International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP4A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP4A  C 

ITU-R WP4A

Efficient Orbit/Spectrum Utilization for FSS and BSS

Results:681 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 256 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties 1A, 1B, 4A and 5A for information) - Status of compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     WP 5D     2013-07-17
[ 255 ]  
 
Liaison statement to Study Group 4, Working Party 5B, Study Group 7 and ICAO - Request for measured data in connection with Question ITU-R 233/3 and Recommendation ITU-R P.528     WP 3K   233/3   2013-07-05
[ 254 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5B, 5C, 5D, 6A, 7B, 7C and 7D - Working document towards a preliminary draft new Report ITU-R SM.[WHITE-SPACE] - Spectrum management principles and spectrum engineering techniques for the use of white spaces by radio systems employing cognitive capabilities     WP 1B     2013-06-21
[ 253 ]  
 
Liaison statement to Working Parties 4A, 4C, 5A, 5C, 5D, 7B, 7C and 7D - WRC-15 agenda item 9.1, Issue 9.1.6 - Resolution 957 (WRC-12) - Studies towards review of the definitions of fixed service, fixed station and mobile station     WP 1B     2013-06-21
[ 252 ]  
 
Liaison statement to Working Party 4C (copy to Working Party 4A) - WRC-15 agenda item 1.10     WP 5B     2013-06-12
[ 251 ]  
 
Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.6     WP 5B     2013-06-12
[ 250 ]  
 
Reply liaison statement to Working Party 4A - WRC-15 agenda item 1.8     WP 5C     2013-06-05
[ 249 ]  
 
Liaison statement to Working Party 4A (copy to Working Parties 5A and 7B for information) - WRC-15 agenda item 1.9.1     WP 5C     2013-06-05
[ 248 ]  
 
Liaison statement to Working Party 4A - WRC-15 agenda item 1.6     WP 5C     2013-06-05
[ 247 ]  
 
Liaisons statement to Working Party 4A - Proposed suppression of certain SF-series Recommendations     WP 5C     2013-06-05
[ 246 ]  
 
Liaison statement to Working Party 4A - WRC-15 agenda item 1.6     WP 5A     2013-06-05
[ 245 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to Working Parties 4A, 4B, 4C, 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) - Reply liaison statement on spectrum requirements for terrestrial mobile broadband (excluding IMT) related to WRC-15 agenda item 1.1     WP 5A     2013-06-04
[ 244 ]  
 
Liaison statement on technical characteristics of wireless aids for hearing impaired people operating in the VHF and UHF frequency range (COM 16-LS 14) [to ITU-R WP 5A and ITU-T SG 16]     ITU-T JCA-AHF     2013-05-23
[ 243 ]  
 
Liaison statement on nomination of JCA-AHF representatives     ITU-T JCA-AHF     2013-05-14
[ 242 ]  
+Ann.1-36 
Report on the meeting of Working Party 4A (Geneva, 2-10 May 2013)     Chairman, WP 4A     2013-05-10
[ 241 ]  
 
Final list of participants - Working Party 4A (Geneva, 2-10 May 2013)     Director, BR     2013-05-10
[ 240 ]  
 
Clarification to the survey of status of FSS assignments in the MIFR in the 10.95-30.0 GHz bands (WRC-15 Agenda item 1.5)     Director, BR     2013-05-06
[ 239 ]  
 
Liaison Statement to Working Party 4A - [Preliminary] draft new Report ITU-R S.[VSAT]     WP 4B     2013-05-03
[ 238 ]  
 
Reply liaison statement to Working Party 5B (copy for information to Working Party 4A) - WRC-15 Agenda item 1.5     WP 4B     2013-05-03
[ 237 ]  
 
List of documents issued (Documents 4A/125 - 4A/237)     Br Study Groups Department     2013-05-01
[ 236 ]  
 
Working document - Examination under § 2.2 of Annex 4 of Appendix 30B     Luxembourg     2013-04-25
[ 235 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[R1.FSS] - Assessment on use of spectrum in the 10-17 GHz band for the fixed-satellite service in Region 1 (GSO)     Luxembourg     2013-04-25
[ 234 ]  
 
WRC-15 Agenda item 1.6.1/1.6.2: Consideration of the band 14.5 - 14.8 GHz     Intelsat, LLC     2013-04-25
[ 233 ]  
 
US broadcasters'submission in response to the FCC's notice of proposed rule making concerning the amendment of the Commission's rules with regard to commercial operations in the 3 550-3 650 MHz band     North American Broadcasters Association (NABA)     2013-04-24
[ 232 ]  
 
Technical criteria used in application of RR No.9.41 in respect of coordination under RR No.9.7     Telenor ASA     2013-04-25
[ 231 ]  
 
Initial evaluation of the 8 degree coordination arc between geostationary fixed-satellite service networks in 17.7-20.2 GHz and 27.5-30 GHz     United Kingdom of Great Britain and Northern Ireland , France , Germany (Federal Republic of) , Norway     2013-04-25
[ 230 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R S.[GSO E/S IN 29.5-30.0//19.7-20.2 GHz] - Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 19.7 - 20.2 GHz and 29.5 - 30.0 GHz     United Kingdom of Great Britain and Northern Ireland , France , Germany (Federal Republic of) , Luxembourg , Netherlands (Kingdom of the) , Norway     2013-04-25
[ 229 ]  
 
Proposed changes to draft revision of Recommendation ITU-R S.1503-1     United Kingdom of Great Britain and Northern Ireland     2013-04-25
[ 228 ]  
 
Working document towards draft CPM text on WRC-15 Agenda item 9.1.5     International Civil Aviation Organization     2013-04-25
[ 227 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R S.[FSS-REF_FOR_UAS] - Technical and operational characteristics of typical satellite communication links for potential use by UA Control and non-payload communication (CNPC) Agenda Item 1.5 (WRC15)     Germany (Federal Republic of)     2013-04-25
[ 226 ]  
 
Protection criterion for FSS in sharing studies related to Agenda item 1.5     Germany (Federal Republic of)     2013-04-25
[ 225 ]  
 
Proposal for liaison statement to Working Party 5D and Joint Task Group 4-5-6-7 - Suitable frequency ranges for IMT above 6 GHz     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)     2013-04-25
[ 224 ]  
 
Proposal for liaison statement to ITU-R Working Party 5D - Compatibility study between FSS networks and IMT systems in the band 3 400-3 600 MHz for small cell deployments     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)     2013-04-25
[ 223 ]  
 
Proposed modification to working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz band for the GSO fixed-satellite service in Regions 2 and 3     Asia Satellite Telecommunications Co. Ltd. (AsiaSat)     2013-04-25
[ 222 ]  
 
Working document on guidelines that could be used by Administrations wishing to license ESOMPs mounted on vessels and operating in NGSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services     United States of America     2013-04-25
[ 221 ]  
 
Working document on the guidelines that could be used by Administrations wishing to license airborne ESOMPs operating in NGSO FSS systems in the frequency range 27-29.1 GHz while ensuring protection of terrestrial services     United States of America     2013-04-25
[ 220 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R S.[GSO FSS E/S IN 29.5-30.0/19.7-20.2 GHz] - Technical and operational requirements for earth stations on mobile platforms operating with geostationary FSS satellite networks in the bands 19.7-20.2 GHz and 29.5 - 30.0 GHz     United States of America     2013-04-25
[ 219 ]  
 
Working document - Technical and operational studies towards the preparation of a preliminary draft new Report regarding earth stations on mobile platforms in the 17.3-19.7 and 27.5-29.5 GHz bands of the geostationary satellite orbit fixed-satellite service     United States of America     2013-04-25
[ 218 ]  
 
Feasibility of FSS/AMS/Mobile sharing in the frequency band 14.5-15.35 GHz     United States of America     2013-04-25
[ 217 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[RES756] - Studies on possible reduction of the coordination arc and technical criteria used in application of RR No. 9.41 in respect of coordination under RR No. 9.7     Canada     2013-04-24
[ 216 ]  
 
Proposed elements for the Director's Report related to the experience in the application of the Radio Regulatory procedures and other relates matters - Review of the provisions associated with the use of the band 15.4-15.7 GHz by the FSS (Earth-to-space and space-to-Earth)     Canada     2013-04-24
[ 215 ]  
 
Proposed modifications to the working document towards draft CPM text on WRC-15 Agenda item 1.7     Canada     2013-04-24
[ 214 ]  
 
Sharing study between FS and FSS (space-to-Earth) in the band 7 150-7 250 MHz     France     2013-04-24
[ 213 ]  
 
Sharing study between FSS (space-to-Earth) and SRS (Earth-to-space) in the band 7-8 GHz range     France     2013-04-24
[ 212 ]  
 
Sharing study between the potential EESS (Earth to-space) and FSS allocations in the band 7-8 GHz range     France     2013-04-24
[ 211 ]  
 
Sharing study between the potential EESS (Earth to-space) and FSS allocations in the band 7-8 GHz range     France     2013-04-24
[ 210 ]  
 
Protection of SRS near-Earth missions in highly elliptical orbits (HEO) from proposed FSS (space-to-Earth) emissions in the band 7 190-7 235 MHz     France     2013-04-24
[ 209 ]  
 
Working document towards a preliminary draft new Report ITU-R S.[R2R3.FSS] - Assessment on use of spectrum in the 13-17 GHz range for the GSO fixed-satellite service in Regions 2 and 3     United States of America     2013-04-24
[ 208 ]  
 
Working document towards text for the draft Report to the Conference Preparatory Meeting (CPM) on WRC-15 Agenda Item 1.7     United States of America     2013-04-24
[ 207 ]  
 
Liaison statement to Working Party 5B - Preliminary draft new Report ITU-R M.[UAS-PERF-AND-REQ] - WRC Agenda item 1.5 WD PDNR [UAS-FSS] FSS assumptions and characteristics     United States of America     2013-04-24
Results:681 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)
Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2015-11-16