International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1A  C 

ITU-R WP1A

Spectrum Engineering Techniques

Results:248 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 98 ]  
 
Liaison statement to ITU-R Working Party 1A and ITU-T Study Group 9 (copied for information to ITU-T Study Groups 5 and 15, and ITU-R Working Parties 3L, 4C, 5D, 6A, 7C and 7D) - Impact from wired telecommunication (including PLT) on Radiocommunication systems     WPs 5A, 5B and 5C     2013-05-31
[ 97 ]  
 
Joint liaison statement to ITU-R Working Party 1A and ITU-T Study Group 15 (copy to ITU-R Working Parties 1C, 5D & 6A for information) - Coexistence of wired and wireless communications systems - Further developments on Recommendation ITU-T G.FAST     WPs 5A, 5B and 5C     2013-05-31
[ 96 ]  
 
Results of the 20th RAG meeting (Geneva, 22 to 24 May 2013)     Chairman, SG 1     2013-05-30
[ 95 ]  
 
Comments on ITU-T Recommendations K.60 and K.MHN as a response to the liaison statement from ITU-T SG5 in Document 1A/67 and its Addendum 1     European Broadcasting Union     2013-05-28
[ 94 ]  
 
Comments on Annex 3 to Document 1A/39 (Working document towards a PDN Report ITU-R SM.[SMART_GRID])     European Broadcasting Union     2013-05-28
[ 93 ]  
 
Information paper - Wireless power transmission     China (People's Republic of)   210-3/1   2013-05-28
[ 92 ]  
 
Working document towards a PDN Report ITU-R SM.[SMART_GRID] - Smart grid power management systems     Institute of Electrical and Electronics Engineers, Inc.     2013-05-28
[ 91 ]  
 
Improvement on working document towards a preliminary draft new Report ITU-R SM.[PLT RAD-PSD] - Methodologies for relating the radiation from PLT installations to PLT modem output     Korea (Republic of)     2013-05-28
[ 90 ]  
 
Working document towards a preliminary draft new Recommendation ITU-R SM.[PORTABLE_WPT] and associated Correspondence Group     Korea (Republic of)   210-3/1   2013-05-28
[ 89 ]  
 
Report of the Rapporteur Group on the revision of the ITU Handbook on "Computer aided techniques for spectrum management (2005)"     Rapp. RG WP 1A rev. ITU H'book on "Computer..."     2013-05-28
[ 88 ]  
 
On unwanted emissions in the out-of-band and spurious domains     Germany (Federal Republic of)     2013-05-27
[ 87 ]  
 
Proposal for a new Question on the characterization of the unwanted emission in the spurious domain     Germany (Federal Republic of)     2013-05-27
[ 86 ]  
 
Material for inclusion in the preliminary draft new Report on wireless power transmission - Japan's studies and experiments on wireless power transmission     Japan   210-3/1   2013-05-27
[ 85 ]  
(Rev.1) 
Proposal for new ITU-R texts on wireless power transmission     Japan   210-3/1   2013-05-27
[ 84 ]  
 
Working document towards a preliminary draft new Report ITU-R SM.[THZ_TREND] -Technology trends of active services in the band above 275 GHz     Japan     2013-05-27
[ 83 ]  
 
Draft new Question ITU-R SM.[THZ] - Technical and operational characteristics of the active services operating in the range 275-1 000 GHz     Japan   264/4, 238-1/3, 235-1/7   2013-05-27
[ 82 ]  
 
Rapporteur Group on coexistence of wired telecommunication with Radiocommunication systems     Rapporteur, RG wired and radio     2013-05-27
[ 81 ]  
 
Input on working document towards a preliminary draft revision of Recommendation ITU-R SM.1132-2 - General principles and methods for sharing between radiocommunication services or between radio stations     United States of America     2013-05-24
[ 80 ]  
 
A working document towards a draft new Recommendation ITU-R SM.[WPT] - Wireless Power Transmission (WPT) systems for wireless charging of mobile devices     United States of America   210-3/1   2013-05-24
[ 79 ]  
 
Liaison statement to the JCA-AHF (copy for information to ITU-R WPs 1A, 1B, 5A, 5C and 6A, ITU-T FG-AVA, SGs 2 and 16, ITU-D SGs 1 and 2 and ETSI ERM TG 17) - Reply liaison statement on draft revision of Recommendation ITU-R M.1076     WP 5B     2013-05-24
[ 78 ]  
 
Results of the 19th RAG meeting (Geneva, 25 to 27 June 2012)     Chairman, SG 1     2013-05-16
[ 77 ]  
 
Liaison statement on nomination of JCA-AHF representatives     ITU-T JCA-AHF     2013-05-14
[ 76 ]  
 
Liaison statement to ITU-T Study Group 5 and ITU-R Working Party 1A (copy to ITU-R Working Parties 1C, 5A, 5B, and 5C for information) - Coexistence of wired and wireless communications systems     WP 6A     2013-05-08
[ 75 ]  
 
Liaison statement to Working Party 1A (and for information to ITU-R Working Parties 5A, 5B and 5C and ITU-T Study Groups 5, 9 & 15) - Considerations on wired telecommunication systems being developed under G.fast and J.HiNoC     WP 6A     2013-05-08
[ 74 ]  
(Rev.1) 
Man-made noise measurements in the range below 30 MHz at safety related receiving stations in Germany     Germany (Federal Republic of)     2013-04-26
[ 73 ]  
 
Recommendation ITU-R SM.329 - Editorial correction in English version     Israel (State of)     2013-04-25
[ 72 ]  
 
Liaison statement to ITU-R Working Party 1A - Wireless Power Transmission (WPT)     Asia-Pacific Telecommunity     2013-04-12
[ 71 ]  
 
Reply liaison statement to ITU-R Working Party 1A and Working Parties 5A, 5B and 5C on impact from wired telecommunication (including PLT) on radiocommunication systems     ITU-T SG 9     2013-02-19
[ 70 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Party 4A, Working Party 4B, Working Party 4C, Working Party 5A, Working Party 5B, Working Party 5C, Working Party 6A, Working Party 7B, Working Party 7C, Working Party 7D, Working Party 1A, Working Party 3K, Working Party 3M) - Further elaboration on suitable frequency ranges and their suitability     WP 5D     2013-02-18
[ 69 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to WPs 4A, 4B, 4C, 5A, 5B, 5C, 6A, 7B, 7C, 7D, (WPs 1A, 3K, 3M)) - Suitable frequency ranges above 6 GHz     WP 5D     2013-02-18
[ 68 ]  
 
Liaison statement to JTG 4-5-6-7 on adjacent band compatibility between the IMT uplink and digital terrestrial television (DTT) broadcasting under WRC-15 Agenda item 1.2 (copy to Working Party 1A and Working Party 6A for information)     WP 5D     2013-02-18
[ 67 ]  
+Add.1 
Liaison statement - Study Group 5 activities related to interference between radio signal and device or cable connected to wired broadband networks and cable television networks     ITU-T SG 5     2013-02-15
[ 66 ]  
 
Reply liaison statement on draft revision of Recommendation ITU-R M.1076     ITU-T JCA-AHF     2013-02-13
[ 65 ]  
 
Studies on cognitive radio systems (white space devices) in Europe     Germany (Federal Republic of)     2013-02-04
[ 64 ]  
 
Liaison statement to Working Parties 5D and 6A (copy to Working Party 1A for information) - Adjacent band compatibility between the mobile broadband uplink and digital terrestrial television broadcasting under WRC-15 Agenda item 1.2     JTG 4-5-6-7     2012-11-30
[ 63 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Working Parties (4A, 4B, 4C, 5B, 5C 5D, 6A, 7B, 7C, 7D 1A, 3K 3M) for information) - WRC-15 Agenda item 1.1 - Working Party 5A initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     WP 5A     2012-11-16
[ 62 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 (copy to Workin Parties (4A, 4B, 4C 5B, 5C, 5D, 6A, 7B, 7C, 7D, 1A, 3K, 3M) for information) - WRC-15 Agenda item 1.1 - Sharing considerations for the 5-6 GHz frequency range for WRC-15 Agenda item 1.1     WP 5A     2012-11-16
[ 61 ]  
(Rev.1) 
Liaison statement to ITU-R Working Parties 1A, 4C, 5D, 6A, 7C and 7D (copy to ITU-R Working Party 3L and to ITU-T Study Groups 5, 9 and 15 for information and/or action if any)     WPs 5A, 5B and 5C     2012-11-16
[ 60 ]  
 
Liaison statement to Working Parties 1A, 1B, 5B, 5C and 6A (copy to ITU-T FG-AVA, ITU-T Study Group 2, ITU-D Study Group 2, ITU-D Study Group 1, ETSI ERM TG 17, JCA-AHF) - Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing     WP 5A     2012-11-15
[ 59 ]  
 
Liaison statement to Working Party 5A, 1A, 1B, 5C and 6A, ITU-T FG-AVA, ITU-T Study Group 2, ITU-D Study Group 2, ITU-D Study Group 1, ETSI ERM TG 17, JCA-AHF - Draft revision of Recommendation ITU-R M.1076 - Wireless communication systems for persons with impaired hearing     WP 5B     2012-11-14
[ 58 ]  
 
Liaison statement to Working Parties 1A and 1B (for information to WPs 4A, 4B, 4C, 5A, 5B, 5D, 6A, 6B, 6C, 7B, 7C, 7D on further studies on cognitive radio systems (CRS))     WP 5C     2012-11-14
[ 57 ]  
(Rev.1) 
Liaison statement to Joint Task Group 4-5-6-7 (copy for information to the relevant Working Parties of Study Groups 1, 3, 4, 5, 6 and 7) - WRC-15 Agenda item 1.1 operating characteristics of AMT systems     WP 5B     2012-11-09
[ 56 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 WRC-15 Agenda item 1.1 (copy to Working Parties 1A, 3K, 3M, 4A, 4B, 4C, 5A, 5C, 5D and 7C for information)     WP 5B     2012-11-09
[ 55 ]  
 
Liaison statement to Working Party 5A (copy to Working Parties 1A and 1B for information) - Further studies on cognitive radio systems     WP 5B     2012-11-09
[ 54 ]  
 
Liaison statement - Request for inclusion of Recommendation ITU-R BT.1206 in Annex 4 to Recommendation ITU-R SM.1541     WP 6A     2012-11-02
[ 53 ]  
 
Liaison statement - Comment on Recommendation ITU-R SM.2028 - Protection distance calculation between inductive systems and radiocommunication services using frequencies below 30 MHz     WP 6A     2012-11-02
[ 52 ]  
 
Liaison statement - Activities related to smart grid     JCA-SG&HN     2012-10-30
[ 51 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 - Initial information on spectrum requirements studies for WRC-15 Agenda item 1.1     WP 5D     2012-10-16
[ 50 ]  
 
Liaison statement to Joint Task Group 4-5-6-7 on suitable frequency ranges under WRC-15 Agenda item 1.1     WP 5D     2012-10-16
[ 49 ]  
 
Liaison statement to Study Group 1 (copy to Working Party 1A) - Active services operating above 275 GHz     WP 7D     2012-10-10
Results:248 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2020-12-16