International Telecommunication Union   ITU
Français  Español
 
Site map Contact Us Print version
  Home : ITU-R : CACE : Circulars  Recently posted -  Search Meeting Documents
   
ITU-R CACE  CIR 

ITU-R CACE

Radiocommunication Assembly and Study Group work

Results:1037 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21  - Next Next
Circulars
 
Number 
Title Source AI/Question
Date
[ 1056 ]  
 
Proposed adoption of 11 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 6     2023-03-20
[ 1055 ]  
 
Meeting of Radiocommunication Study Group 4 (Satellite Services) - Geneva, 7 July 2023     Director, BR     2023-02-22
[ 1054 ]  
 
Approval of 1 revised ITU-R Recommendation     SG 5     2023-02-22
[ 1053 ]  
 
Meeting of Radiocommunication Study Group 3 (Radiowave Propagation) - Geneva, 2 June 2023     Director, BR     2023-02-17
[ 1052 ]  
 
Adoption of 6 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) - Suppression of 1 ITU-R Recommendation     SG 5     2023-02-15
[ 1051 ]  
 
Meeting of Radiocommunication Study Group 1 (Spectrum Management) - Geneva, 5 and 6 June 2023     Director, BR     2023-01-31
[ 1050 ]  
 
Radiocommunication Assembly 2023 (RA-23)     Director, BR     2023-02-10
[ 1049 ]  
 
Adoption of 2 new ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 7     2022-12-21
[ 1048 ]  
 
Proposed approval of 1 draft revised ITU-R Recommendation     SG 5     2022-12-19
[ 1047 ]  
 
Adoption of 2 new and 6 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 6     2022-12-19
[ 1046 ]  
 
Approval of 1 new ITU-R Question     SG 7     2022-12-20
[ 1045 ]  
(Rev.1) 
Proposed adoption of 6 draft revised ITU-R Recommendations simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence) - Proposed suppression of 1 ITU-R Recommendation     SG 5     2022-12-05
[ 1044 ]  
 
Meeting of Radiocommunication Study Group 6 (Broadcasting Service) - Geneva, 17 March 2023     Director, BR     2022-11-01
[ 1043 ]  
 
Proposed approval of 1 draft new ITU-R Question     SG 7     2022-10-11
[ 1042 ]  
 
Proposed adoption of 2 draft new ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 7     2022-10-11
[ 1041 ]  
 
Proposed adoption of 2 draft new and 6 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 6     2022-10-03
[ 1040 ]  
 
Adoption of 2 new ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 1     2022-09-21
[ 1039 ]  
 
Approval of 1 new and 1 revised ITU-R Recommendations     SG 1     2022-09-21
[ 1038 ]  
 
Approval of 1 new and 1 revised ITU-R Questions     SG 1     2022-09-21
[ 1037 ]  
 
Approval of 1 revised ITU-R Question     SG 3     2022-08-25
[ 1036 ]  
 
Adoption of 4 new and 10 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 3     2022-08-25
[ 1035 ]  
 
Meeting of Radiocommunication Study Group 5 (Terrestrial Services) - Geneva, 28 November 2022     Director, BR     2022-08-04
[ 1034 ]  
 
Proposed adoption of 2 draft new ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 1     2022-07-13
[ 1033 ]  
 
Proposed approval of 1 draft new and 1 draft revised ITU-R Question     SG 1     2022-07-13
[ 1032 ]  
 
Proposed approval of 1 draft new and 1 draft revised ITU-R Recommendations     SG 1     2022-07-13
[ 1031 ]  
 
Proposed adoption of 4 draft new and 10 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 3     2022-06-16
[ 1030 ]  
 
Proposed approval of 1 draft revised ITU-R Question     SG 3     2022-06-15
[ 1029 ]  
 
Adoption of 1 new and 3 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 6     2022-06-01
[ 1028 ]  
 
Meeting of Radiocommunication Study Group 4 (Satellite Services) - Geneva, 23 September 2022     Director, BR     2022-06-01
[ 1027 ]  
 
Approval of 1 new ITU-R Question     SG 6     2022-05-25
[ 1026 ]  
 
Meeting of Radiocommunication Study Group 7 (Science Services) - Geneva, 7 October 2022     Director, BR     2022-05-24
[ 1025 ]  
 
Approval of 1 revised ITU-R Recommendation     SG 5     2022-05-02
[ 1024 ]  
 
Meeting of Radiocommunication Study Group 6 (Broadcasting Service) - Geneva, 30 September 2022     Director, BR     2022-04-25
[ 1023 ]  
 
Proposed approval of 1 draft new ITU-R Question     SG 6     2022-03-21
[ 1022 ]  
 
Proposed adoption of 1 draft new and 3 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 6     2022-03-21
[ 1021 ]  
 
Approval of 1 new ITU-R Question     SG 5     2022-02-24
[ 1020 ]  
 
Adoption of 9 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 5     2022-02-24
[ 1019 ]  
 
Approval of 2 revised ITU-R Recommendations     SG 5     2022-02-24
[ 1018 ]  
 
Proposed approval of 1 draft revised ITU-R Recommendation     SG 5     2022-02-22
[ 1017 ]  
 
Meeting of Radiocommunication Study Group 3 (Radiowave Propagation) - Geneva, 13 June 2022     Director, BR     2022-02-17
[ 1016 ]  
 
Meeting of Radiocommunication Study Group 1 (Spectrum Management) - Geneva, 8 July 2022     Director, BR     2022-02-07
[ 1015 ]  
 
Approval of 2 revised ITU-R Recommendations     SG 4     2022-01-26
[ 1014 ]  
 
Adoption of 3 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 4     2022-01-26
[ 1013 ]  
 
Adoption of 1 new and 6 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 6     2022-01-25
[ 1012 ]  
 
Proposed adoption by correspondence of 1 draft revised ITU-R Recommendation     SG 5     2021-12-17
[ 1011 ]  
 
Proposed approval of 2 draft revised ITU-R Recommendations     SG 5     2021-12-17
[ 1010 ]  
 
Proposed adoption of 9 draft revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 5     2021-12-16
[ 1009 ]  
 
Proposed approval of 1 draft new ITU-R Question     SG 5     2021-12-16
[ 1008 ]  
 
Database of links and information for Electronic News Gathering (ENG)     Director, BR     2021-12-16
[ 1007 ]  
 
Adoption of 1 new and 2 revised ITU-R Recommendations and their simultaneous approval by correspondence in accordance with § A2.6.2.4 of Resolution ITU-R 1-8 (Procedure for the simultaneous adoption and approval by correspondence)     SG 7     2021-12-08
Results:1037 total items.
Result page:  Previous -  1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19 - 20 - 21  - Next Next
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-03-25