International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : SG08 : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R SG08  C 

ITU-R SG08

Mobile radiodetermination amateur and related satellite services

Results:158 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
Contributions  Documents / Contributions
 
Number 
Title Source AI/Question
Date
[ 159 ]  
 
Liaison to SG 8 and WP 6S - Probabilistic methodology to assess interference from non-GSO BSS (sound) into terrestrial IMT-2000 systems in the band around 2.6 GHz     N/A     2003-04-25
[ 158 ]  
 
Liaison statement to the Chairman of Study Group 8 from Working Party 8F - Preliminary draft new Recommendation ITU-R M.[IMT.BSSMETH] [Doc.8/158]     WP 8F   229/8   2003-04-24
[ 157 ]  
+Corr.1 
Summary record of the meeting of Study Group 8     SG 8     2003-03-19
[ 156 ]  
 
Final List of Participants - Study Group 8     Director, BR     2003-02-05
[ 155 ]  
 
List of documents issued     BRSGD     2003-02-03
[ 154 ]  
 
Progress Report on the Joint Rapporteur Group 8A-9B (Wireless Access)     JRG 8A-9B Principal Rapporteur     2003-02-03
[ 153 ]  
+Corr.1 
Draft new Recommendation ITU-R M.[WAS 5 GHz Expansion-EESS]: Operational and deployment requirements for wireless access systems (WAS) including radio local area networks (RLANs) in the mobile service to facilitate sharing between these systems and systems in the Earth exploration-satellite service (active) and the space research service (active) in the band 5 470-5 570 MHz within     Chairman WP8A     2003-01-31
[ 152 ]  
(Rev.1)+Corr.1 
DNR ITU-R M.[8A-9B/RLAN-DFS] - Dynamic Frequency Selection (DFS) in Wireless Access Systems (WAS) including Radio Local Area Networks (RLAN) for the purpose of protecting the radiodetermination service in the 5 GHz band     JRG 8A-9B     2003-01-31
[ 151 ]  
 
Draft new Report ITU-R M.[IMPACT DFS_TH] - Impact of radar detection requirements of dynamic frequency selection on 5 GHz wireless access system receivers     Chairman, WP 8A     2003-01-30
[ 150 ]  
(Rev.1) 
Draft New Recommendation ITU-R M.[Method NWA Spectrum] - A method for assessing the required spectrum for broadband Nomadic Wireless Access systems including RLANs using the 5 GHz band     Chairman, WP 8A     2003-01-30
[ 149 ]  
 
Report of the SG 8 activities of TG 6/8     Special Rapporteur to TG 6/8     2003-01-28
[ 148 ]  
 
Submission to the forthcoming meeting of ITU-R Study Group 8 (4-5 February 2003)     Syrian Arab Republic     2003-01-28
[ 147 ]  
 
Proposed modification to draft new Question ITU-R [9 GHz]/8 - Compatibility of radionavigation and radiolocation services operating in the bands 9 000-9 200 MHz and 9 300-9 500 MHz     Italy     2003-01-28
[ 146 ]  
 
Adoption of DNR ITU-R M.[IMT-VIS] at ITU-R SG 8     Germany (Federal Republic of) , FTC Communications, Inc. , United Kingdom of Great Britain and Northern Ireland     2003-01-28
[ 145 ]  
 
2002 Progress Report from Working Party 8F     Chairman, WP 8F     2003-01-27
[ 144 ]  
 
Use of a statistical aspect in Recommendation ITU-R M.1464     France     2003-01-24
[ 143 ]  
 
Comments on the technical background for the proposed draft revision of Recommendation ITU-R M.1464 - Characteristics of radars and protection criteria for aeronautical radionavigation and meteorological radars in the radiodetermination service operating in the frequency band 2 700-2 900 MHz     France     2003-01-24
[ 142 ]  
 
Draft new Recommendation ITU-R M.[AMSS] - Technical and operational requirements for aircraft earth stations of aeronautical mobile-satellite service networks operating in the band 14-14.5 GHz (Earth-to-space)     France     2003-01-24
[ 141 ]  
 
Amendments to draft new Recommendation ITU-R M.[IMT-VIS] [Document 8/110]     France     2003-01-24
[ 140 ]  
 
Modifications to Annexe 3 of the Draft Revision to Recommendation ITU-R M.1464     France     2003-01-24
[ 139 ]  
 
Liaison statement to Study Group 8, Working Parties 8A, 8B, 8D, 8F and JRG 8A-9B: Ultra-Wideband technology     TG 1/8     2003-01-24
[ 138 ]  
 
Proposed additional changes to Document 8/97(Corr.1) to address work unable to be completed by WP 8B M.1464 Correspondence Group     United States of America     2003-01-24
[ 137 ]  
 
Ultra Wideband emissions studies     United States of America     2003-01-24
[ 136 ]  
 
Results of Working Party 8A review of Study Group 8 documents     Chairman, WP 8A     2003-01-20
[ 135 ]  
 
Results of Working Party 8B review of Study Group 8 documents     Chairman, WP 8B     2003-01-20
Results:158 total items.
Result page:  1 - 2 - 3 - 4  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2003-07-03