Transmission (WPT)     Asia-Pacific Telecommunity     2018-05-01
[ 245 ]  
 
"Conclusion" section of the draft CPM texts on the 9 issues under WRC-19 agenda item 9.1     Chairman, CPM   AI9.1   2018-04-30
[ 244 ]  
 
Liaison statement to Working Party 1B (copy for information to Working Parties 1A and 5B) - Draft CPM text for WRC-19, agenda item 9.1, issue 9.1.6     WP 6A   AI9.1   2018-04-26
[ 243 ]  
 
Liaison statement to Working Party 1B - Further comments on the Report ITU-R SM.2405 - Spectrum management principles, challenges and issues related to dynamic access to frequency bands by means of radio systems employing cognitive capabilities     WP 6A     2018-04-26
[ 242 ]  
 
Liaison statement to Working Party 1A (copy for information to Working Parties 1B, 3L, 5A, and 5B) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5 kHz]     WP 6A     2018-04-26
[ 241 ]  
 
Final consolidated contributions to the Rapporteur Group draft CPM text on WRC-19 agenda item 9.1, issue 9.1.6 - Resolution 958 (WRC-15) Annex item 1 (WPT4EV)     Rapporteur, RG-WPT     2018-03-28
[ 240 ]  
 
Liaison statement to Working Party 1B (copy for information to Working Party 1C) - WRC-19 agenda item 9.1, issue 9.1.7     WP 4A   AI9.1   2018-03-21
[ 239 ]  
 
Reply liaison statement to Working Parties 1B and 5A - Work on WRC-19 agenda item 9.1, issue 9.1.8     WP 5D   AI9.1   2018-02-13
[ 238 ]  
 
Liaison statement to Working Parties 3L, 5A, 5B and 6A (copy to Working Party 1B for information) - Working document towards a preliminary draft new Report ITU-R SM.[WPT_100-148.5kHz]     WP 1A     2017-12-12
[ 237 ]  
+Ann.1-13 
Report on the fourth 2015-2019 meeting of Working Party 1B (Geneva, 23 - 30 November 2017)     Chairman, WP 1B     2017-11-30
[ 236 ]  
(Rev.1) 
Final List of Participants - Working Party 1B (Geneva, 23-30 November 2017)     Director, BR     2017-11-30
[ 235 ]  
 
Liaison statement on information about work that is being carried out which is under study in ITU-T Q3/5; ITU-R and ITU-D     ITU-T SG 5     2017-11-23
[ 234 ]  
 
List of documents issued (Documents 1B/193 - 1B/234)     BR Study Groups Department     2017-11-22
[ 233 ]  
(Rev.1) 
Report of the work of the Rapporteur Group on Wireless Power Transmission     Acting Chairman, RG-WPT meeting     2017-11-22
[ 232 ]  
 
Report on CISPR activities from June to November 2017     Rapporteur, SG 1 RG on Liaison with CISPR , Rapporteur to CISPR on WPT issues     2017-11-21
Results:381 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2019-06-26