Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 185 ]
|
Question ITU-R 1-6/5 - Interference protection ratios and minimum field strengths required in the land mobile services
|
SG 5
|
|
2015-10-23 |
|
[ 184 ]
|
Question ITU-R 231-1/3 - The effect of electromagnetic emissions from man-made sources on the Radiocommunication systems and networks
|
SG 3
|
|
2015-08-31 |
|
[ 183 ]
|
This document has been withdrawn
|
BR Study Group Department
|
|
2015-09-09 |
|
[ 182 ]
|
Liaison statement about ongoing ITU-T Q1/13 work on WPT (Wireless Power Transfer) Service
|
ITU-T SG13
|
|
2015-07-29 |
|
[ 181 ]
|
Liaison statement to ITU-D/ITU-R Joint Group for Resolution 9 on work items during the 2014-2017 study period (copy for information to ITU-R SG 1, SG 5, SG 6 and their relevant working parties on work items pertinent to WTDC Resolution 9)
|
WP 5A
|
|
2015-07-16 |
|
[ 180 ]
|
Note to Chairmen of Study Groups 1, 5 and 6 - Suppression of Opinion ITU-R 95
|
Chairman, Study Group 4
|
|
2015-07-15 |
|
[ 179 ]
|
Liaison statement on the latest version of the Home Network Transport (HNT) standards overview and work plan
|
ITU-T SG 15
|
|
2015-07-14 |
|
[ 178 ]
|
Liaison statement on the latest versions of the Access Network Transport (ANT) standards overview and work plan
|
ITU-T SG 15
|
|
2015-07-14 |
|
[ 177 ]
|
Liaison statement on the latest versions of the Access Network Transport (ANT), Smart Grid and Home Network Transport (HNT) standards overviews and work plans
|
ITU-T SG 15
|
|
2015-07-14 |
|
[ 176 ]
|
Liaison statement on ITU Inter-Sector coordination
|
ITU-T TSAG - LS 013
|
|
2015-06-15 |
|
[ 175 ]
|
Summary record of the meeting of Radiocommunication Study Group 1 (Geneva, 11-12 June 2015)
|
Chairman, SG 1
|
|
2015-06-12 |
|
[ 174 ]
|
Final list of participants - Study Group 1 (Geneva, 11-12 June 2015)
|
Director, BR
|
|
2015-06-12 |
|
[ 173 ]
|
List of documents issued (Documents 1/119 - 1/173)
|
BR Study Groups Department
|
|
2015-06-10 |
|
[ 172 ]
(Rev.1) |
Liaison statement for information to ITU-R Study Group 6 and ITU-T Study Group 15 (copy to ITU-R Study Groups 5 and 7 and ITU-D Study Group 2) (Question ITU-R 221/1) - Liaison activities with CENELEC
|
SG 1
|
|
2015-06-12 |
|
[ 171 ]
|
Executive Report of the meeting of Working Party 1A (Geneva, 3-10 June 2015)
|
Chairman, WP 1A
|
|
2015-06-10 |
|
[ 170 ]
|
Executive Report of the meeting of Working Party 1B (Geneva, 3-10 June 2015)
|
Chairman, WP 1B
|
|
2015-06-10 |
|
[ 169 ]
(Rev.1) |
Revision of Report ITU-R SM.2303-0 - Wireless power transmission using technologies other than radio frequency beam
|
WP 1A
|
210-3/1
|
2015-06-10 |
|
[ 168 ]
|
Executive Report to Study Group 1
|
Chairman, WP 1C
|
|
2015-06-10 |
|
[ 167 ]
|
Proposed suppression of Question ITU-R 224/1 - Technical convergence with respect to terrestrial fixed, mobile, and broadcasting interactive multimedia applications and the associated regulatory environment
|
WP 1B
|
|
2015-06-10 |
|
[ 166 ]
|
Draft revision of Question ITU-R 205-1/1 - Long-term strategies of spectrum utilization
|
WP 1B
|
|
2015-06-10 |
|
[ 165 ]
|
Draft revision of Question ITU-R 216/1 - Spectrum redeployment as a method of national spectrum management
|
WP 1B
|
|
2015-06-10 |
|
[ 164 ]
|
Draft revision of Question ITU-R 208/1 - Alternative methods of national spectrum management
|
WP 1B
|
|
2015-06-10 |
|
[ 163 ]
(Rev.1) |
Draft new Recommendation ITU-R SM.[I/Q_TIMING] - Precision of time information in output data of monitoring receivers
|
WP 1C
|
|
2015-06-10 |
|
[ 162 ]
(Rev.1) |
Report ITU-R SM.2356-0 - Procedures for planning and optimization of spectrum-monitoring networks in the VHF/UHF frequency range
|
WP 1C
|
|
2015-06-10 |
|
[ 161 ]
(Rev.1) |
Report ITU-R SM.2355-0 - Spectrum monitoring evolution
|
WP 1C
|
235/1
|
2015-06-10 |
Results:185 total items. Result page:
1 -
2 -
3 -
4
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):