Contributions |
|
Number
|
Title
|
Source
|
AI/Question
|
Date
|
|
[ 173 ]
(Rev.1) |
Executive Report of the meeting of Working Party 1B (Geneva, 25 May - 1 June 2011)
|
Chairman, WP 1B
|
|
2011-06-01 |
|
[ 172 ]
|
Proposed extension of the completion date of ITU-R Questions assigned to Working Party 1A
|
WP 1A
|
|
2011-06-01 |
|
[ 171 ]
|
Draft new Report ITU-R SM.[PLT+80 MHz] - Impact of power line telecommunication systems on radiocommunication systems operating in the VHF and UHF bands above 80 MHz
|
WP 1A
|
|
2011-06-01 |
|
[ 170 ]
|
Editorial update of seven ITU-R Recommendations
|
WP 1A
|
|
2011-06-01 |
|
[ 169 ]
|
Draft reply liaison statement from SG 1 to Subcommittee H of CISPR - Limits for the protection of radio services
|
WPs 1A and 1B
|
|
2011-06-01 |
|
[ 168 ]
|
Executive Report of the meeting of Working Party 1A (Geneva, 25 May - 1 June 2011)
|
Chairman, WP 1A
|
|
2011-06-01 |
|
[ 167 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.1879 - The impact of power line high data rate telecommunication systems on radiocommunication systems
|
WP 1A
|
221/1
|
2011-06-01 |
|
[ 166 ]
|
Draft modification of Report ITU-R SM.2158-1 - Impact of power line telecommunication systems on radiocommunication systems operating in the LF, MF, HF and VHF bands below 80 MHz
|
WP 1A
|
221/1
|
2011-06-01 |
|
[ 165 ]
|
Executive Report of the meeting of Working Party 1C (25 May - 1 June 2011)
|
Chairman, WP 1C
|
|
2011-06-01 |
|
[ 164 ]
|
Draft revision of Question ITU-R 233/1 - Measurement of spectrum occupancy
|
WP 1C
|
|
2011-06-01 |
|
[ 163 ]
|
Draft revision of Resolution ITU-R 23-1 - Extension of the international monitoring system to a worldwide scale
|
WP 1C
|
32/1
|
2011-06-01 |
|
[ 162 ]
|
Draft new Report ITU-R SM.[TDOA-AOA] - Comparison of time-difference-of-arrival and angle-of-arrival methods
|
WP 1C
|
|
2011-06-01 |
|
[ 161 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.1708 - Field-strength measurements along a route with geographical coordinate registrations
|
WP 1C
|
214/1, 215/1
|
2011-06-01 |
|
[ 160 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.1682 - Methods for measurements on digital broadcasting signals
|
WP 1C
|
214/1
|
2011-06-01 |
|
[ 159 ]
|
Draft modification of Report ITU-R SM.2125 - Parameters of and measurement procedures on H/V/UHF monitoring receivers and stations
|
WP 1C
|
|
2011-06-01 |
|
[ 158 ]
|
Proposed extension of the completion date and suppression of ITU-R Questions assigned to Working Party 1C
|
WP 1C
|
|
2011-06-01 |
|
[ 157 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.1723-1 - Mobile spectrum monitoring unit
|
WP 1C
|
|
2011-06-01 |
|
[ 156 ]
|
Draft new Question ITU-R [PWRGRD]/1 - Impact on radiocommunication systems from wireless and wired data transmission technologies used for the support of power grid management systems
|
WP 1A
|
|
2011-05-31 |
|
[ 155 ]
|
Draft modification of Recommendation ITU-R SM.329-11 - Unwanted emissions in the spurious domain
|
WP 1A
|
|
2011-05-31 |
|
[ 154 ]
(Rev.1) |
Draft modification of Annex 8 to Recommendation ITU-R SM.1541-3 - OoB domain emission limits for primary radar systems
|
WP 1A
|
|
2011-05-31 |
|
[ 153 ]
(Rev.1) |
Draft new Report ITU-R SM.[WRC-12-1.22]
|
WP 1A
|
|
2011-05-31 |
|
[ 152 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.854-2 - Direction finding and location determination at monitoring stations
|
WP 1C
|
|
2011-05-31 |
|
[ 151 ]
|
Draft editorial revision of Recommendation ITU-R SM.1135
|
WP 1C
|
|
2011-05-31 |
|
[ 150 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.1839 - Test procedure for measuring the scanning speed of radio monitoring receivers
|
WP 1C
|
|
2011-05-31 |
|
[ 149 ]
|
Draft revision of Report ITU-R SM.2153-1 - Technical and operating parameters and spectrum use for short-range radiocommunication devices
|
WP 1B
|
|
2011-05-31 |
|
[ 148 ]
|
Proposal with respect to possible the draft new ITU-R Resolution [CRS] "Studies on the implementation and use of cognitive radio systems"
|
Russian Federation
|
|
2011-05-26 |
|
[ 147 ]
|
Information document from TSB Director on "ITU-T activities on ICT, climate change and the environment"
|
Director, TSB
|
|
2011-05-24 |
|
[ 146 ]
|
Wireless telecommunication standards under development by IEEE 802 containing cognitive radio capabilities for operation in the TV White Space
|
IEEE
|
|
2011-05-18 |
|
[ 145 ]
|
Status and comments on the ITU-R Questions, Recommendations and Reports assigned to the Study Group 1
|
Korea (Republic of)
|
|
2011-05-18 |
|
[ 144 ]
|
ITU-R Study Group 5 Recommendation ITU-R M.1177-4 to be brought to the attention of Study Groups 1 and 4
|
BR Study Group Department
|
|
2011-05-18 |
|
[ 143 ]
|
Liaison to ITU-R on protection of radio services
|
CISPR
|
|
2011-05-12 |
|
[ 142 ]
|
Liaison statement to ITU-R Study Group 1 and Study Group 5 regarding G.wnb, narrowband wireless home networking
|
ITU-T SG 5
|
|
2011-05-04 |
|
[ 141 ]
|
Liaison statement to ITU-T Study Group 15 on narrowband wireless home networking (copy to ITU-R Study Group 1 and Working Party 5A for information)
|
WP 5D
|
|
2011-04-21 |
|
[ 140 ]
|
ITU-R Study Group 6 Question 32-1/6 to be brought to the attention of ITU-R Study Groups 1 and 5
|
BR Study Group Department
|
|
2011-03-23 |
|
[ 139 ]
(Rev.1) |
Liaison statement - New versions of the Access Network Transport (ANT) Standardization Overview and Work Plan
|
ITU-T SG 15
|
|
2011-03-08 |
|
[ 138 ]
|
Liaison to ITU-R SG 5 and TSAG regarding narrowband wireless home networking
|
ITU-T SG15
|
|
2011-03-03 |
|
[ 137 ]
|
Note from Study Group 6 to the RAG proposal for revision to the guidelines for the working methods and/or Resolution ITU-R 1
|
SG 6
|
|
2010-12-16 |
|
[ 136 ]
+Ann.1-2 |
Summary Record of the meeting of Radiocommunication Study Group 1 (Geneva, 27 September 2010)
|
Chairman, SG 1
|
|
2010-09-30 |
|
[ 135 ]
|
Final List of Participants - Study Group 1 (Geneva, 27 September 2010)
|
Director, BR
|
|
2010-09-27 |
|
[ 134 ]
|
List of documents issued
|
BR Study Group Department
|
|
2010-09-24 |
|
[ 133 ]
|
Liaison statement to ITU-R Study Group 1 - Resolution 9 - "Participation of countries, particularly developing countries, in spectrum management"
|
ITU-D SG 2
|
|
2010-09-24 |
|
[ 132 ]
(Rev.1) |
Draft new Recommendation ITU-R SM.[SPEC-OCC-MEASUREMENT] - Spectrum occupancy measurements - Proposal to merge Recommendations ITU-R SM.182, ITU-R SM.1536 and ITU-R SM.1793 into a new Recommendation
|
WP 1C
|
|
2010-09-24 |
|
[ 131 ]
|
Draft new Report ITU-R SM.[SRD-MEAS] -SRD measurements
|
WP 1C
|
|
2010-09-24 |
|
[ 130 ]
|
Draft new Report ITU-R SM.[APP10] - Use of Appendix 10 of the Radio Regulations to convey information related to emissions from both GSO and non-GSO space stations including geolocation information
|
WP 1C
|
232/1
|
2010-09-24 |
|
[ 129 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.1268-1 - Method of measuring the maximum frequency deviation of FM broadcast emissions at monitoring stations
|
WP 1C
|
|
2010-09-24 |
|
[ 128 ]
+Corr.1 |
Draft new Report ITU-R SM.[SPACE_RADIO_MONITORING_FACILITIES] - Measurement facilities available for the measurement of emissions from both GSO and non-GSO space stations
|
WP 1C
|
232/1
|
2010-09-24 |
|
[ 127 ]
(Rev.1) |
Draft revision of Recommendation ITU-R SM.1392-1 - Essential requirements for a spectrum monitoring system for developing countries
|
WP 1C
|
|
2010-09-24 |
|
[ 126 ]
|
Liaison statement - Strategies and policies concerning human exposure to electromagnetic fields
|
ITU-D SG 1
|
|
2010-09-23 |
|
[ 125 ]
|
Draft new Question ITU-R [SPEC-MONIT-EVOL]/1 - Spectrum monitoring evolution
|
WP 1C
|
|
2010-09-23 |
|
[ 124 ]
|
Draft editorial modification of Recommendations ITU-R SM.443-1, SM.1051-2, SM.1139, SM.1270, SM.1393, SM.1394, SM.1836, SM.1837, SM.1838, SM.1839 and SM.1840
|
WP 1C
|
|
2010-09-23 |
Results:197 total items. Result page:
-
1 -
2 -
3 -
4
- Next
|
Multiple Document Download: Formats and Languages to be included (when available):